My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INS-17-018 - Balzer Creek Trail
CityofKitchener
>
Public Access Folders
>
Reports - 01-08-003
>
INS (Dec 2010-Pres)
>
2017
>
INS-17-018 - Balzer Creek Trail
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 4:17:12 PM
Creation date
2/24/2017 4:17:11 PM
Metadata
Fields
Template:
Reports
Department Name
Infrastructure Services
Date of Report
2/13/2017
Date of Meeting
3/6/2017
Document Relationships
CIS Minutes - 2017-03-06
(Message)
Path:
\Public Access Folders\Minutes\Standing Committees - 02-01-241\Comm & Infra Serv (Dec 2010-Pres)\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 1: Balzer Creek Restoration Study Area & Trail Context <br />The Balzer Creek tributary is defined as three reaches, as depicted in Figure 1. <br />Highlighted improvements of all reaches are as follows: <br /> Creek improvements including stabilization, bank reinforcements, alignment <br />relocations, vegetation and habitat enhancements <br /> Replacement of substandard pedestrian bridge (Reach 1, Country Hills Park <br />connection) <br /> Trail construction, including continuation of existing trail from Coach Hill Dr. to <br />Homer Watson Blvd., integration of Homer Watson Blvd underpass and link from <br />Homer Watson to Fallowfield Dr. <br />The creek restoration project is currently in the detailed design stage and targeting <br />construction for the summer of 2017. <br />4 - 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.