Loading...
HomeMy WebLinkAboutCSD-17-006 - Doon Pioneer Park Community Centre Expansion Business Case REPORT TO: Community Services Committee DATE OF MEETING: February 13, 2017 SUBMITTED BY: Mark Hildebrand, 519-741-2200 (7687) PREPARED BY: Natascha Voll, Community Centre Supervisor, 519-741-2200 (5361) WARD(S) INVOLVED: Ward 4 DATE OF REPORT: January 17, 2017 REPORT NO.: CSD-17-006 SUBJECT: DOON PIONEER PARK COMMUNITY CENTRE EXPANSION BUSINESS CASE RECOMMENDATION: That ‘Option 1’ of the Doon Pioneer Park Community Centre Expansion Business Case, as described in Appendix A to CSD-17-006, which has been revised to include the replacement of the existing splash pad at the centre, be approved and staff be directed to proceed with implementation. EXECUTIVE SUMMARY: A project team was developed, made up of staff and neighbourhood association members, to work with a consultant to complete the DPPCC business case. The project team determined the most appropriate size and configuration of the DPPCC renovation and expansion. The goal of the expansion was to facilitate the long-term needs of the community, staff, agencies and stakeholders and accommodate the range of activities, programs, and social events that occur there. The business case forwards two options. Option one is recommended and includes a concept plan for an expansion, which meets many of the space needs, within the existing budget target of $3,752,919. However option one does not include the replacement of a splash-pad which currently exists at the DPPCC. The splash-pad was considered a priority during the engagement process, however it is an amenity not usually considered in the construction or expansion of a community centre. The splash- pad could not be considered in the scope of work, within the existing budget, without significantly impacting the facility space needs. *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. 7 - 1 On January 23, 2017, on final budget day, Council approved transferring $200,000 from the Upper Canada Park skate-park budget to fund the replacement of the existing splash-pad. This decision was made after the business case had been developed, and as a result, was not incorporated into the recommended option included in the business case. Therefore, staff are recommending Option One of the businss case be ammended to include the addition of the splash pad and then approved for implementation. BACKGROUND: The Doon Pioneer Park Community Centre (DPPCC), is located at 150 Pioneer Drive in Kitchener’s south end. The entire facility is 15,662 square feet, including the Pioneer Branch of the Kitchener Public library (KPL). The DPPCC occupies 9,720 square feet of the building. It is one of the City’s smaller community centres, similar in size to the Mill Courtland and Centreville Chicopee Community Centres. DPPCC is scheduled for a renovation and expansion in the 2017 capital budget. The facility was built in 1988 and opened for community use in 1989. The Doon Pioneer Park Community Association (DPPCA), a volunteer affiliated Neighbourhood Association, has offered recreation programs in the DPPCC since it opened. An expansion for the community centre was first discussed in 1999, and subsequently supported by the Community Centre Feasibility Study in 2000, the 2005 Leisure Facilities Master Plan, and the 2013 Leisure Facilities Master Plan update. First scheduled for 2007, plans for the expansion have been deferred 5 times, often due to limited resources. In 2013, as part of the Leisure Facilities Master Plan update, City Council passed a motion prioritizing indoor and outdoor facilities for development in the city. Council identified the DPPCC expansion as the number one priority for indoor recreation facilities. The growth in the south end of Kitchener has been significant, and the community has outgrown the facility’s current size and configuration. REPORT: The business case developed by the project team contains a comprehensive review and analysis of the current needs of the surrounding community and capacities of the DPPCC, based primarily on existing services, current demographic profiles, trends, and projected population and household numbers. Space and Usage The current facility includes a single-gym, two small programming rooms, a small reception and lobby space and an office for staff and the Doon Pioneer Park Community Association (DPPCA). The program rooms are available for rent to the public. The DPPCA offers recreation programming in the facility four sessions per year. Other services, including the provision of resources for families in financial need as well as summer camps for children and youth, are also offered in the centre. An average of 84 programs per session were offered last year. The fill rate for these programs ranged from 70% to 80%, and many programs regularly draw waitlists. 7 - 2 The existing Centre space is inadequate for current neighbourhood and community uses. The current single gym has a low ceiling. This space acts as a constraint to innovative programming, community participation and community rentals. A double gymnasium has become the standard for Community Centres, and increases both programming and rental opportunities. Similarly, larger spaces serve the community by providing opportunities for flexible programming and interaction. Recent community centre designs include multipurpose spaces that are large enough to be used for both active and passive programming. Existing space in the DPPCC is being used in ways for which it was not designed, as staff and volunteers attempt to meet community interests. The current office space for the Neighbourhood Association is an interior storage area that has been repurposed as an office; similarly, a staff office is used intermittently for programming. The bar adjoining the kitchen doubles as a storage room. Larger, purpose built spaces would support programming and the activities of the DPPCA. Outdoor amenities are also in need of repair and replacement. The existing splashpad, built in 1996, is at the end of its lifecycle, with limited pressure to operate the spray features. The splashpad was identified as a priority through the community engagement process. Demonstrated Need The contents of the DPPCC business case supports the proposed expansion. The DPPCC is one of fourteen community centres within the city of Kitchener and is the only centre located south of Bleams Road. This area has been one of the top suburban growth areas in the City of Kitchener over the last 10 years, and this is expected to continue for at least a few more. In 1989 when the DPPCC was officially opened, there were approximately 7,200 residents living in the area. In 2016, the population has grown to 20,028 people. The population is estimated to increase to 26,009 by 2031. The population distribution includes older adults who are aging in place, and will require accessible spaces and programming to keep them active, as well as families with children. These trends indicate that demand for community services will continue to rise. Proposed Facility Expansion The business case includes two conceptual options for the proposed expansion and renovation, considering the needs identified by the public and stakeholders, and budget limitations. Option One The recommended option, option one, outlines a concept plan which can be completed within the overall project budget of $3.7 million (not including the replacement of the splash pad discussed below). This option includes the addition of a double gymnasium (4,133 square feet), two program rooms, and moves the washrooms, offices and lobby space in the facility to allow for better visibility and flow. The concept includes a renovation of 3,950 square feet and an addition of 6,146 square feet for an estimated 7 - 3 15,800 square feet of Community Centre space. This addition would make the DPPCC similar in size to Country Hills and Kingsdale Community Centres. This proposed expansion meets most of the valued indoor needs identified during the engagement. Option Two Option two outlines a concept plan which includes all the same indoor amenities as option one. However, option two also includes the replacement of the splash-pad and an additional 800 square feet (approximate) of facility space. Maximizing the amount of space for programming was identified as a priority for the expansion. In this option, the two multipurpose rooms, office and reception areas are larger than in option one, borrowing from similar, effective spaces at other centres across the city. Although larger rooms and spaces can provide more flexibility in the type of programming that can be accommodated, this option cannot be constructed within budget and therefore is not recommended. Also, option one still provides the same overall space as our other mid-sized facilities such as Country Hills and Kingsdale. Doon Pioneer Park Splash-pad Doon Pioneer Park was the first community centre to have a splash-pad. However, over time its functionality has decreased and it is now in poor condition. During the public engagement for the business case, the splash-pad was seen as the most valuable outdoor amenity at the centre. As a result, it was considered in the scope of the expansion in option two, even though the inclusion of an amenity like this is not usually contemplated in a Community Centre expansion. Unfortunately, it became clear that attempting to include the splash pad within the community centre expansion budget would come at the cost of the expansion itself – defeating the original intent of the project and increasing the risk the expansion will not successfully meet the needs of the community for usable indoor space. Therefore the project team was recommending option one, not considering the splash-pad replacement unless additional funding could be aquired for this amenity. On final budget day, Council was presented with issue paper BD05 – Funding Shortfall for Doon Pioneer Park Expansion and Splash-Pad in report FCS-17-003. Within this issue paper, Council considered additional funding sources for the replacement of the Doon Pioneer Park Community Centre splash-pad. Among the options, staff forwarded the possibility of transferring $200,000 from the Upper Canada Skate-park funding, which has $550,000 scheduled in the capital forecast for 2017. The skate-park had been pushed out to 2019, and funding was not needed for 2017. Council approved moving $200,000 from the Upper Canada Skate-park budget to fund the Doon Pioneer Park Community Centre splash-pad. Based on the business case findings, and considering the project budget limitations and the direction from the January 23, 2017 Special Council meeting, staff are recommending option one be ammended to include the replacement of the splash pad and then approved for implementation. 7 - 4 If this report is approved, project design will begin in Spring 2017 with construction taking place mid 2018 to mid 2019. ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: The City of Kitchener has invested in the development and support of neighbourhood based recreation and leisure services for close to three decades. The Updated Leisure Facilities Master Plan (2013) identifies the longer term community centre needs as Kitchener continues to grow. Recommendation 31 states: “That the current planned community centre additions for Doon Pioneer Park Community Centre and Mill Courtland Community Centre be implemented.” The DPPCC expansion is a strategic action as part of the Safe and Thriving Neighbourhoods Priority: 3.5 - Continue to encourage active participation in existing recreational facilities while moving forward with the provision of new recreational opportunities in underserved areas of the city. 3.6 - Provide opportunities and support for citizens to lead the way in creative active and vibrant public places that promote people’s health, happiness and well-being by capitalizing on local community assets such as community centre, pools, arenas, libraries, parks, trails and other public spaces. FINANCIAL IMPLICATIONS: The cost of the recommendation option (Option One + splash pad) is estimated to be $3,952,919. The revised 2017 Capital budget for the DPPCC Expansion, including the reallocation of $200,000 from the Upper Canada Park skate-park budget to fund the replacement of the existing splash-pad is $3,974,000. COMMUNITY ENGAGEMENT: Extensive public and stakeholder engagement has been undertaken to determine the community needs for the centre expansion. In total, over 1,200 people were engaged through the process. The recommended expansion aims to address many of the comments heard through the engagement. Survey and stakeholder session results indicated that programming is the primary reason that residents visit the DPPCC. Fitness classes and children’s programming was highly valued. The gym and the multi-purpose room were identified as the indoor spaces that are most valued by the community. The majority of community programming takes place in these two spaces. A gym expansion was identified as a priority by survey respondents, followed by more and bigger meeting and multipurpose rooms. Larger, purpose built spaces would support program innovation and delivery. 7 - 5 The community survey identified the splash pad as the most valuable component of the outdoor space at the DPPCC. Approximately 44% of survey respondents listed the splash pad as the reason they visit the DPPCC. The inclusion of a splash pad in the overall project would connect children and families to other experiences within the Centre. INFORM – Information pertaining to the proposed expansion was made available on the DPPCA and City of Kitchener websites, at public meetings, stakeholder meetings and public events. This report has been posted to the City’s website with the agenda in advance of the council / committee meeting. CONSULT – Consultation included 1197 surveys, street reps, public meetings, stakeholder meetings. Priorities from the consultation included an outdoor splash-pad, multi-purpose rooms, more flexible space, more storage, a new double gym and a better lobby/entrance area. ACKNOWLEDGED BY: Michael May, Deputy CAO, Community Services 7 - 6 DOON PIONEER PARK COMMUNITY CENTRE BUSINESS CASE OUR FILE 1077F Date: February 2017 Prepared for: City of Kitchener Prepared by: MacNaughton Hermsen Britton Clarkson Planning Limited (MHBC) 540 Bingemans Centre Drive, Suite 200 Kitchener ON N2B 3X9 T: 519 576 3650 F: 519 576 0121 In cooperation with Raymond Consulting and James Fryett Architects Inc. 7 - 7 Table of Contents 1.0 INTRODUCTION .................................................................................................................................................. 3 1.1 Purpose ................................................................................................................................................................. 3 1.2 Objectives ............................................................................................................................................................. 4 1.3 Study Area & Location ...................................................................................................................................... 4 1.3.1 Environmental Context .......................................................................................................................... 5 1.4 Public Consultation ........................................................................................................................................... 6 1.4.1 Stakeholder Meetings ............................................................................................................................. 7 1.4.2 Surveys ......................................................................................................................................................... 7 1.4.3 Public Meeting ........................................................................................................................................... 8 2.0 BACKGROUND .................................................................................................................................................... 9 2.1 History .................................................................................................................................................................... 9 2.2 Community Profile & Growth Projections .............................................................................................. 10 2.2.1 Population Projections ........................................................................................................................ 10 2.2.2 Household Projections ........................................................................................................................ 11 2.2.3 2016 Demographic Snapshot ........................................................................................................... 13 2.3 Broad Based Trends in Community Services & Recreation .............................................................. 14 3.0 SUPPORTING INFORMATION ...................................................................................................................... 20 3.1 City of Kitchener Official Plan ..................................................................................................................... 20 3.2 Kitcheners Strategic Plan ............................................................................................................................ 21 3.3 Upper Canada Park Master Plan ................................................................................................................ 22 3.4 Leisure Facilities Master Plan ...................................................................................................................... 24 4.0 COMMUNITY CENTRE USAGE & NEEDS ................................................................................................... 29 4.1 Community Centre Usage ........................................................................................................................... 29 4.1.1 Programming .......................................................................................................................................... 29 4.1.2 Space .......................................................................................................................................................... 31 4.1.3 Staffing ...................................................................................................................................................... 31 4.2 Community Centre Needs ........................................................................................................................... 32 4.2.1 Core Programs and Services .............................................................................................................. 32 4.2.2 Indoor Spaces & Services .................................................................................................................... 33 4.2.3 Outdoor Services ................................................................................................................................... 35 4.2.4 Priorities .................................................................................................................................................... 35 5.0 EXPANSION OPPORTUNITIES ...................................................................................................................... 37 5.1 Objectives .......................................................................................................................................................... 37 5.2 Site Constraints ................................................................................................................................................ 37 5.3 Option One Recommended Plan ........................................................................................................... 39 5.4 Option Two Preferred Plan ....................................................................................................................... 41 5.5 Timeline .............................................................................................................................................................. 42 6.0 ECONOMIC ANALYSIS ................................................................................................................................... 43 6.1 Capital Cost of Option One ......................................................................................................................... 43 6.2 Capital Cost of Option Two ......................................................................................................................... 44 6.3 Operational Structure.................................................................................................................................... 45 6.4 Projected Revenues and Expenses ........................................................................................................... 48 7.0 CONCLUSION ................................................................................................................................................... 49 Doon Pioneer Park Community Centre Business Case 1 February 2017 7 - 8 FIGURES After page Figure 1: Doon Pioneer Park Community Association Boundary 3 Figure 2: Context Map 4 Figure 3: 2016 Doon Pioneer Park Community Population Distribution 13 Figure 4: Core Uses of the Doon Pioneer Park Community Centre 33 Figure 5: Existing Floor Plan 33 Figure 6: Indoor Space Priority for Renovation and Expansion 34 Figure 7: Site Features/Constraints 37 Figure 8: Option One Concept Plan 40 Figure 9: Option Two Concept Plan 41 Figure 10: Expansion Projected Timeline 42 Figure 11: Proposed Doon Pioneer Park Community Centre Organization Structure 46 TABLES Page Table 1: Doon Pioneer Park Community Centre History 9 Table 2: Population Projections 2016 - 2026 10 Table 3: Population Projections 2016 2036 11 Table 4: Population Projections 2016 2036 Based on Housing Growth 11 Table 5: Household Projections 2016 - 2026 11 Table 6: Household Projections 2016 - 2036 12 Table 7: Household Projections 2016 2036 Based on Planned Development 12 Table 8: List of Programs Offered during Winter, Spring & Fall Sessions (2014 2016) 30 Table 9: Summary of Doon Pioneer Park Community Centre Program Activity 31 Table 10: Community Survey Ranking Respondents Most Valuable Indoor Spaces 33 Table 11: Community Survey Ranking Respondents Most Valuable Outdoor Spaces 35 APPENDICES Appendix A: Stakeholder Questionnaire Appendix B: Online Survey Appendix C: Cost Estimate (Option One) Appendix D: Cost Estimate (Option Two) Doon Pioneer Park Community Centre Business Case 2 February 2017 7 - 9 1.0 INTRODUCTION MacNaughton Hermsen Britton Clarkson Planning Limited (MHBCŽ), Raymond Consulting and James Fryett Architect Inc. (hereinafter the Project TeamŽ) have been retained by the City of Kitchener (hereinafter the CityŽ) to undertake the development of the Doon Pioneer Park Community Centre Business Case (hereinafter the Business CaseŽ). The Business Case will provide the basis for funding, design, and construction of additional community centre space at the Doon Pioneer Park Community Centre. The City currently operates fourteen community centres. In partnership with neighbourhood associations, the Citys Community Programs and Services Division facilitates program delivery, facility management, and neighbourhood-based capacity building. Neighbourhood associations are volunteer associations that provide a range of social, recreational and educational activities for residents of a defined geographic area and are often a vehicle for community action. The Doon Pioneer Park Community Association (hereinafter the DPPCA) serves the broader neighbourhood whose boundaries are considered to be Huron Road to the north, Grand River to the east; Highway 401 and New Dundee Road to the south and Strasburg Road/Riedel Road to the west (see Figure 1). The Doon Pioneer Park Community Centre (hereinafter the DPPCCŽ) is located at 150 Pioneer Drive in the Citys south end is the only community centre south of Bleams Road. The Southwest area of Kitchener is forecast to experience significant amounts of growth over the next 20 years as several draft approved and registered subdivisions are located in the area. The subject lands are 2.75 hectares in size. The existing DPPCC building is 1,455 square metres (15,662 square feet) including the Kitchener Public Library Doon Branch (hereinafter the library). The DPPCC occupies 903 square metres (9,720 square feet) of the building. 1.1 Purpose The purpose of this Business Case is to determine the most appropriate size and configuration of the DPPCC renovation and expansion to facilitate the long-term needs of the community, staff, agencies and stakeholders and accommodate the range of activities, programs, and social events that occur there. The Business Case includes a detailed concept plan for the proposed expansion based on the needs identified by the public and stakeholders. The scope of this Business Case does not include the library as part of any renovation or expansion opportunity. Doon Pioneer Park Community Centre Business Case 3 February 2017 7 - 10 d H R s w m a y e l BK 8 i n g S t E 1 0 4 y w H d H o R m e n r oW S r t a * S t u s n i o a Hnt n B u o l v F d C B l a i r R a d r y n d a l e D r R e i d e l d R D e r a B r e l t s i d h R W e e d n u D w e N Doon Pioneer Park Community Association Boundary DATE: November 18, 2016 Figure 1 Doon Pioneer Park h t r SCALE 1 : 15,000 Doon Pioneer Park Community Centre o Community n Association FILE:1077F DRN:NZ * K:\\1077F-DOON PIONEER PARK COMMUNITY CENTRE EXPANSION\\REPORT\\FIGURE 1 - DOON PIONEER PARK COMMUNITY ASS. BOUNDARY\\PIONEER PARK COMMUNITY ASSOCIATION.DWG Doon Pioneer Park Community Centre City of Kitchener Regional Municipality of Waterloo 7 - 11 1.2 Objectives As described in the Terms of Reference prepared by the City, the Business Case will achieve the following objectives: 1.Complete a comprehensive review and analysis of the current needs and capacities (facilities, human resources, etc.) of the Doon Pioneer Park community to support community-based programming; 2.Project the potential ultimate population increase within the service area of this community centre in order to determine the facility and resource needs of the community; 3.Engage the Doon Pioneer Park community residents, as well as agency and stakeholder groups in the community, in consultation on the future programming and space needs, and consider the results of the consultation in any recommendations; 4.Identify concrete partnerships/opportunities for delivering identified and projected responses to needs with or without the City expanding current facilities; and 5.Prepare recommendations and associated capital and operating costs outlining long term (10 + years) facility expansion needs for the DPPCC considering: a.Future programming; b.Size and configuration of the facility; c.Resource constraints (e.g. budget); and d.Site constraints. 1.3 Study Area & Location The boundaries of the Doon Pioneer Park Community Association (hereinafter the subject areaŽ) are considered to be Huron Road to the north, Grand River to the east, Highway 401 and New Dundee Road to the south and Strasburg Road/Riedel Road to the west. The DPPCC is located north of Pioneer Drive, west of Homer Watson Boulevard at 150 Pioneer Drive. Uses that surround the subject lands include the following (see Figure 2): NORTH: Upper Canada Park, Schneiders Creek and low-rise single detached residential buildings. Within 1,000 metres of the subject lands, there are low-rise residential buildings, Pioneer Park Public School (located on Upper Canada Drive), low-rise commercial plazas on the southeast and southwest corners of Homer Watson Boulevard and Doon Village Road, an industrial use (Canada Alloy Castings at the northeast corner of Homer Watson Boulevard and Manitou Drive), the Grand Valley Institution for Women, and the Waterloo Regional Museum. Doon Pioneer Park Community Centre Business Case 4 February 2017 7 - 12 htron 7 - 13 EAST: Upper Canada Park, Schneiders Creek, Southwest Optimist Sports Field, Homer Watson Boulevard. Beyond Homer Watson Boulevard there is low-rise commercial, low-rise residential townhomes and medium-rise residential apartments. Within 1,000 metres of the subject lands, there are high-rise residential apartments, low- rise single detached and townhome residences and Homer Watson Park. SOUTH: City of Kitchener Fire Station #6, St. Timothy Catholic School, Beihn Park, Doon Village Natural Area, Pioneer Park Church of God, low-rise single detached and townhome residences and a low-rise commercial plaza (Pioneer Park Plaza). WEST: Low-rise single detached, semi-detached and townhome residences. Within 1,000 metres beyond Doon Village Road there are low-rise single detached and townhome residences, Wheatfield Park, Millwood Park, St. Kateri Tekakwitha Catholic Elementary School and Carlyle Park. 1.3.1 Environmental Context Within the subject area, there are several community amenities such as schools, churches, and parks that could be used by the neighbourhood to address space and program constraints at the DPPCC. This section summarizes the community amenities available within the subject area. The DPPCC is the only community centre south of Bleams Road in the City of Kitchener; therefore, it serves a large number of residents who have a variety of needs. Within the subject area, there are several schools that serve residents. School sites include: St. Timothy Catholic School Located across from the DPPCC on Bechtel Drive, St. Timothy Catholic School contains an outdoor playground, baseball diamond, and a basketball court. St. Kateri Tekakwitha Catholic School Located at 560 Pioneer Drive, St. Kateri Tekakwitha Catholic Schools contains an outdoor playground, soccer fields, and a baseball diamond. Doon Public School Located at 1401 Doon Village Road, Doon Public School caters to students in Grades 6, 7 and 8. Located at 55 Upper Canada Drive, Pioneer Park Public School serves Pioneer Park Public School children up to Grade 6. The school features a gymnasium, creative playground, two soccer fields, baseball diamond, basketball net and asphalt activities. Brigadoon Public School Located at 415 Caryndale Drive, Brigadoon Public School serves children up to Grade 6. The School features a double gymnasium. JW Gerth Public School Located at 171 Apple Ridge Drive, JW Gerth Public School serves children from JK to Grade 4 and features a large double gymnasium with a folding wall and a large outdoor play area for children. Doon Pioneer Park Community Centre Business Case 5 February 2017 7 - 14 Within the subject area, there are several churches that serve residents. The Pathway Community Church offers services at the DPPCC. Additional churches in the area include: Pioneer Park Church of God Located at 11 Old Carriage Drive, the Pioneer Park Church of God is located 290 metres from the DPPCC. Forward Church Located at 600 Doon Village Road, Forward Church is located approximately 1.1 kilometers from the DPPCC. Doon Presbyterian Church Located at 35 Roos Street, the Doon Presbyterian Church is located approximately 2 kilometers from the DPPCC. Located at 68 Biehn Drive, the Pioneer Park Pioneer Park Christian Fellowship Mennonite Church Christian Fellowship Mennonite Church is located approximately 2.1 kilometers from the DPPCC. Located at 40 Chapel Hill Drive, the Carmel New Church School is Carmel New Church School located approximately 3.1 kilometers from the DPPCC. There are fourteen (14) community centres located throughout the City of Kitchener. The majority (9 of 14) of the Citys community centres are located north of Highway 8. Of the five community centres located south of Highway 8, the DPPCC is the only facility located south of Bleams Road. The closest community centres to the DPPCC are (note: the distances cited are actual driving distances): Country Hills Community Centre (Strasburg Road/Block Line Road) located approximately 6 kilometers from the DPPCC, it features a double gymnasium, an outdoor sports pad, accessible playground and three meeting rooms; Kingsdale Community Centre (72 Wilson Avenue) located approximately 5.4 kilometers from the DPPCC, it features a 16,500 square foot facility with five program rooms, a large gymnasium and an adjoining commercial kitchen and bar area. Programs and activities can be accommodated in each room; Centreville Chicopee Community Centre (141 Morgan Avenue) Located approximately 6 kilometers from the DPPCC, it features a single gymnasium and two meeting rooms to accommodate programs and activities. Williamsburg Community Centre (Westmount Road East/Fischer Hallman Road) located approximately 7 kilometers from the DPPCC, it features a multipurpose room for programs and activities. 1.4 Public Consultation As described in the study objectives, one of the objectives was to engage residents within the subject area, agencies and stakeholders through the consultation process to understand their needs and desires for the future expansion of the DPPCC. As such, a variety of consultation methods were used to engage the public including facilitated stakeholder meetings, handout and online surveys and a public meeting. Doon Pioneer Park Community Centre Business Case 6 February 2017 7 - 15 1.4.1 Stakeholder Meetings Stakeholder Meetings were scheduled through June and July 2016 with various groups that have a direct interest in the expansion of the DPPCC: 1.June 9, 2016: Meeting with DPPCC Staff; 2.June 16, 2016: Meeting with the Doon Pioneer Park Community Association Board; 3.June 23, 2016: Meeting with City of Kitchener Staff; and 4.July 27, 2016: Workshop with Neighbourhood Youth Drop-in session. The format for most stakeholder meetings was similar. A total of approximately 40 people attended the stakeholder sessions. The stakeholder meetings were intended to obtain feedback on the DPPCCs strengths, weaknesses, opportunities and threats and understand the stakeholders opinions regarding the future of the DPPCC and potential expansion. The meetings included a brief presentation by the Project Team to provide an overview for the Business Case and lead stakeholders through a facilitated discussion. A questionnaire was provided to all stakeholders (Appendix A), which helped lead the discussion. Visual display boards were used and stakeholders were asked to use sticky-notes to label the positives and negatives of the exterior and interior space of the DPPCC. At each facilitated session, the stakeholders responses were recorded and summarized. An additional meeting was held with the Pathway Community Church who uses the DPPCC for their Sunday services. The purpose of this meeting was to understand the congregations needs and future growth plans. 1.4.2 Surveys A survey was also conducted targeting all residents within the subject area as well as users of the DPPCC. The survey was administered online and through paper surveys. Paper surveys were distributed at the DPPCC and at the Fall Family Fun Day event on September 17, 2016. The electronic survey was distributed online by the City through their website and social media accounts. A copy of the survey is attached in Appendix B. In total 1,197 surveys were completed between August and October 5, 2016. Approximately 85% (n=1,009) respondents to the survey live in the Doon or Pioneer Park communities. Of those respondents who live in the Doon or Pioneer Park communities, over 75% (n=772) of people moved to the community in the past 15 years. Much of the residential development within subject area is relatively new and is rapidly expanding as further demonstrated in Section 2.2. The surveys provide some insight into the typical household within the study area. There were 707 responses to the question how many people live in your household? while 490 skipped the question. Despite this, the mode (the value that occurs the most often) is a household of four people (n=234). This area is known to be home to many families and the survey data supports this claim. Over 70% of respondents (n=512) stated that there are between three and five people in their household. Questions were asked regarding the number of adults and children (0 to 17 years of age) that live in the respondents household. The survey data supports the claim that a family of four is a typical household in Doon Pioneer Park Community Centre Business Case 7 February 2017 7 - 16 the subject area. Most households contain two adults (72%; n=508) and the most frequent number of children per household is two (36%; n=234). Over 50% (n=274) of children within the study area are between the ages of 5 and 10. Of those respondents who confirmed they are users of the DPPCC, approximately 75% (n=880) of respondents use the DPPCC at least monthly while approximately 25% (n=295) of respondents never use the DPPCC. Of those who never participate in activities at the DPPCC, over 50% (n=151) stated their reason they never participate is because they do not know what is being offeredŽ at the DPPCC. The results of the survey are further analyzed in Section 4.2. 1.4.3 Public Meeting A public meeting was held on November 9, 2016, at the Doon Pioneer Park Community Centre. The purpose of the meeting was to provide a summary of the public and stakeholder engagement efforts; identify trends and themes from the survey; provide an overview of the expansion recommendations, and receive public input on the proposed concept plan. The public meeting included a presentation by the project team as well as an opportunity for the public to ask questions. Display boards were also located in the lobby area and the public were encouraged to discuss the concept plan with the project team. Approximately 12 people attended the meeting. Doon Pioneer Park Community Centre Business Case 8 February 2017 7 - 17 2.0 BACKGROUND 2.1 History The Doon Pioneer Park Community Association and local community recognized a need for a Community Centre in the south end of the City and made a formal request to Council for consideration in 1983. Funding for the project was approved by Council in the Capital Budget for 1987. In addition to the funding approved by Council, the Doon Pioneer Park Community Association raised $25,000 to put towards the design and construction of the community centre. Ground breaking ceremonies were held in June 1988 and the DPPCC was officially opened on September 9, 1989. At that time, there were approximately 7,200 residents living in the area. The current building contains the Community Centre and the Pioneer Park Branch of the Kitchener Public Library. An expansion of the Community Centre was first discussed in 1999. In 2000, the City commissioned a Community Centre Feasibility Study. The Community Centre Feasibility Study identified the need for an expansion to the DPPCC and recommended that the City proceed with the proposed addition because of the major growth and development in the area since the original building was constructed. Since then, the expansion project has been deferred five times. The current 2015 City Capital Budget has the proposed expansion scheduled for 2017. The current City of Kitchener Development Charges Study (2014) also identifies a capital allocation for the expansion of the DPPCC in 2017 2018, which would allow for the facility to be open sometime in 2019, depending on the competitive construction market. Approximately 83% ($3,070,800) of the total project cost would be funded through Development Charges as the proposed expansion is intended to serve new growth. Table 1 summarizes the history of the DPPCC and proposed expansion considerations. Table 1: Doon Pioneer Park Community Centre History Year Activity 1988 Construction begins 1989 Official opening ceremonies of the DPPCC 1999 Expansion of the Doon Pioneer Park Community Centre is first discussed and scheduled for 2007 2000 Community Centre Feasibility Study recommends the City proceed with the proposed addition to the Doon Pioneer Park Community Centre and push back construction to 2008. 2005 Leisure Facilities Master Plan recommends an expansion of the Doon Pioneer Park Community Centre for 2008. 2008 The City of Kitchener earmarked funds to prepare the Business Case for expansion, which was scheduled for 2009 2009 The Business Case for expansion was pushed back until 2010 and expansion plans were pushed back until 2012 Doon Pioneer Park Community Centre Business Case 9 February 2017 7 - 18 2011 Expansion plans for the Doon Pioneer Park Community Centre are deferred until 2016 2013 Leisure Facilities Master Plan Update recommends that the planned community centre additions for Doon Pioneer Park Community Centre be implemented. 2015 Expansion plans for the Doon Pioneer Park Community Centre are deferred until 2017. Source: Doon Pioneer Park Community Association History 2.2 Community Profile & Growth Projections In developing the Business Case for the DPPCC expansion, it is important to understand the demographic composition of the community. The demographic composition of the community influences the needs and wants of the community in any expansion. This section identifies the current community profile, including population and socio-economic considerations, as well as identifying a projected population for the community. The data contained in this section were provided by the City of Kitchener and obtained from PCensus, which relies on Statistics Canada data. Note: the population data only accounts for permanent population; therefore, it does not include students. Actual population may be larger when accounting for students. 2.2.1 Population Projections The data provided by the City of Kitchener projects a 2026 population of 23,825 persons for the subject area. Table 2 shows the projected population from 2016 to 2026 and the annual rate of change in population during this time period. Table 2: Population Projections 2016 2026 Year Projected Population Rate of Change in Population (percent per year) 2016 20,028 1.8% 2019 21,125 2021 21,857 1.7% 2026 23,825 1.8% Source: PCensus 2016 Estimates and Projections Population Trends. For the purposes of this Business Case, population projections are required to 2036 to provide a 20-year planning horizon for the subject area. It is assumed that the average rate of change in population is 1.77% per year throughout the planning horizon. Using these assumptions, the population of the subject area is projected to increase by 8,366 persons from 2016 to 2036 to 28,394. Table 3 shows the projected population of the subject area over the 20-year planning horizon. Doon Pioneer Park Community Centre Business Case 10 February 2017 7 - 19 Table 3: Population Projections 2016 2036 Year Projected Population 2016 20,028 2021 21,857 2026 23,825 2031 26,009 2036 28,394 Note: Assumes an average annual rate of change of 1.77%. To provide an alternative methodology to projecting population, Section 2.2.2 gives consideration to the planned, registered and remaining residential units within the subject area. With the projected number of households, populations can be projected based on the assumption that the current average household size remains constant. At present, the average household size is 2.8 persons per household. Table 4 shows the projected population based on this alternative methodology. Note, average household sizes across the Province are trending downward and this same trend would be expected in the subject area. However, for the purposes of this analysis household size has remained constant through the planning horizon. Table 4: Population Projections 2016 2036 Based on Housing Growth Year Projected Population 2016 20,028 2021 22,714 2026 25,514 2031 28,314 2036 31,114 Notes: Based on household projections in Table 6. Assumes an average household size of 2.8 persons remains constant over the planning horizon. The alternative methodology projects a population of 31,114 people by 2036. Together, these methodologies provide a projected range in population of 28,394 to 31,114 people within the subject area. This range is reasonable because typically residential blocks on a plan of subdivision are approved with a range of units to accommodate market conditions at the time of construction. 2.2.2 Household Projections The data provided by the City of Kitchener projects a total of 8,690 households within the study area by 2026. Table 5 shows the projected number of households and the annual rate of change in households (percent per year) over this time period. Table 5: Household Projections 2016 2026 Year Projected Households Rate of Change in Households (percent per year) 2016 7,112 2.2% 2019 7,574 2021 7,883 2.0% 2026 8,690 1.9% Source: PCensus 2016 Estimates and Projections Household Trends. Doon Pioneer Park Community Centre Business Case 11 February 2017 7 - 20 As described above the planning horizon for this Business case is 20-years (2036), therefore, household projections must be extended to meet the timing horizon. From the data provided by the City of Kitchener, the projected average annual rate of change in households is 2.03% per year from 2016 to 2026. Using this assumption, the subject area is projected to grow by 3,512 households by 2036 to a total of 10,624 dwelling units. Table 6 shows the projected number of households from 2016 to 2036. Table 6: Household Projections 2016 2036 Year Projected Households 2016 7,112 2021 7,883 2026 8,690 2031 9,609 2036 10,624 Note: Assumes constant average annual rate of change in households of 2.03% To provide an alternative methodology, consideration has been given to the planned, registered and remaining housing units within the subject area. Much of the Citys vacant developable land is located within the southern part of the subject area. Several properties are under construction or are planned for development. Applications for plans of subdivision, draft approved plans of subdivision and registered plans of subdivision provide detailed unit counts of the number of households planned for the subject area. As of the start of 2016, there is the potential for an additional 3,772 to 5,144 units within the subject area. Assuming a construction rate of approximately 200 units per year, the subject area will take 19 to 26 years to achieve full build-out. By 2036, a total of 11,112 dwellings are projected based on a build-out rate of 200 units per year. Table 7 shows the projected number of households over the planning horizon. Table 7: Household Projections 2016 2036 Based on Planned Development Year Projected Households 2016 7,112 2021 8,112 2026 9,112 2031 10,112 2036 11,112 Note: Data based on planned, registered and vacant residential units within subject area based on data obtained by MHBC Planning. Therefore, two methodologies have been used to project the number of dwellings over the 20-year planning horizon to 2036. In total, a range of 10,624 to 11,112 households are projected within the subject area by 2036. This represents an increase of 3,512 to 4,000 new dwellings over the 20-year planning horizon. This provides a good range between the two household projections to be used for planning purposes. Doon Pioneer Park Community Centre Business Case 12 February 2017 7 - 21 2.2.3 2016 Demographic Snapshot Population & Households In 1989 when the DPPCC was officially opened, there were approximately 7,200 residents living in the subject area. In 2016, the population has grown to 20,028 people. The current population represents a 9.7% increase over the 2011 Census population. Figure 3 shows the current population distribution by age cohort and gender in the subject area. Figure 3: 2016 Doon Pioneer Park Community Population Distribution. 3500 3000 2500 Total 2000 Male 1500 1000 Female 500 0 0 to 45 to 1415 to 2425 to 3435 to 4445 to 5455 to 6465 to 7475+ Source: PCensus 2016 Estimates and Projections Population by Age and Sex There are currently 7,112 households in the subject area. The number of households has increased 10.8% from 2011. On average, there are 2.8 persons per household within the subject area. A majority of the population over 15 years of age is married (9,105 persons). There are 4,270 single (never married) persons within the subject area. There are currently 5,989 families living in the subject area. The average family consists of three persons and has an average of 1.1 children. Of the 5,989 families, the majority (3,135 families) have children at home. There are 799 lone-parent families living in the subject area. What does this mean? The subject area is continuing to experience population growth as southwest Kitchener develops. Over the planning horizon, the population and number of households are projected to continue to increase. The population distribution is well distributed across all age cohorts. Therefore, there is a segment of the population that is aging and will require accessible spaces and programming to keep them active (physically and mentally). There are also a large number of families living within the subject area. Similar to the aging population, families have unique needs as well when it comes to the community centre including recreation and educational opportunities, child care and social spaces. Education People with a variety of different levels of education reside in the subject area. In general, 31% (3,530 persons) have a college, CEGEP or other non-university certificate or diploma, 23% (2,645 persons) have a high school diploma or equivalent and 21% (2,365 persons) have a Bachelors degree. These figures are similar to provincial and national rates. What does this mean? The level of education one achieves can influence the likelihood of engaging in healthy physical and recreational activities. As the level of education one achieves increases, so does the Doon Pioneer Park Community Centre Business Case 13 February 2017 7 - 22 probability that participation in physical recreational activities will increase. Given the educational data, it can be inferred that residents within the study area actively participate in physical and recreational pursuits, and this trend will likely continue. Income The average household income is $115,973 and the median household income is $93,658, which are above the provincial and national rates. What does this mean? Research indicates that there is a correlation between income and participation in recreational activities whereby participation in recreation activities is often higher among higher income families. Based on the demographic snapshot, the average and median household incomes in the study area is higher than the Canadian and Ontario average. Households within the study area experience a range of incomes and as such programs and activities need to be affordable and inclusive for all. Language What does this mean? English as the first language is very prominent in this neighbourhood as 90% list English as their home language (excluding multiple responses). Other languages that are spoken as a home language include Polish, Punjabi, Spanish, Romanian, Mandarin, Persian (Farsi), Chinese languages and Slavic languages (each representing 1% of home languages). What does this mean? Ethnicity can influence the community services provided by the City. The diversity of ethnic groups in the community can lead to a greater demand for recreation pursuits that these ethnic groups enjoy. For example, there may be a greater demand on facilities such as cricket, bocce, or other culturally specific programs in order to serve the diverse community needs. 2.3 Broad Based Trends in Community Services & Recreation The community leisure system is made up of three integrated sub-systems: 1.Commercial providers; 2.Not-for-profit organizations; and 3.The public system The public system is the principle driver in the community for leisure programs and services as it provides services directly, as well as exercises varying levels of control over the ability of commercial or not-for- profits to offer services within its jurisdiction. It is important that the structure of the public delivery system reflect the values and cultural demands of the community whose needs it is established to meet. As such, the City of Kitchener has a significant role to play in the delivery of parks, recreation and culture services. However, it is equally clear that the City cannot, and should not, play a role in all areas. Municipal recreation departments are typically involved in providing community facilities (e.g. parks, playgrounds, community centres, arenas, trails, swimming pools), offering community programs (e.g. learn-to-swim, childrens day camps, sports leagues and arts programs), providing leadership and support to local clubs and organizations, and regulating leisure opportunities through local by-laws. Regardless of the size of the municipal recreation organization, volunteers are also an integral part of the delivery of service. Doon Pioneer Park Community Centre Business Case 14 February 2017 7 - 23 In Canadian municipalities in recent years, leisure service delivery has been guided by certain societal influences (e.g. active living, health, and fitness, community pride) and, at the same time, has responded to public demand for programs and services that are justified by the willingness of the community to pay for them. Effective planning for DPPCC current and future residents requires the identification and constant monitoring of existing and emerging trends that could potentially affect facility and program needs. Understanding trends related to demographics, participation, and facility provision can help the City and Neighbourhood Association anticipate shifts in the demand for recreation and parks opportunities. The following is a high-level summary of major trends in participation, demand and the delivery of recreation and parks facilities and services, based largely on information collected from recent provincial and international research. Societal Trends Impacting Parks & Recreation High levels of physical inactivity in all age groups less than half of Canadian children are active enough to achieve optimal growth and development; physical inactivity costs Canadians $1.6 billion and $3.7 billion annually in direct and indirect costs. Health and obesity are becoming a national crisis the proportion of obese children has increased threefold in the past 25 years. Todays children will be the first generation with a life expectancy shorter than their parents. Aging population (baby boomers are reaching retirement age) there is significant segmentation amongst older adults and seniors, with demands ranging from active recreation activities to more traditional and passive activities. Increasing ethnic diversity more than half of Ontarios population growth between 1996 and 2006 can be attributed to immigration. Heightened awareness of the need to accommodate people with disabilities (not just through facility design, but also programming, customer service, signage, etc.), particularly given the regulations for the Accessibility for Ontarians with Disabilities Act (AODA). Busy lifestyles and the lack of free time commuting, home-based occupations, night shifts, and weekend work are creating the need to have leisure services open later and the need to promote drop-in opportunities. Income disparities and continued need for affordable leisure opportunities older adults have more disposable income to spend on leisure pursuits, while young families, youth and economically disadvantaged individuals may find it difficult to afford to pursue a healthy lifestyle through participation in recreation; this may result in a need for more subsidies to assist those that are on fixed incomes and also a movement away from age-based subsidies for those that can afford to pay for services. Fewer volunteers are doing more work the sport and recreation sector is traditionally very reliant on volunteers and requires constant recruitment, training and recognition. Doon Pioneer Park Community Centre Business Case 15 February 2017 7 - 24 Increasing expectations of residents in terms of both quantity and quality of opportunities. Design Trends Impacting Parks & Recreation Existing recreational infrastructure is aging, creating customer service and funding challenges the majority of recreation facilities in Ontario are over 25 years old and 30% to 50% of these are near the end of their useful life. National trends show a general preference for multi-use community facilities over single-use facilities as many users prefer a choice of amenities/services/activities in one location. At the same time, the demand for neighbourhood-level facilities (e.g. gathering/programming spaces, playgrounds, and accessible pathways and trails) remains important to communities. Increased emphasis on resource sharing, such as partnerships and other collaborative arrangements. GreenŽ construction and facility retrofitting (many municipalities are adopting minimum LEED requirements), which can result in increased capital costs, but lower operating costs in the long- run. Urban design trends emphasize the importance of plentiful greenspace and parks within individual neighbourhoods. Walkability and urban design that is conducive to alternative modes of transportation are gaining popularity as well. Growth in passive recreational use of pathway and trails lead to demand for amenities (e.g. drinking fountains, washrooms, outdoor exercise equipment, benches, etc.). Volunteerism The evolving nature of volunteerism is important for recreation service providers to understand, given the importance of volunteers in the delivery of community programs and events. Canadians seek different volunteer experiences throughout their lifespans, depending on circumstances and priorities, but this is not the only factor at play in the changing demographics of Canadas volunteers. Contrary to popular belief rates of volunteerism are on the rise nationally, however, there is no dramatic increase or decrease in numbers of volunteers. We are experiencing a whole new group of volunteers who want to use their skills, work in an episodic way and not make a multi-year commitment. Latest Statistics Canada data (2010) shows that more than 47% of Canadians volunteer an average 156 hours each day. Many Canadians volunteer out of a desire to contribute to their communities, to use their skills and experience, and because they have been personally affected by the cause. It is clear that the majority of volunteer hours are provided by the minority of volunteers. This is also true within the realm of sports and recreation. Seventy-nine (79%) of total volunteer hours contributed to sports and recreation organizations came from 25% of volunteers. Volunteerism is a critical part of the social environment in communities. Volunteers need to be valued, trained and supported as an essential part of the delivery of recreational and social experiences in every community in Canada. Doon Pioneer Park Community Centre Business Case 16 February 2017 7 - 25 Social Inclusion Research has demonstrated that recreation and leisure can foster social inclusion for residents facing social, financial, physical or mental health barriers. While always an important issue, its significance has risen as communities have become more diverse. Social inclusion is about making sure that all children and adults are able to participate as valued, respected and contributing members of society. It involves the basic notions of belonging, acceptance and recognition. For immigrants, social inclusion would be manifested in full and equal participation in all facets of a community including economic, social, cultural, and political realms. It goes beyond including outsidersŽ or newcomersŽ. In fact, social inclusion is about the elimination of the boundaries or barriers between usŽ and themŽ. There is a recognition that diversity has worth unto itself and is not something that must be overcome. While issues of social inclusion are pertinent for all members of a community, they can be particularly relevant for adolescents of immigrant families. Immigrant youth can feel pulled in opposite directions between their own cultural values and a desire to fit inŽ to their new home. This tension can be exacerbated in those situations in which parents are experiencing stress due to settlement. Children living in families which are struggling are more likely to be excluded from some of the aspects of life essential to their healthy development. Children are less likely to have positive experiences at school, less likely to participate in recreation and less likely to get along well with friends, if they live in families struggling with parental depression, family dysfunction or violence. Increasingly, municipalities and other recreation providers are putting a focus on providing recreational opportunities for individuals with barriers to participation. Support for initiatives such as the Canadian Parks and Recreation Associations Everybody Gets to PlayŽ program, KidSport and JumpStart can help ensure that youth have access to programs and activities that can foster social inclusion and overall physical and mental health. Outreach programs, partnerships with social service providers and subsidized user fees are also potential mechanisms being used by providers to remove barriers. The City of Kitcheners existing Leisure Access Card is one example of a municipal operated initiative, which provides low-income families with subsidized access to programs and passes. Community Centres play a vital role and are critically aligned to develop social initiatives that enhance the well-being of individuals, families, and communities, and ultimately fostering increased social inclusion in the community. Connectivity and outreach through the DPPCC social and recreation programming will be a vehicle to engage marginalized and vulnerable populations in the neighbourhood. Doon Pioneer Park Community Centre Business Case 17 February 2017 7 - 26 Multi-Generational and Flexible Facility Use Research has shown that Canadians leisure time is increasingly important for personal development and quality of life. This equates to increased demand for high-quality activities and facilities, and value-added service that can come from providing the ability to recreate at any time throughout the day or providing the availability to have simultaneous recreation opportunities for the entire family. This requires multi-use spaces that appeal to a broader spectrum of uses rather than dedicated spaces. In addition, as peoples schedules become increasingly busy, there is greater demand for informal and individual leisure activities such as walking or cycling, rather than programs with set schedules. There will be greater demands on drop-in opportunities in recreation and cultural facilities. As a result, scheduling of programs will need to ensure that these are available throughout the day. A growing trend in the development or re-purposing of recreation, leisure and cultural infrastructure involves providing amenities that appeal to a variety of individual interests and ability levels. Including a variety of amenities in facilities can help maximize facility usage and ensure that a facility is viewed as being relevant by all residents. While traditional facility recreation components such as gymnasiums, fitness centres and aquatic areas continue to be important, many facilities are now including components with amenities that have previously been stand-alone in the community or not identified with recreation facilities. Examples include seniors centers, youth centres, indoor child play areas and libraries. Including these amenities can also help recreation facilities become community hubsŽ of activity and further justify municipal investment. A recent trend in recreation and cultural infrastructure is to create facilities which are highly social in nature, and that can act as social gathering hubsŽ within a neighbourhood or broader community. In active spaces such as fitness centres, walking/running tracks, and gymnasiums, social interaction can be encouraged through the layout and design of these and adjacent supporting amenities (e.g. change rooms, stretching areas, information desks). Increasingly, many facilities are also focusing on increasing social interaction opportunities in passive spaces such as lobbys, corridors, spectator areas, and food service locations. This is often accomplished through a combination of facility design, facility aesthetics, and by creating a warm and welcoming atmosphere. By increasing social interaction in passive areas, many facilities have been successful in attracting individuals and groups who might not typically visit recreation or cultural facilities. Another growing trend is to include program areas within multi-purpose facilities that focus on providing socially interactive opportunities to specific populations. Whereas past child minding centres, youth centres, adult social clubs, and seniors centres were often stand-alone facilities; many municipalities are now including these spaces as components of multi-purpose recreation and cultural facilities. Based on this demand, there is a clear shift from stand alone to multi-use facilities. This also includes a shift from separate youth to seniors centres as these are now more commonly integrated into multi-generational facilities. Combining facilities such as multi-purpose gymnasiums, multi-functional activity rooms, childrens spaces that facilitate staffing efficiency, and results in improved and greater facility use by families. Combined facilities also become a gathering place and focal point/destination for the community. Doon Pioneer Park Community Centre Business Case 18 February 2017 7 - 27 The planned Upper Canada Park/Sportsfield Complex is poised to provide opportunities for a range of ages, family types, and abilities and its location relative to the DPPCC is viewed as space that can encourage inclusive recreational activity. There has been a considerable trend towards participation in non-programmed, spontaneous outdoor activities such as pick-up sports, picknicking, family gatherings, special events, etc. In this sense, parks can be viewed as outdoor community centresŽ that combine a number of programmed and non-programmed uses. The construction of the proposed bridge and trailway between the Upper Canada Park and DPPCC will enhance opportunities for community connectivity, engagement and cross-programming with the DPPCC from an indoor/outdoor perspective. There is a growing trend in clustering library spaces with like-minded recreational program spaces such as: child-minding, seniors and social interactive spaces. The librarys goals overlap with parks, recreation and culture services and there is a growing trend in more collaborative approaches to a variety of programs and services that respond to community needs. Flexible, smart, green and spacious are the four primary themes to be found in contemporary library architecture. Libraries are designing spaces that can be more easily reconfigured according to changing needs that use technology to maximize the quality and cost-efficiencies of library service, and which increase efficiency and sustainability through environmentally sound design. Exciting new designs and colour schemes are being explored, resulting in more people space and less collection space. Outdoor spaces and community living rooms also feature prominently in new and renovated library buildings as libraries position themselves as community hubs and crucial public spaces. Spaces for Spontaneous & Scheduled Activities While scheduled (structured) activities remain important, there is growing demand for opportunities to participate in spontaneous (unstructured) activities. People are seeking individualized, informal pursuits that can be done alone or in small groups, at flexible times, often near or at home. Examples of spontaneous activities include fitness/wellness, leisure swimming, walking and open gymnasium time. Also trending are the concepts of Small and SimpleŽ: small groups, mini-soccer, short, intense exercises, and shortened seasons. Agencies are finding it easier to integrate these trends into their programs because they require little investment in space and equipment. Low-skill, low-cost, social leisure sports like Baggo (a bean-bag toss game), ladder toss, and nostalgia sports like kickball, dodgeball and hula hoops are an increasing trend. These games are more lighthearted and less athletic and fit easily into time spent after work. These low-pressure recreational leagues also draw members of the community who lack the athletic prowess for the more competitive basketball, softball, volleyball, or tennis leagues. These additional participants and leagues help to raise more revenue for recreation operations often with little cost for equipment. Fitness trends also reflect a blast from the pastŽ. Body-weight training leads the list of the top 10 fitness trends according to the American College of Sports Medicine (ACSM). Body Weight Training includes pushups, pull-ups, planks, lunges, and squats, to name a few. This style of exercise utilizes minimal equipment making it more affordable and allows people to get back to the basics. Doon Pioneer Park Community Centre Business Case 19 February 2017 7 - 28 3.0 SUPPORTING INFORMATION 3.1 City of Kitchener Official Plan An Official Plan is the primary long-range, comprehensive municipal planning document that outlines a framework for land use decision-making for the City of Kitchener. The City of Kitchener Council adopted the New City of Kitchener Official Plan on June 30, 2014, which was subsequently approved by the Region of Waterloo on November 19, 2014, but appealed to the Ontario Municipal Board. Although the New Official Plan has been appealed, the vision, goals, and policies are still relevant for this project. The vision for the City of Kitchener is: Together we will build an innovative, vibrant, attractive, safe, complete and healthy community contributing to an exceptional quality of life.Ž Section 8 of the Official Plan addresses the objectives and policies for parks, open space, urban forests and community facilities. The Official Plan recognizes that the provision of community infrastructure and facilities is essential for the enhancement of the quality of life for residents in Kitchener. There are a wide range of facilities that are required to meet the physical, social, cultural and recreational needs of its residents. The City also recognizes the importance of parks, open space, multi-use pathways and trails as key elements in providing residents with a healthy physical environment and high quality of life. The Official Plan identifies the following objectives: 8.1.1. To provide and maintain a balanced distribution and sufficient supply of accessible and inclusive parks, open space and community facilities for both active and passive recreational uses to satisfy the needs of all residents of Kitchener. 8.1.2 To ensure that the city has sufficient community infrastructure and facilities to meet the current and projected needs of all its population. 8.1.3 To ensure that community infrastructure uses and facilities are appropriately and conveniently located throughout our city to support a complete community. 8.1.4 To enhance access to parkland and open space in the Citys Planning Communities that are underserviced. 8.1.5 To provide for a continuous public open space system, which includes the diverse natural areas of the Grand River and its major tributaries, supporting diverse recreational pursuits, environmental sustainability, active transportation and a high-quality public realm and urban landscape. Doon Pioneer Park Community Centre Business Case 20 February 2017 7 - 29 8.1.6 To promote the use of open space as a buffer between incompatible land uses. 8.1.7 To provide parks and community facilities in an efficient and sustainable manner that optimizes their use, minimizes environmental impacts, supports intensification and promotes flexibility to adapt to changing needs. To implement the objectives of the Official Plan, there are several policies regarding community infrastructure and facilities, including but not limited to: 8.C.1.3 The City will support and facilitate the provision of an appropriate mix and range of community infrastructure in our community to meet the needs of our residents resulting from population changes and to foster a complete community. 8.C.1.4 The City will consider the projected needs of the population and the provision of community infrastructure in planning for growth and in the formulation of Kitcheners Growth Management Program in accordance with Section 17.E.5. 8.C.1.5 The City will encourage the optimization of existing community infrastructure uses and opportunities for adaptive re-use, wherever feasible, before consideration is given to developing new community infrastructure uses. 8.C.1.6 The City will encourage the strategic and co-location of community infrastructure uses: a) to promote cost-effectiveness; b) to facilitate service integration, access to transit and active transportation; and c) to support the effective and efficient delivery of emergency management services. 8.C.1.7 The City will provide a balance of a public parks and leisure services system that provides opportunities for physical recreation, socialization, cultural pursuits, community identification, active transportation, nature appreciation and education. 8.C.1.8 The City will endeavor to expand the supply of parkland, community facilities and recreation services through facilitation, partnership arrangements and direct provision. Emphasis will be placed on maximizing the use of existing facilities and services, as well as joint ventures and facility sharing with other institutions and community groups. 3.2 Kitcheners Strategic Plan Council for the City of Kitchener approved a four-year strategic plan (2015-2018) on August 24, 2015, which is based on five strategic priorities: 1.Open government 2.Strong and resilient economy 3.Safe and thriving neighbourhoods 4.Sustainable environment and infrastructure 5.Effective and efficient city services Doon Pioneer Park Community Centre Business Case 21 February 2017 7 - 30 The Strategic Plan was the result of extensive community consultation. The intent of the Strategic Plan is that it clearly articulates the priorities and strategies that will have a positive impact on the quality of life for those who live, work and play in Kitchener today and in years to come. Within the Safe and Thriving Neighbourhoods priority, the City has identified the following goals: 3.5 Continue to encourage active participation in existing recreational facilities while moving forward with the provision of new recreational opportunities in underserved areas of the city. 3.6 Provide opportunities and support for citizens to lead the way in creative active and vibrant public places that promote peoples health, happiness and well-being by capitalizing on local community assets such as community centres, pools, arenas, libraries, parks, trails and other public spaces.Ž The City also identifies specific action items to implement the above goals including: Proceed with expansions to the Doon Pioneer Park and Mill Courtland Community Centres. The Strategic Plan for the City is clear that the DPPCC expansion is a City priority and the expansion will help achieve the Citys strategic goals. 3.3 Upper Canada Park Master Plan The City of Kitchener developed the Upper Canada Park Master Plan in 2015 to develop a holistic park design and recommended improvements to Upper Canada Park. The Master Plan report and concept were approved by the Infrastructure and Community Services Committee on September 21, 2015. Upper Canada Park is considered one of the Citys District Parks and is the second largest at 18.7 hectares. Doon Pioneer Park Community Centre is part of Upper Canda Park, which also includes Southwest Optimist Sportsfields, a natural area and a neighbourhood park. The Upper Canada Park Master Plan recognized that the DPPCC expansion and other improvements should be coordinated closely to avoid duplication of services and consolidate outdoor recreational amenities. Upper Canada Park that exists today has remained relatively unchanged since its original design and construction from 1986 to 1989. The site consists of a variety of features including: Five baseball diamonds - developed between 1985 and 1987. The fields vary in both size and condition and infrastructure consists of stone dust surfacing, outfield grass, metal backstop fencing, outfield fencing, players benches and portable bleacher seating. Playgrounds one located at the Southwest Optimist sportsfields, the playground was installed in 2006 and features a 430 square metre wood fibre mulch surfaced childrens play area. A second playground is located at the neighbourhood park and consists of two components: the first is a small wood play structure installed in the mid-1980s and the second is a single bay swingset installed in 2001. Splash pad (unfunctional) consists of a circular concrete pad located near the park entrance at Pioneer Drive and features a 6x6 wood splash post with 4 water spouts along the surface of the post. Shade structure an 80 square metre structure installed in 1992. Doon Pioneer Park Community Centre Business Case 22 February 2017 7 - 31 Southwest Optimist Clubhouse a 27 year old portable containing a small office room, meeting room and washrooms (not for public use). Maintenance compound located along the primary pedestrian entrance of Southwest Optimist Sportsfield. At present, the DPPCC is connected to the other components of Upper Canada Park by sidewalks along Pioneer Drive and Upper Canada Drive. There are no direct internal connections. The Upper Canada Park Master Plan recommended the following goals: Upgrade existing aging recreational infrastructure; Improve efficiency of park space use; Provide pedestrian connections between recreational amenities and community facilities; Address changing community needs for park space and associated amenities; Provide a suitable and long-term location for a proposed skatepark facility; Accommodate for current and future baseball user group needs for sportsfield inventory. The Master Plan prioritized the following works: Priority 1: Sportsfields and Supporting Infrastructure Realignment of sportsfields and related infrastructure improvements (lighting, irrigation, etc); Parking lot improvements; Pedestrian pathways around/between fields; Maintenance compound. Priority 2A & B: Park Amenities: A.Skatepark, basketball courts, playground improvements, pedestrian pathways, multi-use pathway improvements; B.Washroom facility, final parking lot upgrades. Priority 3: Future Improvements Pedestrian bridge to community centre, splashpad (if a splashpad cannot be accommodated at the DPPCC). The Upper Canada Park implementation plan will be brought to Council February 13, 2017, with anticipated construction scheduled for late summer 2017 and 2018 and opening for the 2019 playing season. Doon Pioneer Park Community Centre Business Case 23 February 2017 7 - 32 3.4 Leisure Facilities Master Plan In 2005, the City of Kitchener prepared the Leisure Facilities Master Plan (LFMP) that focused on a 15-year time horizon in establishing the Citys leisure service delivery priorities. In the Spring of 2013, the City launched the Leisure Facilities Master Plan Update as the basis to review the strategic inputs, trends, and perspectives on leisure service needs as well as identify leisure service programs, facilities and delivery approaches for the next 5 to 10 years. The following excerpts speak to the City of Kitcheners facility values and directly aligns with the role and importance of the Community Centre model. 2.1 Leisure Facilities and Services Identified as Valued/Important The citys community centres and neighbourhood associations are valued for their associated positive neighbourhood development, program access affordability, community engagement, and volunteerism; The community trails, parks and open spaces were identified as important in terms of both their non-programmed and programmed use and capacities, and the contributions they make to the citys quality of life, urban form and environment.Ž 2.2 Community/Demographic Profile and Trends The demographics of the community are changing. Between the 2006 and 2011 census, Kitcheners population has experienced an 11.6% increase in the over 55 population, as well as a 5% increase in the zero to five-year-old population. The population is also becoming more diverse. All these elements will require effective planning and service responses as the citys demographics continue to transition over the life of the plan.Ž 2.4 Findings Associated with Aging Leisure Facilities The city has numerous leisure facilities that are now 30 to 60 years of age and are constrained in terms of their design, operational efficiency, accessibility, and ability to meet program delivery needs, that will need to be addressed over the short to medium term.Ž 2.5 Service and Program Delivery Efforts to enhance the sustainability of neighbourhood associations and the local community leisure services delivery model relative to shared programming, improved relationships, and other initiatives should continue; The development of a city-wide neighbourhood strategy, focused on taking a comprehensive approach to building and supporting safe and thriving neighbourhoods should be undertaken; A strategy to provide additional older adult programming in new spaces, or utilizing existing spaces more efficiently in strategically located community centres across Kitchener, should be developed; Initiatives to improve the recruitment and retention of volunteers in all areas of leisure services, should be accelerated; Doon Pioneer Park Community Centre Business Case 24 February 2017 7 - 33 Supports to community organizations, to ensure their sustainability, through training and development on governance, budgeting, technology and related areas, including enhanced supports to new and emerging groups, should continue and possibly increase; Strategies that support the increased engagement of people with disabilities, members of multi-cultural communities, youth and others who have barriers to experiencing the full benefits of active leisure participation need to be continually developed and modified.Ž 2.6 Exploring New Partnerships and Financial Strategies Pursuing a unique, comprehensive agreement with the local school boards to enhance access and use of available school indoor and outdoor leisure and recreation facilities that would provide mutual benefits to the community and the school boards, while reducing the need for the city to develop certain types of facilities in the future; Maximizing current city and partner facility use through scheduling and policy and procedures development and applications; Some opportunities exist for the city to become more strategic, coordinated and aggressive in pursuing corporate sponsorships and naming rights for city facilities as an alternative source of income that can support specific service areas or future facilities and/or amenities; Examining more extensive partnerships with community non-profit and private organizations could provide significant mutual benefit in terms of the co-development and direct management of larger leisure facilities, such as indoor aquatic facilities.Ž 2.7 The Aging Population One of the most significant demographic trends evolving in Kitchener and all of Canada is that of an aging population. The data provided in the research report indicates that Kitchener, through continuing to increase its population, will continue to experience an aging profile. This will have impacts on leisure services participation, preferences and needs. The aging profile reflects the transition of the boomer generationŽ into the 55 and older age categories currently and increasingly over the next 20 years. Leisure services providers must recognize that this aging generation may not have the same interest preferences as the legacyŽ generation did. Some of the trends of interest related to leisure services relative to an aging population are: Increased interest in walking as a healthy lifestyle and social experience. This will increase community trail usage and potentially result in some increased challenges related to mixed uses on trails; Higher levels of sport participation than for previous older adult generations due to life-long involvement, health, wellness and social benefits, and sport program changes/modifications to facilitate their participation; A need to ensure that neighbourhood parks can accommodate older adults and that they are not just viewed as being for children and families as these will need to be local parks for more older adults; Important questions as to how older adult centres will evolve for the boomer generationŽ that have had uniquely different life experiences. They may be more interested in a broader menu Doon Pioneer Park Community Centre Business Case 25 February 2017 7 - 34 of leisure activities provided in more locations and involving different groupings of people than a centre or club oriented environment offers; Opportunities for intergenerational engagement may increase via volunteering and participation as the emerging older adults may not want to be identifiedŽ as older or to be limited in their participation in certain leisure services that are viewed as for only younger participants.Ž 4.2 Community Centre Resources Kitchener has evolved a comprehensive system of neighbourhood-focused community resource centres dispersed across the city. They have evolved as valued neighbourhood resources providing enhanced access to leisure services due to their proximity to where people live, providing services that respond to the unique and changing needs of the local areas served and creating opportunities for community leadership and volunteerism. This model also aligns with the citys strategic plans focus on strong neighbourhoods. The consultation program in support of the LFMP update strongly identified the value that residents place on the citys community resource centres and the need to continue to develop, enhance and sustain these important community assets.Ž The Updated LFMP includes the following community resource centres recommendations: 3. That the city work with community leadership and residents to increase the awareness, opportunities, recognition, training and enhanced utilization of community volunteers in the program and service delivery and leadership roles within community centres and within neighbourhoods. 4. That the city develop and implement a comprehensive communications strategy aimed at increasing residents awareness of community centre leisure programming and encouraging more residents to utilize the centres in the future. 5. That the citys policies and procedures, as well as its relationships with and supports to neighbourhood assocations promote and facilitate residents participation in local decision-making while recognizing the uniqueness of each individual community centre in servicing the needs of their local neighbourhoods. 6. That the city develop a strategy to add new older adults program space, or more effectively utilize existing space for additional older adults programming in strategically located community centres across the city. 7. That the city conduct a comprehensive review of its community resource centre operations to facilitate the sharing of best practices amongst centres, and to identify opportunities to improve service delivery and strengthen individual neighbourhoods.Ž The updated LFMP recognizes the importance of volunteerism in the delivery of leisure services and makes the following recommendations: 11. That the city develop a comprehensive neighbourhood strategy that considers a wide variety of factors in the strength of any neighbourhood (e..g, people and cultural connections, leisure opportunities, the built form, neighbourhood design, public safety) and focuses on three objectives: Doon Pioneer Park Community Centre Business Case 26 February 2017 7 - 35 Engaging and empowering more residents in planning, building, sustaining and supporting safe and thriving neighbourhoods based on the unique character and needs of each individual neighbourhood; Building a stronger sense of belonging and connection between residents and their neighbourhoods as a way of increasing civic pride in the community; Aligning municipal staff behind a focus on building safe and thriving neighbourhoods as the basis for a healthy community.Ž The City attempts to work with the local school boards and the updated LFMP makes the following recommendation regarding the community use of schools: 12. That the city increase its efforts to work with local school boards to develop policies, procedures and mechanisms that ensure the maximum use of indoor and outdoor school facilities to the mutual benefit of the schools and city residents, and which minimize the need for additional, duplicated leisure facilities and services.Ž The Updated LFMP identifies the longer term community resource centre needs as Kitchener continues to grow. The Updated LFMP includes a number of recommendations, including Recommendation 31, which is directly related to the DPPCC: 31. That the current planned community centre additions for Doon Pioneer Park Community Centre and Mill Courtland Community Centre be implemented.Ž Table 5-1 of the Updated LFMP also summarizes potential leisure services initiatives/facilities including additional comments, estimated capital costs and potential funding sources. For the DPPCC expansion, $3.7 million is allocated by the City. The proposed expansion aligns with the current leisure services delivery model and aligns with the Citys strategic goal of safe and thriving neighbourhoods. The Updated LFMP establishes the following vision statement to help guide future development of leisure facilities and services: Kitchener residents will have access to a diverse array of accessible leisure opportunities that encourage their active participation and support residents health and well-being, strong and vibrant neighbourhoods and community capacity-building.Ž Several principles are also identified to create a decision-making lens for the directions, strategies and recommendations of the Updated LFMP. The DPPCC expansion aligns with several principles including: balanced array of services; equitable access; innovative financing and delivery models; evaluation; maximum utilization; geographical-based services; supporting specialized needs; neighbourhood centered; and sustainability. Doon Pioneer Park Community Centre Business Case 27 February 2017 7 - 36 The 2005 LFMP established the requirement of a Business Case for any new resource centre, involving a permanent structure and any addition over $250,000 involving the community/neighbourhood association and the City in a partnership. The Business Case is to determine the following: The program and service needs for the area without creating a dependency on rentals by third parties, such as churches and others who service a broader dimension of the community and/or who may have other venue alternatives. That is, feasibility should not be dependent on secondary and tertiary uses. Statement of objectives as to the purpose, focus and direction of the facility. Demand profiles, needs and trends relative to both anticipated hour and participant levels. An Operating Plan identifying the proposed hours of operation, the intended users and related profiles. A review of other available public community spaces that could be utilized relative to their accessibility, affordability, location, capacities, safety and related criteria. Completion of a conceptual floor plan to determine space allocations and sizes. Development of a tested capital cost projection, with appropriate alternatives in terms of specialized equipment, expansions, space alternatives, etc. that give a clear capital investment option or options. A three-year projected operating pro forma. A governance and management plan. Statements as to how this investment will advance the Strategic Plan of the City and the Community Services Department. An assessment of the sustainability of the initiative over a ten-year timeline. Identification of variable sources of capital investments in terms of fundraising, grants, reserves, Development Charges and direct city investment.Ž This Business Case is intended to address the requirements outlined in the 2005 LFMP. Doon Pioneer Park Community Centre Business Case 28 February 2017 7 - 37 4.0 COMMUNITY CENTRE USAGE & NEEDS It is important to understand how the community currently uses the DPPCC when analyzing the needs of the community. As described in Section 1.4 there were three ways the public were engaged throughout this process: stakeholder workshops, a paper and online survey and a public meeting. Through these processes, over 1,200 people were consulted. A primary focus in this consultation was on the features of the DPPCC, both indoors and outdoors, and what priorities the community identified for the renovation and expansion of the community centre. The following sections will analyze the results of the community consultation to provide an understanding of the communitys needs. It is important to note that the survey results are not statistically significant; however, they do give insight into the preferences of the community. 4.1 Community Centre Usage Before assessing the community needs, it is important to understand the existing level of service offered at the DPPCC in order to determine what new services are needed. This section provides a high-level review of the type of programming that exists, the type of meeting and rental space that exists and the staff capabilities at the DPPCC. 4.1.1 Programming Programming is a critical component of the DPPCC and was cited in the survey as one of the primary reasons for using the community centre. Data has been provided regarding program attendance for 2014 to 2016. The DPPCC schedules four sessions throughout the year winter, spring, summer, and fall. Data was not available for the 2014 summer session. The winter, spring and fall sessions included a variety of programs for all ages including children, youth, adults and seniors. These programs are scheduled and require participant registration. In the summer months, there are fewer programs for adults and seniors as the focus shifts towards children's camps and youth drop-in sessions. Table 8 summarizes the programs offered at the DPPCC during the winter, spring and fall sessions held from 2014 to 2016. Not all programs listed were offered during each session. Doon Pioneer Park Community Centre Business Case 29 February 2017 7 - 38 Table 8: List of Programs Offered During Winter, Spring & Fall Sessions (2014 to 2016) Adults/Senior Children/Youth Zumba Learn to Draw Comics Body Boot Camp Minecraft Club Cardio Core Stretch Video Game Design Total Body Workout Ballet Tai Chi Hip Hop Pilates Barre Moves & Grooves Ultimate Workout Jazz Fitness Jamboree Gymnastics Fit for Life Basketball Just My Size Soccer Butts and Gutts Bounce Fit Kids Outdoor Bootcamp Outdoor Childrens Bounce Fit Bounce Fit Piano Lessons Yoga (various levels) Gymboree Badminton ImaginARTion Volleyball Morning Marvel 50 is the New 40! Small Wonders Floor Hockey Wonder Kids Preschool Core Crunch Just 2s Music and Movement Teen Yoga Crafty Tots Teen Body Bootcamp Hockey Dryland Conditioning Guitar Teen Self Defense Parent & Tot Gymnastics Source: City of Kitchener Program Register Reports 2014 to 2016 As previously mentioned, the programs offered to adults/seniors during the summer session are scaled back to focus on children's camps and drop-in sessions. Camps are offered as full day camps, before and after care camps and pre-school camps (half days). Camps require registration in advance. Youth drop-in sessions are also offered throughout most of the summer and run from 6:30 to 9:30 PM. From 2014 to 2016, the number of programs offered in each session (excluding the summer when programs are scaled back) ranges from 49 to 91 with the number of programs trending upwards each session. The fill rate of each program during this time period ranges from 68 to 86%. More recently, the fill rate has fluctuated between 70 and 80% and some programs (i.e. tai chi, hip hop dance, ballet dance, basketball, soccer, kinder gymnastics) regularly have a waitlist. Table 9 summarizes the DPPCCs sessions from 2014 to 2016. Doon Pioneer Park Community Centre Business Case 30 February 2017 7 - 39 Table 9: Summary of Doon Pioneer Park Community Centre Program Activity Spring Fall Winter Spring Summer Fall Winter Spring 2014 2014 2015 2015 2015 2015 2016 2016 49 50 54 55 24 79 83 91 # of Classes 28 23 15 26 4 46 52 42 # of Full Programs 24 18 15 17 6 26 16 14 # of Waitlist Classes 639 668 586 675 402 777 747 720 Registered Participants 86 79 68 79 71 79 79 73 Fill Rate (%) 650.5 806 722 708.5 443.5 951.5 773.5 789 Hours 7 Youth Drop-In Programs 632 Number of Youth Drop-In Participants Source: City of Kitchener Program Register Reports 2014 to 2016 With a number of programs regularly being full and/or experiencing waitlists, there is a need to increase the capacity of the DPPCC to meet the communitys needs. 4.1.2 Space The availability of program space has been a consistent priority raised by stakeholders and the public during the consultation process. The DPPCC currently has four rooms that can be rented out to the public and organizations for private functions and public events. The four rental rooms include: the gymnasium, meeting room, multi-purpose room and kitchen. In 2015, there were a total of 96 functions which resulted in 999.5 hours of use. Rental revenue for 2015 was $20, 025.83. 4.1.3 Staffing The delivery of programs and services at the DPPCC include the combined efforts of City employees, community volunteers, and the Doon Pioneer Park Community Association. This combination is very functional and effective. The City currently employs the following full-time (FT) and part-time (PT) positions at the DPPCC: Facilitator (1 FT) Office and Program Assistant (1 PT) Office and Program Clerk (1 PT) Customer Service Attendants (4 6 PT) The expansion of the current footprint and new program space infrastructure will impact the current staff capacity to maintain facility operations, grow programs and deliver on neighbourhood services. Staffing needs and costs associated with the proposed expansion are further described in Section 6.3 of this report. Doon Pioneer Park Community Centre Business Case 31 February 2017 7 - 40 4.2 Community Centre Needs 4.2.1 Core Programs and Services The DPPCC facility is a shared building with the Kitchener Public Library, which makes the facility unique. The survey results show that the library and their associated activities are one of the most frequent reasons why people visit the facility. Over 70% (n=604) of respondents listed the library as something they use at the facility. The library is an important pillar within the community. The scope of this Business Case, however, does not include the library as part of any renovation or expansion opportunity. Approximately 45% (n= 384) of respondents listed programs as a reason they visit the DPPCC. A summary of the programs offered over the previous two years is included in Section 4.1.1. Current programming at the DPPCC is limited due to restricted space, and as a result, the programs offered are the core activities such as soccer, basketball, yoga, etc. Programming was also identified at the stakeholder sessions as a core program and service of the DPPCC, specifically the childrens activities and programs and the fitness classes available for all ages. Approximately 44% (n=375) of respondents listed the splash pad as a reason they visit the DPPCC, while approximately 35% (n=295) listed outdoor free space. The splash pad (also known as the Sprayground) consists of a concrete pad with a sprinkler system, a brightly decorated pump hose, picnic tables, bench seating and a sun shelter. The splash pad is open from June through September and is free to use. The DPPCC also has two outdoor basketball courts, which are converted into ice rinks in the winter months. These outdoor activities are free of charge for residents and popular among the youth. Approximately 30% (n=255) of respondents listed community centre events as a reason they visit the DPPCC. Several community events are held throughout the year. Scheduled 2016 fall events include the Childrens Halloween Party (October 30), Friday Family Fun Night (November 4) and the Childrens Christmas Party (December 18). Figure 4 illustrates the results of the survey regarding the main programs and uses at the DPPCC for respondents. Doon Pioneer Park Community Centre Business Case 32 February 2017 7 - 41 Figure 4: Core Uses of the DPPCC Outreach program Other (please specify) Private rental Community garden KW Connect computer Church clubs/Organizations Drop-in programs Socialize in lobby area Camps/Youth drop-in Community Centre Events Outdoor free space Splash pad Programs Library activities 0100200300400500600700 4.2.2 Indoor Spaces & Services The DPPCC relies on its indoor space to provide services to the community. Excluding the library, there are four main rooms within the DPPCC: the general purpose room (the gymnasium), the multi-purpose room, the meeting room and the kitchen. The lobby area is also an important gathering place for the community. Dispersed throughout the building are offices for Staff, washrooms, storage rooms and mechanical/electrical rooms. A floor plan of the existing building is included as Figure 5. The community survey asked whether the indoor program space at the DPPCC met their needs. Of the 760 people who responded to this question, approximately 75% (n=568) agreed or partially agreed with this statement. Approximately 13% (n=98) of respondents disagreed with the statement that the DPPCC met their needs and approximately 12% (n=94) were not sure. The community survey then asked residents to rank from 1 to 7 their most valuable indoor spaces at the DPPCC. Weights are applied in reverse, therefore, the respondents most preferred choice (which they rank #1) has the largest weight. Table 10 summarizes the responses from the community survey. Table 10: Community Survey Ranking Respondents Most Valuable Indoor Spaces Indoor Space Score Gymnasium 5.70 Multi-Purpose Room 4.65 Washrooms 4.43 Lobby/Social Area 4.00 Computer Area 3.64 Kitchen 3.29 Other 2.96 The results show that the top three valued spaces at the DPPCC are the gymnasium, the multi-purpose room and the washrooms. The majority of programs and activities at the DPPCC are located in the Doon Pioneer Park Community Centre Business Case 33 February 2017 7 - 42 MULTI-ACTIVITY ROOM DATE: November 18, 2016 Figure 5 EXISTING FLOOR h t r SCALEN.T.S PLAN o n FILE:1077F DRN:NZ K:\\1077F-DOON PIONEER PARK COMMUNITY CENTRE EXPANSION\\REPORT\\FIGURE 5 - EXISTING FLOOR PLAN\\FIGURE 5 - EXISTING FLOOR PLAN.DWG Doon Pioneer Park Community Centre City of Kitchener Regional Municipality of Waterloo 7 - 43 gymnasium and meeting rooms, therefore, the rankings are sensible. The inclusion of the washrooms as part of the top three valued spaces is interesting. Any renovation and expansion project will need to ensure that the washroom facilities are brought up to Building Code including accessibility requirements. Respondents were given the opportunity to add their own responses to the question above in Table 10 under other (an open-ended question). Although this category carried the least amount of weight, the most frequent response was the library. Other responses related to outdoor components of the DPPCC, which is further evaluated in Section 4.2.3. Respondents were asked to select their top indoor priority for the renovation and expansion project of the DPPCC. Over 40% (n=277) of respondents identified a gymnasium expansion as the priority indoor project. Typical answers included a bigger, split or additional gymnasium. The desire expressed by the community for gymnasium enhancements was also shared by many stakeholders. A larger gymnasium or a second gymnasium was identified by stakeholders as a space required to offer the core programs and services at the DPPCC. The next top indoor priority identified by the respondents include more and biggerŽ meeting and multi- purpose rooms with approximately 10% (n=71) of respondents selecting this option. Other priorities identified include, but are not limited to, a new indoor pool* (n=60), a larger lobby (n=56) and more program rooms (n=44). The full results of the priorities identified for indoor spaces by the community survey is illustrated in Figure 6. CźŭǒƩĻЏʹLƓķƚƚƩ{ƦğĭĻtƩźƚƩźƷǤŅƚƩwĻƓƚǝğƷźƚƓ ğƓķ9ǣƦğƓƭźƚƓΛƓўЎАЎΜ OutsideArea,NotIndoor BasketballCourt Kitchen BetterWashrooms(Allgender) Children/PreSchoolSpace SplashPad More/BiggerSocialRooms MoreProgramRooms NewPool(Indoor)* Bigger/Split/AdditionalGymnasium 050100150200250300 *Note: Although cited as a priority in the open-ended question, the addition of an indoor pool cannot be accommodated on this site, as is outside the scope and budget of this expansion. The (2013) Leisure Facilities Master Plan update recommended, as priority four, the addition of an aquatics facility at the Southwest District Park. At the time this document was written, funds for the aquatics facility are planned in the 10-year 0-21. Capital budget forecast and scheduled for 202 Doon Pioneer Park Community Centre Business Case 34 February 2017 7 - 44 4.2.3 Outdoor Services There are also several outdoor amenities available to residents at the DPPCC during all seasons. Outdoor amenities include the splash pad, patio (one located in front of the building and one located at the rear of the building), basketball courts, winter skating rink, community garden, greenspace and the parking lot. Respondents were asked whether the outdoor space at the DPPCC meets their needs. In total, 75% (n=546) of respondents agreed or partially agreed wth this statement. The Community Survey asked respondents to rank from 1 to 7 the most valuable outdoor spaces at the DPPCC. Similar to the responses in Section 4.2.2 above, the weights of these rankings are applied in reverse. Therefore, the respondents most preferred choice (which they rank #1) has the largest weight. Table 11 summarizes the rankings. Table 11: Community Survey Ranking Respondents Most Valuable Outdoor Spaces Outdoor Space Score Splash pad 5.29 Basketball Court/Winter Rink 4.78 Parking 4.29 Front/Back Patio 4.12 Grass Area 4.02 Community Garden 3.82 Other 2.21 The community survey identified the splash pad as the most valuable component of the outdoor space at the DPPCC. A splash pad has been at or near the top of the list of most commonly planned features at parks facilities for many years. Creating an indoor/outdoor neighbourhood recreation environment using a splash pad as a vehicle for connectivity of children and families and to encourage other experiences within the Community Centre is highly recommended. Equally important, and also ranking as a high priority, includes the basketball court/winter rink and the parking area (which is used for a mobile skatepark and other neighbourhood activities). 4.2.4 Priorities The previous sections have established the areas of the DPPCC that people value today. For example, people value the gymnasium and the splash pad. This information is helpful to identify the aspects of the current facility that people value. In addition, Section 4.2 reviewed community responses to the question asking what their priority projects are for the indoor space and more gymnasium space is a significant priority. These questions help identify a wishlist a wholesome list of desired items if there were no restrictions. There are, however, restrictions to the renovation and expansion of the DPPCC. These restrictions are further summarized in Section 5.2 of this report. As part of the public consultation process, a question was asked to focus responses to only the top priorities. Survey respondents were asked to identify the top three new services, activities or opportunities they would like to see offered at the DPPCC. The intent of this Doon Pioneer Park Community Centre Business Case 35 February 2017 7 - 45 question was to determine what the community identified as the priority projects to include as part of this Business Case. The community survey question required the respondent to write in an answer (open-ended question), therefore, a wide variety of responses were provided. From the community survey, the following top ten priorities were identified (note these are responses to an open-ended question): 1.Indoor pool* 2.Splash pad 3.Playground 4.Cooking classes 5.Swimming lessons* 6.Teen programs 7.New gym 8.Toddler programs 9.Yoga 10.Library expansion *Note: Although cited as a priority in the open-ended question, the addition of an indoor pool cannot be accommodated on this site, as is outside the scope and budget of this expansion. The (2013) Leisure Facilities Master Plan update recommended, as priority four, the addition of an aquatics facility at the Southwest District Park. At the time this document was written, funds for the aquatics facility are planned in the 10-year Capital budget forecast and scheduled for 2020-21. The facilitated stakeholder sessions also asked a similar question what are the three most important deliverables/outcomes from this expansion? As the stakeholder groups were smaller than the survey respondents, less priorities were identified. However, the following priorities were identified by the stakeholders and are listed in no particular order: Multi-purpose rooms Better lobby/entrance area More storage More rooms More flexible space Large program room with storage Keep it user-friendly and comfortable More useful space for meeting, gathering and renting Able to accommodate more Two gyms programming It is interesting to note the different priorities from the community survey and the stakeholder workshops. The stakeholders are often the program and service providers in the DPPCC and are identifying priorities related to the amount of space available inside the building as well as the functionality of this space. On the contrary, the survey respondents are typically users of the DPPCC and have identified priorities related to the type of programming and services they wish to have access to. Doon Pioneer Park Community Centre Business Case 36 February 2017 7 - 46 5.0 EXPANSION OPPORTUNITIES 5.1 Objectives The DPPCC is an important community focal point for south Kitchener. As the only community centre south of Bleams Road, the DPPCC serves a large number of residents that continues to grow as new communities are developed. Based on the goals and objectives of the LFMP and the public engagement, the following objectives are proposed for the expansion of the DPPCC: Providing adequate program space to accommodate the planned growth within the study area. Providing flexible rooms that can be used in a variety of ways including program space, meeting rooms, childrens services and recreation. Highlighting the partnership between the DPPCC and the Kitchener Public Library. Ensuring the building is accessible so that there are no barriers for any community members to use the facility. Establish a public realm that connects both indoor and outdoor space to encourage social interaction. Creating a sustainable business model focusing on program and service delivery. 5.2 Site Constraints In evaluating the renovation and expansion opportunities, consideration must be given to existing constraints. Based on a review of the site and discussions with Staff, the following is a summary of potential site and building constraints for redevelopment and expansion of the DPPCC (see Figure 7): Proximity to Grand River Conservation Authority (GRCA) Regulation Limit and floodline the entire eastern perimeter of the property is regulated by the Conservation Authority as a result of the regional floodline associated with Schneider Creek. A fill/site alteration permit would be required from the GRCA for any development within the regulated limit or floodline. Site topography there is approximately 4 metres (13 feet) of grade difference between the limits of asphalt surrounding the Community Centre and the northern limit of the property. Significant re-grading and likely retaining walls may be required to accommodate a new addition and/or reconfiguration of outdoor play areas, parking, etc. Design of Existing Structure the structural design of the existing Community Centre including the roof truss system and pod-like floor plate creates challenges for any addition. All outside walls are bearing walls. Any addition may have to be designed such that it is a separate structure connected to the original building via a hallway. For example, doubling the size of the existing Doon Pioneer Park Community Centre Business Case 37 February 2017 7 - 47 7 - 48 gymnasium may not be possible by a simple addition to the existing structure. Instead it may be best to include a double gymnasium in the building addition and repurpose the existing gymnasium. Library to Have a Prominent Presence the library plays an important part of the Community Facility and any re-design will need to ensure that it remains physically visible to the public in terms of access and building structure. The library requires a portion of the existing service road along the eastern perimeter of the building. Parking any additional space added to the existing Community Centre will require a corresponding addition to surface parking. There is limited room on the site to accommodate additional parking while ensuring adequate green space to provide for either active or passive play space on-site. As noted above, the existing grades may also create additional challenges (and likely costs) to accommodate retaining/site grading. Accessibility- access begins from the street to the building and it is always a challenge to ensure there is minimal encroachment on existing circulation and parking space. This will need to be considered when designing ramps to a newly configured front entrance and potential social cluster spaces, office and program space. Internal wall structure- these will require demolition, redesign and reconstruction to expand the existing interior footprint, and this will result in an extended period of shutdown at the site. LEED requiring construction to a LEED standard will result in cost increases to the facility as well as in the design and post-construction follow-up and monitoring. Interior finishes the decision-making process may require compromise, based on a limited budget. Adaptable and Flexible- spaces should be multi-functional in order for the facility to accommodate changing program trends in the future; there is a limited budget which may require compromises in special design (size, location, aesthetics). Storage- the allocation of storage space is always a challenge with any design and decision makers will have to decide priorities early on in the process to ensure that functionality in operations in achieved. Program space versus storage location and size will demand compromise when dealing with limited budgets and minimal site space for construction. It is a balance that will have to be achieved. Proximity to homeowners design compatibility with neighbouring residential property will need to be considered and residents will need to be involved in the facility development. Location of exterior recreation spaces will involve neighbor consultation in order to avoid any potential site use conflicts. Budget The budget allocated for the DPPCC renovation and expansion is $3.7 million. Alternative sources of revenue could be explored by the City including provincial and federal grants and public-private partnerships. Note, the library does not have capital budget available towards the DPPCC expansion. Doon Pioneer Park Community Centre Business Case 38 February 2017 7 - 49 5.3 Option One Recommended Plan Given the foregoing, a number of expansion options were considered by the project team. After careful consideration of the site, the existing buildings constraints, the community needs identified through the public consultation process combined with current trends and best practices in community facility development, the following option was developed in accordance with the Citys allocated budget of $3.7 million. Option One, as illustrated in Figure 8, remains conceptual in nature and incorporates the following elements: 1.Double Gymnasium: A new gymnasium was one of the priorities identified by the community. The idea of a larger gymnasium was also echoed by staff and user groups, including the Pathway Community Church who requires more space to accommodate their growing congregation. A double gymnasium would support the trend towards more flexible space. A new double (dividable) gymnasium with an area of approximately 384 square metres (4,130 square feet) of space should be constructed to current standards, including height. The new double gymnasium would add needed flexibility to the operation of the DPPCC. The gymnasium should have the option to be divided into two separate program spaces or operated as one large room. New storage space chould also be incorporated between the existing and proposed gymnasiums. 2.Washroom Facilities: Most patrons come to the facility dressed for their activities. There are currently no change rooms at the DPPCC. Washroom facilities should be designed large enough to accommodate for the need to change clothing. 3.Multi-Purpose Rooms: Flexible space and more multi-purpose rooms was a common priority identified by the community and is also recognized by current trends. The concept plan contemplates three multi-purpose rooms whereas only two currently exist. The multi-purpose rooms vary in size from 35 square metres to 61 square metres (377 square feet to 657 square feet). Note, an appropriate size for a multi-purpose room is approximately 75 to 80 square metres. This size would allow for adaptable multi-programming opportunities i.e. dance, fitness, social activities, meetings and all age recreation and adequate storage. Given the smaller rooms, they may need to be designed with divisible walls such that they can be expanded, as required. 4.Redesigned Front Entrance: A common theme from discussions with Staff was the desire to improve the reception area of the DPPCC. The front entrance should be re-designed and moved closer to the library to accommodate the expansion. A new reception area would welcome visitors to the DPPCC and facilitate better customer service experiences. The re-design could also improve security within the building as the reception area would have unobstructed views of visitors coming and going. Maintaining a separate entrance for the library is important in the design. The DPPCC and the library both operate on different schedules and separate entrances would ensure mutually exclusive access to each building. A doorway should be considered between the vestibules of each entrance to allow for the efficient movement of visitors between the DPPCC and library when both are open at the same time. Much discussion has occurred regarding the stained glass windows presently located in the library. The stained glass windows should be considered and efforts made to incorporate them Doon Pioneer Park Community Centre Business Case 39 February 2017 7 - 50 into the redesign to ensure the art remains a prominent feature in the redesigned building and tells a story windows into the pastŽ. 5.Social Space: The DPPCC is the social hub for the community. On a summer day there is a large crowd usually gathered on the front patio. When the weather turns, the community regularly uses the lobby area within the existing building to socialize. Space for unstructured activities is identified as a current trend. The expansion should try to increase the lobby area within the DPPCC to expand the non-structured social node. In total, 357 square metres (3,843 square feet) of existing space within the DPPCC is proposed to be renovated and a 571 square metres (6,146 square feet) addition is proposed to expand the DPPCC. As noted above, approximately 384 square metres (4,130 square feet) of the proposed addition is for a new double gymnasium, while the balance of the addition (187 square metres/2,016 square feet) would be allocated towards space for multi-purposes rooms, offices and the reception area/redesigned front entrance. With the proposed addition, the DPPCC (excluding the library) would total 1,474 square metres (15,866 square feet). The addition would place the DPPCC in the mid-size community centre category within the City. Comparable community centres based on size include Rockway, Country Hills and Stanley Park Community Centres. It is also noted that a target of 1.5 square feet per capita may be used for the preliminary planning of neighbourhood hubsŽ (excluding larger/specialized facilities such as arenas, indoor pools, and the theatre). Based on this guideline, the subject area 2036 population projection of 28,390 to 31,114 people would require an 18,929 to 20,743 square foot hub to meet the target population (Source: City of Vaughan Active Together Master Plan, Indoor Recreation Facility Assessment 2013). The capital costs associated with Option One are discussed in Section 6.1. Library Although part of the facility, the library is not part of the mandate for the renovation/addition. Having the library as part of the facility is, and will continue to be of benefit to the community. Continued opportunities for cross-programming should be pursued. Staff from KPL and the community services division should plan complementary activities and events. The DPPCA should consider a collaborative approach with the library to deliver programs that can utilize multi-functional space within the library and vice-versa in the Centre overall. The final design may want to consider options in the event that the library wishes to renovate in the future (e.g. placement of room for preschool programming). Doon Pioneer Park Community Centre Business Case 40 February 2017 7 - 51 1 3 . 6 3 7 - 52 5.4 Option Two Preferred Plan In addition to Option One discussed in Section 5.3, Option Two is also identified for the Citys consideration. Option Two is presented as an alternative and includes features that should be included in the expansion but could not be accommodated given the Citys current budget for this project. Should additional funding be secured, the following additional features/program spaces are strongly recommended to be included in the expansion in order for the Community Centre to meet current and projected programming needs. Option Two includes the following additional components (see Figure 9): 1.New Splashpad: One of the top priorities identified by the community for this expansion was a new splashpad. The current splashpad (Sprayground) was constructed in 1996 and now experiences low water pressure. The DPPCC expansion should feature the construction of a new, larger splashpad to replace the current one. Consideration should be given to include a variety of inground, mounted and water features within the splashpad. There are several splashpad products available that will need to be considered during detailed design. The total price of the splashpad will increase with the number of features. Should cost become an issue, the City may wish to service the splashpad and only install the number of features within its budget. Additional features can be installed as funds become available. As a minimum it is recommended that under ground servicing upgrades to the future splash pad area should be considered as part of the site servicing to implement Option One in order to realize potential cost savings by avoiding duplication of work and any future disruption to the operation of the DPPCC. Flexible space was identified as a priority for the DPPCC expansion. In Option Two, 2.Larger Addition: two multi-purpose rooms, office and reception areas could be further enlarged to meet the DPPCCs future needs. The two multi-purpose rooms as part of the addition could be enlarged to 70-77 square metres (approximately 753-830 square feet). These room sizes are similar to multi- purpose rooms at other City Community Centres and provide more flexibility in the type of programming that can be held within these spaces and would allow the DPPCC to respond to growing program needs. In total, Option Two recommends a 647 square metre (6,964 square feet) addition to expand the DPPCC. With the proposed addition, the DPPCC (excluding the library) would total 1,550 square metres (16,684 square feet). The capital costs associated with Option Two are discussed in Section 6.2. Doon Pioneer Park Community Centre Business Case 41 February 2017 7 - 53 1 3 . 6 3 7 - 54 5.5 Timeline The Business Case must first be approved by Council of the City of Kitchener, which is anticipated to occur in February 2017. Once the Business Case is approved, the City can proceed towards construction. Figure 10 summarizes the next steps and estimated timeline for the DPPCC expansion. Figure 10: Projected Expansion Timeline March 2017 February 2017 February 2017 to May 2017 Business Case approval by Retain Consultant Business Case Community & (design/construction approval by Council planning) Infrastructure Committee June 2018 April 2017 August 2019 to August 2019 to June 2018 Design •Working drawings Construction Construction •Site plan approval Completion •Building permits Doon Pioneer Park Community Centre Business Case 42 February 2017 7 - 55 6.0 ECONOMIC ANALYSIS 6.1 Capital Cost of Option One Capital costs for Option One were estimated in conjunction with James Fryett Architects, an experienced recreational facility designer with a qualified background in estimating construction costs in todays market. The estimates include building and related site development construction costs and contingencies; professional fees; permit fees and landscaping works. Note, the following estimates do not provide any allowances for land costs. This estimate of costs is based on the professional opinion and experience of MHBC, James Fryett Architects & Raymond Consulting. Tendered bids or actual construction costs may differ due to instability in market conditions, material costs, labour costs and will supersede the estimates shown in Appendix C & D. The total cost estimate for Option One of the DPPCC expansion is $3,752,918.71. The construction estimate for the expansion is $2,740,500.00. Non-building construction costs were also estimated and make up the remainder of the estimate, as follows: Land costs and associated legal fees are included at a zero dollar value because the site is already municipally-owned. An allowance of $350,000 is included for site development, storm and water relocation, erosion control, asphalt, curbing, line painting, lighting, renovated front entrance stairs and ramps. Professional fees are estimated at appropriate percentage rates by discipline, and include Architectural, Structural, Mechanical, Electrical, Civil and Landscaping at a cost of $274,050 (approximately 10% of construction costs). Construction contingencies are estimated at $356,265. Upgrades to electrical services, security system, building automation system, fire alarm system, inclusion of a sprinkler system and demolition of hard surfaces, where needed, are estimated at $223,500. Allowance for landscaping includes rough and fine grading, topsoil and seed and plantings at an estimate of $125,000. The project includes an allowance of $219,240 for fixtures, furnishings and equipment (approximately 8% of construction costs). Doon Pioneer Park Community Centre Business Case 43 February 2017 7 - 56 An allowance of $50,000 for fees associated with the site plan approval application, building permit application, and development charges. An allowance for Geotechnical services and site surveys is estimated at $22,000. An allowance of $27,405 has been included for the provision of public art, estimated to be 1% of construction costs. No allowances are included for management and overhead costs, including project management fee, planning and administrative costs, project insurance during construction, and project commissioning and move-in allowances. No contingencies are allotted for non-construction elements, such as additional professional fees. HST for the entire project is included at $63,458.71. The total project construction cost is estimated based on $125 per square foot of renovated space and $250 per square foot for the new addition (based on 2017 costs). This cost estimate for Option One is within the Citys allocated budget for the DPPCC expansion. 6.2 Capital Cost of Option Two As described in Section 5.4 there are components that should be considered through the expansion of the DPPCC but cannot be included as part of Option One due to financial constraints. Should additional funding become available, the City should consider adding a new splashpad and a larger addition in accordance with the feedback received from the public and stakeholders. The purpose of this section is to outline the capital costs of Option Two. The cost estimate for Option Two is included as Appendix D. The total cost estimate for Option Two of the DPPCC expansion is $4,282,666.50. The construction estimate for the expansion is $3,144,750.00. Non-building construction costs were also estimated and make up the remainder of the estimate, as follows (only those values which are different from Section 6.1 are noted): The project includes an allowance of $200,000 for a new splashpad (splash play) area to replace the existing pad. Professional fees are estimated at appropriate percentage rates by discipline, and include Architectural, Structural, Mechanical, Electrical, Civil and Landscaping at a cost of $300,000 (approximately 10% of construction costs). Construction contingencies are estimated at $408,817.50. The project includes an allowance of $251,580 for fixtures, furnishings and equipment (approximately 8% of construction costs). Doon Pioneer Park Community Centre Business Case 44 February 2017 7 - 57 An allowance of $31,448 has been included for the provision of public art, estimated to be 1% of construction costs. HST for the entire project is included at $74,071.50. Should the City wish to proceed with Option Two to include a splashpad and a larger addition in accordance with the feedback received from the public and stakeholders, then an additional $529,747.79 will be required (in addition to the cost estimate for Option One of $3,752,918.71). 6.3 Operational Structure Impact of Proposed Expansion Due to the operating partnership arrangement between the City of Kitchener and the Doon Pioneer Park Community Association, it is not within the scope of the Business Case process to predict the impact of the proposed facility expansion on the financial operating position of the DPPCA. However, a number of items that impact the future operations and financial sustainability of the Centre are highlighted based on best practices and the consultation process: The proposed expansion essentially doubles the programmable floor space of the Centre, which will generate increases in all user visits to the facility. It should be anticipated that there will be an immediate spike in use that will stabilize over time with a gradual increase in program offerings over the future operation of the Centre. The largest increase in demand will result from the addition of a double gymnasium. This will bring with it an increased capacity to deliver multiple programs in a multi-purpose environment for all ages as well as opportunities to accommodate rentals. Based on the increase in space, programs and resulting hours of operation, an increase in utility cost should be anticipated. The current trend in increasing utility rates will continue and result in higher expenditures over time. Cost of building maintenance materials and supplies along with office supplies will increase marginally over time. Miscellaneous expenses such as computer hardware/software, program supplies, marketing cost, training materials, etc. may increase gradually over time with some cost remaining relatively constant once program capacity is reached. Staffing The management structure and staff currently providing services at the DPPCC and to the community has been restructured in 2016. The expanded DPPCC will be considered a mid-size centre, and staff structure will be in line with other similar sized centres. Multi-functional, cross-programming space will require an optimization strategy that will result in enhanced program delivery and a need to expand volunteer and partner opportunities. It should be Doon Pioneer Park Community Centre Business Case 45 February 2017 7 - 58 anticipated that program growth will require an increased focus on resources for the DPPCA and centre staff. Currently the Community Centre staff contingent consists of the following positions: Facilitator (1 FT) Office and Program Assistant (1 PT) Office and Program Clerk (1 PT) Custeromer Service Attendants (4 - 6 PT) The Centre staff report to a Supervisor of Community Centres who provides support and direction and liaison to three Community Centres and the southwest Kitchener community. Figure 11 illustrates the staffing model for the newly expanded community centre. Figure 11: Proposed Doon Pioneer Park Community Centre Organization Structure Supervisor Community Centres Facilitator Office and Office and ProgramProgram Clerk Assistant (PT)(PT) CustomerCustomerCustomerCustomer ServiceServiceServiceService Attendant (PT)Attendant (PT)Attendant (PT)Attendant (PT) As seen in other Community Centres following an expansion, staff budgets have been based on the following: Greater intensity of use will require additional customer service and administrative support resources; Extended and more consistent hours may be required as the DPPCC focuses on optimization of usage, particularly during daytime and weekends; Safety and risk management protocols will need to be addressed and it will be advisable to have two or more staff persons at the Centre during high-demand times; Doon Pioneer Park Community Centre Business Case 46 February 2017 7 - 59 Population growth will also stimulate community initiatives, events, and neighbourhood demands on resources; Growth in the Centres activity will place added demands on the DPPCAs Board of Directors and centre stakeholders, requiring enhanced staff support. Gymnasium and Multi-Purpose Rooms The re-developed Community Centre would contain a number of program spaces that can be used for various activities, sport, fitness, instructions, day camps, children/youth/senior-specific programming, community events and meetings. Several spaces will provide flexibility to accommodate a wider range of activities. Programming trends are continuously changing and all ages want to try new experiences particularly those that encourage socialization in smaller groups and connectivity within the neigbourhood between cultures and families. Examples of programs that are selling today and generating new revenues and delivering new and changing experiences for all ages include: Youth soccer classes Senior trips iPad 101 Kids in the Kitchen Broadway moves Youth carpentry classes Pay-as-you-go classes for seniors and adults Anything techie Health and wellness Creative movement Crochet After school crazy ball Pickleball for families Sports/fitness for toddlers Learnn play sports Community Room/Classroom/Skills Development These types of spaces are increasingly popular for structured, educational and skills development programs. Ideally, they would accommodate computers, audio-visual equipment, etc. This space could be programmed throughout the day for at-home parents and older adult classes, after school for homework assistance/tutoring, and in the evening for classes catering to those who work during the day. When rented for meetings and training sessions, the space provides another revenue stream for the facility. The increase in multipurpose space allows for more flexibility in offering meeting, training and after school programs particularly if the collaborative use of space with the Library can be developed. Doon Pioneer Park Community Centre Business Case 47 February 2017 7 - 60 6.4 Projected Revenues and Expenses The community centre usage discussed in Section 4.1 of this report identifies the programs offered, the seasonal demand and most notably the fill rate of each program that fluctuates between 70 to 80%. A number of programs are experiencing capacity maximization, which has resulted in regular occurrences of waitlisting. The major booking space is the Gymnasium with 248 bookings in 2015 attracting some 15,670 visitors/participants. Meeting rooms are also showing a very high rental demand at 185 bookings with 10,336 visitors/participants. This clearly indicates that the DPPCC is aligned with current and future trends in that gymnasium and meeting/multipurpose rooms are growth areas and reliable revenue generators. The proposed expanded floor space for potential rentals/bookings and program enhancements are all key drivers of long-term sustainability for the Centre. Given the projected population increases as well as changes in the overall demographics of the Doon Community and surrounding catchment areas, it is anticipated the projected operating budget of the expanded facility will be increased by $115,000 (starting in 2018). Annual increases will be applied as per annual budget calls. Doon Pioneer Park Community Centre Business Case 48 February 2017 7 - 61 7.0 CONCLUSION This Business Case contains a comprehensive review and analysis of the current needs and capacities of the subject area, based primarily on existing services, current demographic profiles and projected population and households to 2036. Extensive public and stakeholder engagement has been undertaken to determine the needs of the community and proposes an expansion to the DPPCC facility that addresses those needs. In total, over 1,200 people were engaged through the process and were able to provide their input on the expansion opportunity. The contents of this Business Case support the proposed expansion. The DPPCC is one of fourteen community centres within the City of Kitchener and is the only one located south of Bleams Road. The southwest area of Kitchener is forecast to experience significant amount of growth over the 20-year planning horizon as development occurs. Based on two different methodologies, the Business Case projects a population increase between 8,366 and 11,086 people and a household increase between 3,512 and 4,000 units by the year 2036. This represents a maximum projected population increase of 55% and a maximum projected household increase of 56%. This trend indicates that demand for community and social programming will to continue to rise and specific segments of the population (e.g. seniors, youth, families) have unique needs when it comes to recreation. Through the public and stakeholder engagement, several priorities were identified for the expansion including, but not limited to: splashpad, playground, additional programming, multi-purpose rooms, more flexible space, more storage, a new double gymnasium and a better lobby/entrance area. All of the suggestions were considered in developing the concept plans. Option One aims to address many of the comments heard through the public and stakeholder engagement while ensuring that the cost does not exceed the amount the City has allocated for the DPPCC expansion. Option One (Figure 8) proposes a 571 square metre (6,146 square feet) addition as well as 357 square metres (3,843 square feet) of renovations to the existing building. Following the expansion, the DPPCC will total 1,474 square metres (15,866 square feet). Highlights of Option One include: a double gymnasium (approximately 384 square metres/4,133 square feet), change rooms/washrooms, four multi- purpose rooms, a redesigned front entrance and more social space. The cost for the Option One expansion of the DPPCC is estimated to be $3,752,918.71. This estimate includes construction costs, soft costs, site development and a construction contingency. These figures align with the amount that has been budgeted by the City of Kitchener in their Development Charges Background Study and Capital Budget. In addition to Option One, there are some components that are believed to be important to include in the DPPCC expansion and were identified as priorities by the community. These components include a new splashpad and more flexible rooms (accommodated through a slightly larger addition). Incorporating these components are presented as Option Two. Doon Pioneer Park Community Centre Business Case 49 February 2017 7 - 62 Option Two proposes a 647 square metre (6,964 square feet) addition as well as 357 square metres (3,843 square feet) of renovations to the existing building. Following the Option Two expansion, the DPPCC would total 1,550 square metres (16,684 square feet). Highlights of the expansion include: a new splashpad, a double gymnasium (approximately 384 square metres/4,133 square feet), change rooms/washrooms, four multi-purpose rooms, a redesigned front entrance and more social space. The cost for the Option Two expansion of the DPPCC is estimated to be $4,282,666.50. Option Two would require additional funding in the amount of $529,747.79. The proposed expansion will advance the goals of the Citys Strategic Plan. The Strategic Plan identifies proceeding with the expansion to the DPPCC as a specific action item. Additional goals to encourage active participation, creating new recreational opportunities and promoting peoples health, happiness and well-being are also supported through the proposed DPPCC expansion. The proposed expansion could start construction in the middle of 2018 and be finished by the middle of 2019. Doon Pioneer Park Community Centre Business Case 50 February 2017 7 - 63 APPENDIX A: Stakeholder Questionnaire Doon Pioneer Park Community Centre Business Case 51 February 2017 7 - 64 Meeting with Neighbourhood Association, June 16, 2016 Doon Pioneer Park Community Centre NeighbourhoodAssociationFacilitation What do you consider to be core programs and services? What spaces would you recommend for these programs and services? In your opinion, what makes the DPPCC unique from other City of Kitchener Community Centres? 7 - 65 Meeting with Neighbourhood Association, June 16, 2016 Are there key opportunities to improve the programs and services at DPPCC? What does this mean for how the building is changed and/orupgraded? What are the key challenges to overcome in this expansion Business Plan? What are the three most important deliverables/outcomes from this expansion? 1. Ћ͵ Ќ͵ 7 - 66 Meeting with DPPCC Staff, June 9, 2016 Doon Pioneer Park Community Centre Staff Team Facilitation What do you consider to be your core programs and services? What spaces would you recommend for these programs and services? In your opinion, what makes the DPPCC unique from other City of Kitchener Community Centres? 7 - 67 Meeting with DPPCC Staff, June 9, 2016 Are there key opportunities to improve the programs and services at DPPCC? What does this mean for how the building is changed and upgraded? What are the key challenges to overcome in this expansion Business Plan? What are the three most important deliverables/outcomes from this expansion? 1. Ћ͵ Ќ͵ 7 - 68 APPENDIX B: Online Survey Doon Pioneer Park Community Centre Business Case 52 February 2017 7 - 69 7 - 70 7 - 71 7 - 72 7 - 73 7 - 74 7 - 75 7 - 76 7 - 77 APPENDIX C: Cost Estimate (Option One) Doon Pioneer Park Community Centre Business Case 53 February 2017 7 - 78 APPENDIX C: Preliminary Cost Estimate (Option One) ItemDescriptionQuantityUnitUnit CostEstimated Cost Construction Costs 1Renovation3,950 sqft$125/sqft$493,750.00 2Addition6,146 sqft$250/sqft$1,536,500.00 3Renovated Front Entrance (Stairs and Ramps)$150,000.00 4Site Servicing (storm and water relocation, $200,000.00 erosion control, asphalt, curbing, line painting, lighting) 5Electrical Service Upgrades$50,000.00 6Security System/BAS Upgrades$75,000.00 7Fire Alarm System Upgrades$30,000.00 8Sprinkler System$46,000.00 9Demolition hard surfaces$22,500.00 10Landscaping$125,000.00 11Rough Grading $6,750.00 12Fine Grading, Topsoil, and Seed$5,000.00 SUB-TOTAL (CONSTRUCTION):$2,740,500.00 13% Contingency (Construction):$356,265.00 Soft Costs 13Architectural, Stuctural, Mechanical, Electrical, $274,050.00 Civil, Landscape 14Fixtures, Furnishings and Equipment$219,240.00 15Site Investigation Costs (e.g. geotechnical, $22,000.00 survey) 16Public Art$27,405.00 17Permits, Approvals, etc (incl GRCA)$50,000.00 SUB-TOTAL:$592,695.00 TOTAL (BEFORE TAX):$3,689,460.00 HST:$63,458.71 TOTAL:$3,752,918.71 NOTES: - Cost of planting soil mix and installation is included in the estimated cost of plant materials. - Grading cost subject to change based on final grades - Consultant fees estimated at approximately 10% of construction costs. - Fixtures, furnishings and equipment are estimated at approximately 8% of construction costs. - Public art is estimated at approximately 1% of construction costs. This estimate of costs is based on the professional opinion and experience of MHBC, James Fryett Architect & Raymond Consulting. 7 - 79 APPENDIX D: Cost Estimate (Option Two) Doon Pioneer Park Community Centre Business Case 54 February 2017 7 - 80 APPENDIX D: Cost Estimate (Option Two) ItemDescriptionQuantityUnitUnit CostEstimated Cost Construction Costs 1Renovation3,950 sqft$125/sqft$493,750.00 2Addition6,963 sqft$250/sqft$1,740,750.00 3Renovated Front Entrance (Stairs and Ramps)$150,000.00 4Site Servicing (storm and water relocation, $200,000.00 erosion control, asphalt, curbing, line painting, lighting) 5Electrical Service Upgrades$50,000.00 6Security System/BAS Upgrades$75,000.00 7Fire Alarm System Upgrades$30,000.00 8Sprinkler System$46,000.00 9Demolition hard surfaces$22,500.00 10Landscaping$125,000.00 11Rough Grading $6,750.00 12Fine Grading, Topsoil, and Seed$5,000.00 13Splash Pad (non-recirculating)$200,000.00 SUB-TOTAL (CONSTRUCTION):$3,144,750.00 13% Contingency (Construction):$408,817.50 Soft Costs 14Architectural, Stuctural, Mechanical, Electrical, $300,000.00 Civil, Landscape 15Fixtures, Furnishings and Equipment$251,580.00 16Site Investigation Costs (e.g. geotechnical, $22,000.00 survey) 17Public Art$31,448.00 18Permits, Approvals, etc (incl GRCA)$50,000.00 SUB-TOTAL (SOFT COSTS):$655,028.00 HST:$74,071.00 TOTAL:$4,282,666.50 NOTES: - Cost of planting soil mix and installation is included in the estimated cost of plant materials. - Grading cost subject to change based on final grades - Consultant fees estimated at approximately 10% of construction costs. - Fixtures, furnishings and equipment are estimated at approximately 8% of construction costs. - Public art is estimated at approximately 1% of construction costs. - Addition & renovation construction costs are based on 2017 estimates. This cost estimate assumes inflationary increases in 2018, if any, are covered by the contingency. This estimate of costs is based on the professional opinion and experience of MHBC, James Fryett Architect & Raymond Consulting. 7 - 81