HomeMy WebLinkAboutCAO-17-025 - Business Plan Status Update Report REPORT TO: Finance & Corporate Services Committee th DATE OF MEETING: October 30, 2017 SUBMITTED BY: Laurie Majcher, Manager Strategy & Business Planning, 519-741-2200 ext.7817 PREPARED BY: Sinisa Savic, Interim Corporate Planning Advisor, 519-741-2200 ext.7268 WARD (S) INVOLVED: All Ward(s) th DATE OF REPORT: October 16, 2017 REPORT NO.: CAO-17-025 SUBJECT:Business Plan Status Update August 2017 __________________________________________________________________________________________ RECOMMENDATION: For Information BACKGROUND: All of the action items from the Strategic Action Plan approved by Council on December 5, 2016 have been incorporated into the 2017 corporate Business Plan. The purpose of this plan is to ensure that strategy drives our business. Having staff commitment to integrate this work into the ongoing operation of the organization provides a management framework that creates clarity and focus for following through on the promises made to the community in the c strategic plan. Every action item on this list is designed to make progress on the priorities in the strategic plan and the community vision to build an innovative, caring and vibrant community. Accountability and resources have been assigned to carry out the plan, in accordance with the approved 2017 budget, and work is already underway on those actions targeted for this year. The status of projects on the Business Plan is reported to Council three times per year, and progress for ongoing initiatives is reported annually at year-end.Ageneral summary of the and key planned events for each project. The intention of sharing this information regularly with council is to demonstrate full transparency and accountability on the commitments the organization has made to the public through the plan. The purpose of this report is to provide Council with the status of all active business plan st projects as of August 31, 2017. The status updates will illustrate the degree to which the organization is making meaningful progress on strategic priorities and following through to completion on projects that are started, while delivering on the day-to-day needs of the community and responding to unanticipated demands along the way. *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. IF1 - 1 REPORT: There are 88 projects on the City of Kitchener 2017 Business Plan that were in progress st between May andAugust of this year. As of August 31,88% of all active projects are on track to be completed as planned and 28 projects are expected to be completed by the end of 2017.Significant progress has already been made on a number of projects so far this year with the following projects completed: 1.Residential Intensification in Established Neighbourhoods Study (NB07):On March th 20, 2017,Council approved a studythatinvestigatedissues and providedoptions and recommendations on how to address the increasing growth and intensification pressures in many neighbourhoods. The recommendations identified from the studyfocus onresidential zoningchanges,process enhancements and community engagement. A citizen guide to intensification wasprovided with the deliverables of the study. th 2.Canada 150 Wi-Fi Expansion (EC06): On May 16, 2016, Council Approved the request to increase the purchase ecord for additional network hardware to implement Wi-Fi across public locations as part of the Canada 150 grant program. Funding was secured to implement a Wi-Fi network at numerous City of Kitchener facilities including the Kitchener Memorial Auditorium, Victoria Park and McLennan Park. The network has been implemented and has gone live at all locations. th 3.Development of Alternative (low cost) Traffic Calming Options (NB06): On June 26, 2017 Council approved the commencement of a low cost/ seasonal traffic calming program to be set in 2018 to alleviate speeding concerns until a formal traffic calming review takes place. Through the program each Ward Councillor, in consultation with Transportation Services staff, establishes two locations per ward to execute radar speed display signs to help alleviate residential speeding concerns. th 4.Update the Downtown Kitchener Action Plan (EC10): On June 26, 2017, Council approved the updated Downtown Kitchener Action plan and its Strategic Priorities. Building off of the 2012-2016 plan and with extensive consultation the strategic priorities that the updated plan will follow will be centered around; Igniting the Downtown as platform for the next generation of urban shops, restaurants, business & services, Foster heartfelt Urban experiences and Championing a caring and collaborative community. It is important to keep in mind that at any point in time it is normal and expected that up to 30% of projects on the plan may run into unanticipated or uncontrollable circumstances that prevent those projects from moving forward as planned. Since the consistent delivery of core service to the public is the number one priority for the organization, capacity is often redirected from projects to core service when unexpected vacancies occur for key positions or the workload associated with meeting the demand for service go beyond what was expected at the time the plan was approved. The following projects are expected to experience minor delays and their end dates have been adjusted. However, they are all expected to be completed by the end of 2017, including: Community Gardens Program (NB03);Parking Payment Technologies (CS54);Parking Business Plan review (CS07); Neighbourhood Property Standards Compliance Review and IF1 - 2 Proactive By-Law Enforcement (CS20); and, PARTS Midtown RT Station Area Plan (NB08). Four projects that are currently active have experienced more significant delays in progress, and their end dates have been revised as follows: Previous New PROJECTEXPLANATION End DateEnd Date Dec Dec RFP process for Creative Hub was not Arts and Culture Strategy (EC01) 20172018successful in finding suitable proposalswhich has delayed this project Long Term Financial Plan (CS09)Dec AugResource constraintsdue to main staff being 20172018required for other Corporate projects E-Tendering(OG08)Dec Dec Implementation was staggered and more time 20172018will betaken to ensure new Purchasing By- Law is followed Iron Horse Trail Improvement Dec Aug Project needs to be re-tendered as original Strategy (Priority A Central 20172018yielded no bids for work Section (SE07) st A full listing of all active projects on the 2017 Business Plan and their status as of August 31, 2017 can be found in Appendix A. ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: through the delivery of core service. FINANCIAL IMPLICATIONS: None COMMUNITY ENGAGEMENT: INFORM council / committee meeting. ACKNOWLEDGED BY: Dan Chapman, Chief Administrative Officer IF1 - 3 Appendix A 2017 Business Plan Status Update As of August 31, 2017 CAO's DEPARTMENT Victoria Raab(519) 741-2200 ext. 7935 Corporate Communications & Marketing OG18Review and Update Corporate Digital Media Strategy Status as of Aug 31st 2017: ON TRACK Aug-2018 Expected Completion: Description: Recent Progress: Stakeholder interviews have been conducted. Existing strategy has communication strategy and evaluate against been reviewed and new objectives have been identified as well approach defined. Research undertaken for potential tools to be used. communications are efficient and effective in Next Steps: connection with citizens about programs, Finalizing of final report and recommendations. Communicating report services and decisions that affect them. with stakeholders while beginning implementation of identified recommendations. Cory Bluhm(519) 741-2200 ext. 7065 Economic Development EC01Arts & Culture Strategy Status as of Aug 31st 2017: DELAYED Dec-2018 Expected Completion: Description: Recent Progress: Consult with stakeholders to develop a multi- Significant consultation has been conducted through the Creative Hub year plan for arts business and cultural vitality process. strategy including digital media, music, film Next Steps: design and emerging clusters. 1.Fine tune the vision for a creative hub based on the learnings from the Request for Proposal (RFP) process and additional stakeholder engagement 2. explore possible business models/partnerships for establishing a creative hub 3.Further engagement with stakeholders and potential partners relating to the vision and business model 4. Report back to Council in Dec/Jan. Once a firm direction is established for the Creative Hub, the process of developing the Arts and Culture strategy will continue. The end date for this project has been delayed from December 2017 to December 2018. Status as of Aug 31st 2017: EC04Special Events and Urban Vitality Strategy ON TRACK Dec-2017 Expected Completion: Description: Recent Progress: Development of a special events and urban We have received more than 2,000 surveys back from the community vitality strategy that supports the overall through Engage Kitchener. Survey results have all been entered objectives of the Kitchener Economic online through the Engage portal and the results have been compiled. Development Strategy. Meetings with the Director of Economic Development have been set to discuss utilizing the raw data obtained from the surveys and tying it into the Make It Kitchener Strategy. Next Steps: Discussing with downtown development team on ways to coordinate activities together considering the close relationship on many projects within the downtown. Meeting with corporate communications on digging deeper into the messaging behind the survey results. IF1 - 4 Cory Bluhm(519) 741-2200 ext. 7065 Economic Development Status as of Aug 31st 2017: EC08Advanced Manufacturing Incubator ON TRACK Dec-2017 Expected Completion: Description: Recent Progress: Support the development of an advanced Working in partnership with Communitech. The completed Deloitte manufacturing incubator in Kitchener, offering business plan will form part of the submission through the Federal specialized accelerator programming for startup manufacturers. Q3. A strategic planning session was held in Q2 with various community stakeholders to create a vision for the incubator. Next Steps: An application to the Federal Government's Innovation Supercluster Funding for this initiative was submitted in July 2017. We will be advised if we have been shortlisted in September 2017. EC10Update the Downtown Kitchener Action Plan Status as of Aug 31st 2017: COMPLETED Aug-2017 Expected Completion: Description: Recent Progress: The Downtown Kitchener Action Plan (2012- Major public consultation completed (Shape DTK 2020) Strategic 2016) focuses on organizing City and BIA priorities developed and endorsed by Council on June 26th, 2017. programs, services and resources to leverage Next Steps: these assets and stimulate positive spin-off investment, engaging the community along the way to ensure the City continues to move in the direction preferred by Citizens. EC19Kitchener Market Strategy Implementation Plan Status as of Aug 31st 2017: COMPLETED Aug-2017 Expected Completion: Description: Recent Progress: The development of a strategy to map out the Staff have developed a plan for actions that can be implemented future role of the Kitchener Market in the using existing resources. Any implementation items that require community taking into consideration its Council approved funding will be presented to council as part of the contribution to quality of life, the local food annual budget process. economy and the overall vitality of Downtown Next Steps: Kitchener. Key stakeholders will be engaged and recommendations will be presented to City Council. Status as of Aug 31st 2017: EC22Creative Hub Implementation: RFP Process COMPLETED Dec-2017 Expected Completion: Description: Recent Progress: The establishment of a Creative Hub to Request for proposal (RFP) Process was undertaken and completed. incubate and strengthen the growth of arts and Unfortunately there were no successful proposals submitted. The future direction for the Creative Hub will be addressed through the Economic Development Strategy, Make it Arts & Culture Strategy. Kitchener was supported by Council in 2016. Next Steps: The implementation of this will involve an RFP process to select an operator at the preferred location of 44 Gaukel street. IF1 - 5 Cory Bluhm(519) 741-2200 ext. 7065 Economic Development Status as of Aug 31st 2017: NB12Rockway Centre Partnership Development ON TRACK Dec-2019 Expected Completion: Description: Recent Progress: Gather all relevant information to inform the Options are being reviewed. Request for Proposals process for the redevelopment of the Rockway Centre into a Next Steps: medium-to-high density mixed use project. NB24Neighbourhood Markets Status as of Aug 31st 2017: ON TRACK Dec-2017 Expected Completion: Description: Recent Progress: Explore options to increase the feasibility of Started community engagement to understand the neighbourhoods increasing the number of neighbourhood market and to start building out a plan for the fall. markets in the city, looking at options to provide Next Steps: increased support for community-led markets To roll out a user friendly planning guide for residents. and the potential for a neighbourhood mobile farmers market. Jana Miller(519) 741-2200 ext. 7231 Office of the CAO OG07Customer Service Strategy - Phase 3 Status as of Aug 31st 2017: ON TRACK Dec-2017 Expected Completion: Description: Recent Progress: Focus on continuing to positively enhance the The scope of this project focused largely on the acquisition and customer service experience through creating implementation of the Customer Relationship Management (CRM) more convenient channels for customer platform. CRM has been acquired and implemented. access, improved tracking, monitoring and Escalation/complaints management policy and guidelines have been measuring of citizen requests. Scope includes introduced to staff and will be developed into staff training module. acquisition/implementation of new Customer Online complaints form was introduced in July and is being used by Relationship Management software, staff citizens. CRM training for early adopter divisions is complete. Plan to training on CRM, customization of its reporting, prioritize next divisions to be brought on to CRM being developed. and the development a standardized complaints Next Steps: escalation process for citizens. This objective is largely complete. Next steps are to go beyond scope of Phase 3 and initial CRM implementation to build needed integrations with other corporate software that will support the development of an online customer service portal. Discussions have begun with appropriate staff. Future work will also revitalize progress and focus on our E-Services Strategy. Status as of Aug 31st 2017: OG09Corporate-Wide Community Engagement Review COMPLETED Apr-2017 Expected Completion: Description: Recent Progress: Complete a comprehensive review of the city's engagement practices, processes and policies, identify gaps and implement improvements. Next Steps: IF1 - 6 Jana Miller(519) 741-2200 ext. 7231 Office of the CAO Status as of Aug 31st 2017: OG12Citizen-First Customer Service Culture ON TRACK Dec-2019 Expected Completion: Description: Recent Progress: Focus on building a citizen-first culture through Full corporate-wide review plan has been developed including draft the development of several foundational stakeholder list, draft questions, citizen engagement plan, full elements beginning with a comprehensive internal/external marketing campaign. Corporate Leadership Team corporate review looking at customer service approvals on all components expected by mid-September. Work with practices, protocols and philosophies to identify Human resources continues re: development of customer service gaps and opportunities for improvement. training. Leadership workshop session (150 leaders) on Customer Review to be followed by the development of Service planned for late October. tools, resources, revised service guidelines and Next Steps: customized customer service training to support Corporate-wide Customer Service review expected to launch first staff and further embed our customer service week of October. Internal launch followed by external to citizens. culture. Includes community engagement component in November. Leadership workshop on customer service, with 150+ leaders, planned for late October. Status as of Aug 31st 2017: OG15Community Engagement Policy ON TRACK Dec-2017 Expected Completion: Description: Recent Progress: Development of a Council policy for Community Draft policy has reviewed by key internal and external stakeholders Engagement that provides direction and (including Corporate Management Team), and modified to reflect guidance to ensure that responsibilities to feedback. effectively communicate, consult and engage Next Steps: the community are fulfilled. Circulate the final revised policy to internal stakeholders to communicate how feedback has been incorporated. Deliver it to Council. OG16Community Engagement Plans, Tools & Resources Status as of Aug 31st 2017: ON TRACK Dec-2018 Expected Completion: Description: Recent Progress: Development of community engagement plans, Engagement Consultant and Communications and Marketing staff tools, templates and resources to support staff have collaborated to develop a draft plan template for staff to use in in effectively informing and engaging citizens. planning engagement efforts. Next Steps: Testing and review of the draft community engagement plan template to determine if it is meeting the needs of staff and ensuring we meet our engagement promises. Clarifying the process for staff to initiate engagement. Development of various tools and templates for internal staff based on employee feedback and needs identified in the Corporate Community Engagement Review. SE04Corporate Climate Action Plan Status as of Aug 31st 2017: ON TRACK Aug-2018 Expected Completion: Description: Recent Progress: Develop a comprehensive Climate Action Plan The climate change vulnerability and risk assessment for all city for the organization that integrates both operations has been complete in draft and preliminary mitigation measures with adaptation strategies recommendations on priorities have been selected by the Steering that work synergistically to reduce vulnerability Committee and will be reviewed and confirmed by the Corporate to climate risks and greenhouse gas emissions. Leadership Team prior to going to Council. Next Steps: Consultation with staff on potential energy conservation and waste reduction strategies has begun and will continue into Oct/Nov. When the Corporate Sustainability Officer is hired in the next few months this position will take on a central role in moving this project forward into action. IF1 - 7 COMMUNITY SERVICES DEPARTMENT Michael May(519) 741-2200 ext. 7079 Administration - CSD Status as of Aug 31st 2017: NB01Neighbourhood Strategy COMPLETED Apr-2017 Expected Completion: Description: Recent Progress: Develop a comprehensive Neighbourhood Strategy focused on achieving two objectives: I. Helping the municipality, citizens and Next Steps: community groups coordinate efforts in planning, building and supporting safe and thriving neighbourhoods; and, II. Creating a framework to facilitate and support a citizen-led approach to placemaking in the city's neighbourhoods. NB15Neighbourhood Development Office Status as of Aug 31st 2017: COMPLETED Dec-2017 Expected Completion: Description: Recent Progress: Create a neighbourhood development office to The office is set up and staff have been hired. provide oversight and coordination of neighbourhood action plans. Next Steps: Mike Seiling(519) 741-2200 ext. 7669 Building Status as of Aug 31st 2017: CS55AMANDA 7 and Public Portal Review ON TRACK Dec-2018 Expected Completion: Description: Recent Progress: The AMANDA software system requires a Council approved the updated public portal in Spring 2017. significant upgrade; AMANDA 7. Prior to implementation, testing of scripts and set-up of Next Steps: security groups and reporting tools is Next steps, IT staff preparing the server for the new software. A necessary. The existing public portal is integral public portal launch meeting scheduled for the end of September to the core business. The project will include reviewing the existing public portal including other software options. Gloria MacNeil(519) 741-2200 ext. 7952 By-Law Enforcement CS03Responsible Pet Ownership Strategy Status as of Aug 31st 2017: ON TRACK Dec-2017 Expected Completion: Description: Recent Progress: Work in conjunction with City of Waterloo and Working with the Humane Society some initiatives have been KW Humane Society to development a series identified for investigation. of actions to encourage responsible pet Next Steps: ownership. As part of the discussion with the Humane Society, we have included some funding as well as strategies to help put towards the Responsible Pet Ownership Strategy. IF1 - 8 Gloria MacNeil(519) 741-2200 ext. 7952 By-Law Enforcement Status as of Aug 31st 2017: CS20Property Standards Compliance Review and Proactive DELAYED By-law Enforcement Dec-2017 Expected Completion: Description: Recent Progress: Review existing property standards by-law and Report with proposed changes approved by Council in June. related initiatives to promote voluntary compliance and reduce reliance on traditional Next Steps: enforcement methods. Bylaw is drafted, will be reviewed by Legal and scheduled for Council in September. Staff level review currently underway to determine what pro-active enforcement may look like and how such a program may impact current processes. The end date for this project has been delayed from August 2017 to December 2017. CS52Shopping Cart Management Plan Bylaw Status as of Aug 31st 2017: COMPLETED Apr-2017 Expected Completion: Description: Recent Progress: Investigate options to require any business that provide shopping carts to its customers to have Next Steps: would set out demonstrable measures to prevent the unauthorized removal of shopping retrieval of abandoned carts. Status as of Aug 31st 2017: CS53Negotiation of Animal Control Services Contract ON TRACK Dec-2017 Expected Completion: Description: Recent Progress: Investigate options available for animal control Legal and Enforcement staff received approval from Council to move services and licensing. Current contract ends forward with a report to Council. Dec 2017. Next Steps: Report going to Committee in September with details of the newly negotiated contract. Status as of Aug 31st 2017: CS56Administrative Monetary Penalties Strategy (AMPS) ON TRACK Apr-2018 Expected Completion: Description: Recent Progress: Research and development of removing the The three municipalities have met to discuss process, finances and parking ticket process from the Regional Court allocated funding for research related to the project. House and implementing an internal process Next Steps: that could be shared with Waterloo and Waterloo is currently going through the selection process. Currently Cambridge. exploring various avenues for service delivery of a potential program. Mark Hildebrand(519) 741-2200 ext. 7687 Community Programs & Services CS33Kiwanis Park Pool Renovation Status as of Aug 31st 2017: ON TRACK Dec-2017 Expected Completion: Description: Recent Progress: The revitalization of the Kiwanis Park Outdoor The call for tenders is complete and distributed. The construction site Pool, includes the redesign of the pool in its has been secured by Melloul Blamey. The project is underway. existing footprint, as well as all associated Progress has been made on all aspects of the build. An 8 day loss to systems (filtration pumps, filters, UV the project occurred with a significant flood to the site. Restoration of disinfection, piping/valves, chemical capacity & the site was done quickly and effectively. dosing system, heating systems) and Next Steps: incorporation of a future spray pad. Demolition of the pool basin is underway. New hydro service installation has commenced.F inal concrete pour is scheduled for early September. IF1 - 9 Mark Hildebrand(519) 741-2200 ext. 7687 Community Programs & Services Status as of Aug 31st 2017: NB14Huron Woods Community Centre Partnership ON TRACK Dec-2017 Expected Completion: Description: Recent Progress: Explore the potential for a partnership with the Reviewed and eliminated possible partnership opportunity with the school board for the development of a Catholic District School Board - site will not accommodate. community centre in the Huron Woods Next Steps: neighbourhood. Discuss possibility of developing conceptual plans for a joint school/community center with the WRDSB. NB42Doon Pioneer Park Community Centre Expansion - Status as of Aug 31st 2017: ON TRACK Design & Construction Dec-2018 Expected Completion: Description: Recent Progress: Upon completion of the Business Case, an Schematic Design completed. Project is currently on time and on architect will be sourced and acquired to design budget. and build the expansion. Next Steps: Design development next stage of the plan. NB44Community Centre Audit Implementation Status as of Aug 31st 2017: ON TRACK Dec-2019 Expected Completion: Description: Recent Progress: The community centre section went through a New manager hired and initial orientation completed. Sectional goals significant audit with immediate, short-term, mid- and objectives have been developed and priorities assigned for 2017. term and long-term recommendations. Review 12 of 49 recommendations completed. and implementation of these recommendations Next Steps: will consist of a substantial body of work. Hiring of a new supervisor to review sectional goals, sectional mandate, divisional visioning exercise and risk assessment of specific remaining recommendations from Report 2. 19 of 49 recommendations in progress. Jon Rehill(519) 741-2200 ext. 5500 Fire CS06Five-Year Fire Master Plan Status as of Aug 31st 2017: COMPLETED Apr-2017 Expected Completion: Description: Recent Progress: Develop a five year road map for the Fire Department to meet the needs and circumstances of the community, Council and Next Steps: staff. CS24Regional Emergency Communications Centre Status as of Aug 31st 2017: ON TRACK Dec-2019 Expected Completion: Description: Recent Progress: Incorporate the recommendations from the Contract with Intergraph Computer-Aided Dispatch (CAD) has been regional emergency communications centre signed with Waterloo Regional Police Services (WRPS). Police report. Regionalized Information Data Entry (PRIDE) network agreement with WRPS has been reviewed and agreed upon in principal. Dialogue continues with the Ministry of Health and long-term Care (MHLTC) regarding simultaneous notification. Next Steps: Integraph CAD project plan will be initiated in the next quarter. Project team will be established to ensure CAD implementation by end of 2018. IF1 - 10 Alain Pinard(519) 741-2200 ext. 7319 Planning Status as of Aug 31st 2017: NB07Residential Intensification in Established COMPLETED Neighbourhoods Study Aug-2017 Expected Completion: Description: Recent Progress: There are increasing growth and intensification The Study is approved by Council. pressures in many of our neighbourhoods. Conduct a study that investigates the issue, Next Steps: provides options and recommends updates to residential zoning, design guidelines, the development process and community engagement. The deliverables of the study would include a Citizen Guide to Intensification. NB08PARTS Midtown RT Station Area Plan Status as of Aug 31st 2017: DELAYED Dec-2017 Expected Completion: Description: Recent Progress: Undertake all components required to complete Reviewing and improving the final plan and technical components. development scenarios, technical analysis, preferred option, community engagement and Next Steps: recommendations for the Midtown Station area. Final Plan to October Planning and Strategic Initiatives Committee (PSIC). The end date for this project has been delayed from August 2017 to December 2017. NB09PARTS Rockway RT Station Area Plan Status as of Aug 31st 2017: ON TRACK Dec-2017 Expected Completion: Description: Recent Progress: Undertake all components required to complete Reviewing and improving the final Plan and technical components. development scenarios, technical analysis, preferred option, community engagement and Next Steps: recommendations for the Rockway Station area. Final Plan will be presented at October Planning and Strategic Initiatives Committee (PSIC). Status as of Aug 31st 2017: NB11Comprehensive Zoning By-law Review ON TRACK Aug-2018 Expected Completion: Description: Recent Progress: Undertake a multi-phase, comprehensive The final component (residential) was completed ahead of schedule review of the City's Zoning By-law 85-1 to and released in May 2017 for public review. implement the new Official Plan and other Next Steps: required changes. Responses to first draft comments. Council Strategy Session in November 2017. NB13Sustainable Development Feasibility Study Status as of Aug 31st 2017: ON TRACK Apr-2018 Expected Completion: Description: Recent Progress: Working with partner organizations, under the Project team meetings underway. Site walk of case study in London Federation of Canadian Municipalities (FCM) complete. Phase 1 work well underway and outline of full study Green Municipal Funds program, undertake a prepared. feasibility study to help inform sustainable Next Steps: development practices at a site or Start up of Kitchener case studies sites in Fall 2017 as part of Phase neighbourhood scale. The emphasis is to be 2. on energy sustainability. IF1 - 11 Alain Pinard(519) 741-2200 ext. 7319 Planning Status as of Aug 31st 2017: NB16Development Incentives for Affordable Housing - Phase COMPLETED 2 Apr-2017 Expected Completion: Description: Recent Progress: A detailed analysis in consultation with affected Report recommendations and new Policies approved. Incentives are business units, the Region and the industry in now in effect. order to provide an implementation plan to help Next Steps: deliver development incentives for affordable (rental) housing. The primary focus is on reduced parking requirements, property tax exemptions or grants, and expanded density bonusing. Secondary effort will be on waiving or deferring certain application fees. NB20Community Energy Investment Strategy Status as of Aug 31st 2017: ON TRACK Dec-2018 Expected Completion: Description: Recent Progress: As a supporting partner with the Region of Strategy outline prepared, including draft actions. Project committee Waterloo, local municipalities and utility undertaking all tasks. companies, explore opportunities for energy Next Steps: efficiency, optimization of local energy Draft strategy to be considered at Advisory Committees in Fall 2017. resources and reduction of environmental impact related to energy. The resulting region- wide strategy will set a path to improve how energy is generated, delivered and used throughout the community. Status as of Aug 31st 2017: NB21Hidden Valley Land Use Study ON TRACK Apr-2019 Expected Completion: Description: Recent Progress: To develop a Master/Community Plan for the Flow Monitoring, Model Recalibration and Continuous Simulation Hidden Valley area that would be implemented work underway over the summer. by way of amendments to the Official Plan and Next Steps: Zoning By-law. This project would be Future actions and meetings on the land use review to be scheduled. integrated with a servicing study for the area that will be led by Engineering. The study will also identify any public interest in the hidden valley lands including opportunities to protect and/or acquire natural features and sensitive lands. Status as of Aug 31st 2017: NB22Cultural Heritage Landscape Strategy Phase 2 ON TRACK Apr-2019 Expected Completion: Description: Recent Progress: Consult with Heritage Kitchener in order to Work plan for integration of this with other ongoing planning initiatives prioritize the implementation of conservation and neighbourhood engagement. tools for the cultural heritage landscapes Next Steps: identified in Phase 1 which include the listing of Community engagement planned for different neighbourhoods locations on the municipal heritage register, beginning Fall/Winter 2017. identifying specific cultural heritage landscapes in the Official Plan, and developing new/enhanced guidelines and best practices. IF1 - 12 Alain Pinard(519) 741-2200 ext. 7319 Planning Status as of Aug 31st 2017: NB26Urban Design Manual ON TRACK Dec-2019 Expected Completion: Description: Recent Progress: Undertake a full review of the urban design Working team underway on several tasks. Early draft content of some manual to implement the new Official Plan, sections prepared and being reviewed. make the document more efficient and Next Steps: effective, complement specific design briefs etc. Future stakeholder engagement. Status as of Aug 31st 2017: NB43Heritage Best Practices Implementation ON TRACK Aug-2018 Expected Completion: Description: Recent Progress: In follow up to Report CSD-15-08 which Completed Emergency Management Protocol; establishment of recommended the development of a variety of Heritage Kitchener Designation and Promotion Sub-Committees; best practices regarding the conservation of Heritage Monitoring Checklist (with Facilities Management) and cultural heritage resources. reviewed priority properties for designation. Next Steps: Completion of Heritage Procedural Protocol. Undertaking a Conservation Plan for a City-owned heritage resource (in Bridgeport). Kim Kugler(519) 741-2200 ext. 7544 Sport CS04KMAC: Long-Term Planning for the Future Status as of Aug 31st 2017: ON TRACK Dec-2017 Expected Completion: Description: Recent Progress: Seek Council approval of the planning Framework was reviewed by the Corporate Recreation and Leisure framework for replacement of the Auditorium in Steering Committee (CRLSC). 15-20 years. (LFMPU Rec #35) Next Steps: Report for Council by end of 2017. CS57Installation of Active Net Recreation Management Status as of Aug 31st 2017: ON TRACK Software Dec-2017 Expected Completion: Description: Recent Progress: Implementation and roll out of a new web based Training was rolled out to all staff May 2017. ACTIVE Net went live system across the corporation that will meet June 5, 2017.M ass pool registrations rolled August 15 and mass recreation and sports management community program registrations were rolled out August 22. Active requirements, facility rental activity and Net Training was added to Calendar. participant management as well as provide Next Steps: point of sale options, as part of a joint initiative Evaluate Active Net successes and areas of improvement to with the City of Waterloo, City of Cambridge, determine the focus for improvement by November 1, 2017. Township of Wilmot and Township of Wellesley. EC05Sport Tourism Status as of Aug 31st 2017: ON TRACK Dec-2017 Expected Completion: Description: Recent Progress: Work with minor sport organizations and the Debriefed the final results of the bid and identify next steps for the Waterloo Regional Tourism Marketing Regional Sport Tourism Office (RSTO) and Regional Tourism Office - Corporation to attract provincial/national District 4 (RTO4). A facilitated session was held to determine the next championship events at city facilities. steps for a regional tourism entity. Next Steps: Identify roles and responsibilities for each municipality with the RTO4 and Waterloo Regional Tourism Marketing Corporation (WRMTC). Approve interim role and responsibilities of Sport Hosting Office. IF1 - 13 FINANCE AND CORPORATE SERVICES DEPARTMENT Brenda Johnson(519) 741-2200 ext. 7647 Accounting Status as of Aug 31st 2017: CS15Internal Order Process Improvement ON HOLD TBD Expected Completion: Description: Recent Progress: Create efficiencies in SAP for asset accounting Some system attributes have been implemented including: new processes, capital reporting processes by: General Ledger (GL) code mapping on settlements, budgeted and implementing a new internal order settlement actual amounts appearing in same GL. Child internal orders now process; implement a "locking" process for settle nightly to their parent order, eliminating over 90% of the orders orders and use the newly purchased Business in use. Intelligence software to move financial reporting Next Steps: from SAP reports to a more user friendly Implement archiving strategy, and other system attributes. Investigate approach. interfaces between CityWorks and Fleet work order systems with SAP to provide more information between systems. This project is On Hold as timing of IT and SAP resources required cannot be determined at this time. Status as of Aug 31st 2017: CS16Financial Reporting Improvement Project ON TRACK Dec-2017 Expected Completion: Description: Recent Progress: Implement CaseWare to improve efficiency of Continued to implement processes developed to date to ensure producing the Financial Information Return, efficient accounting for the City's tangible capital assets and smoother which is an annual legislated requirement for completion of draft financial statements. the province. Continue with data collection Next Steps: efficiencies related to the City's tangible capital Continue to consult with key staff to modify processes to ensure assets (additions and disposals). Improve budgeting and accounting is streamlined, to reduce duplicate data internal process for budgeting, transfers for analysis and manipulation. Continue ongoing review of processes to reserves, debt, etc. to gain efficiencies in year- develop additional efficiencies. end reporting. Status as of Aug 31st 2017: CS34Payment Process Improvements and Electronic Funds ON TRACK Transfer (EFT) Payments Dec-2018 Expected Completion: Description: Recent Progress: Review city-wide internal processes to Converted over 50% of weekly payments to EFT and planned next streamline procurement activity and payment to phase of vendor EFT for fall 2017. vendors. Investigate the opportunity to Next Steps: implement more EFT payments to vendors. Investigate automation of corporate credit card processing with US Bank. Encourage staff to use payment card when possible in order to streamline payments. Investigate other municipalities' SAP approval processes. Update business processes for EFT. Add all remaining vendors to EFT. Investigate improvements and ways to streamline procurement/payment processes; this requires changes to SAP and processes and cannot be incorporated into SAP roadmap for 2017. CS35Accounting Comprehensive Service Review Action Plan Status as of Aug 31st 2017: ON TRACK and Implementation Dec-2017 Expected Completion: Description: Recent Progress: Develop and implement an action plan to Of the 69 recommendations, over 50% completed including audit respond to Accounting comprehensive review process improvements, SAP security improvements, payroll process key findings and recommendations. efficiencies and procedures documentation. Next Steps: Bank reconciliation project underway which addresses many recommendations. Other projects such as electronic imaging and PO- related SAP requirements planned for 2018. IF1 - 14 Ryan Hagey(519) 741-2200 ext. 7353 Financial Planning Status as of Aug 31st 2017: CS09Long Term Financial Plan DELAYED Aug-2018 Expected Completion: Description: Recent Progress: Prepare a consolidated long term financial plan Evaluated other municipal long term financial plan examples for ideas that will be the financial framework for the City and practices. Drafted high level framework for Kitchener's plan. going forward. The framework will incorporate Completed Council consultation. policy work pertaining to reserves, debt, and Next Steps: enterprise investments. Draft recommendations for principles, policies and performance measures based on best practice review, municipal comparison and Council interviews. The end date for this project has been delayed from December 2017 to August 2018. OG10Participatory Budgeting Status as of Aug 31st 2017: ON TRACK Dec-2019 Expected Completion: Description: Recent Progress: Enable community members to directly decide Presented Participatory Budgeting research at Council Strategic how to spend part of the city's budget, allowing Session and received Council direction on pilot projects. them to make budget decisions that affect their Next Steps: lives. Continue working with University of Waterloo partners to plan and deliver participatory budgeting engagement with relevant communities related to the two pilot park sites (Sandhills Park and Elmsdale Park). Michael Goldrup(519) 741-2200 ext. 7117 Human Resources Status as of Aug 31st 2017: CS10Implement GHS Classification and Labelling of ON TRACK Chemicals Dec-2017 Expected Completion: Description: Recent Progress: GHS is a system that defines and classifies the Legislative changes came into effect July 1, 2016 with 2-year hazards of chemical products, and implementation period; all changes must be implemented by communicates health and safety information on December 1, 2018. Final report regarding Workplace Hazardous labels and material safety data sheets (called Materials Information System (WHMIS) presented to senior Safety Data Sheets, or SDSs, in GHS). The management, with recommendations and required actions to improve goal is that the same set of rules for classifying current program for compliance. Reviewed and updated corporate hazards, and the same format and content for safety manual WHMIS and Hazardous Materials guideline and labels and safety data sheets (SDS) will be created safety talk tool for job-specific WHMIS review. Commenced adopted, and used around the world. divisional migration of manual material safety data sheet tracking to online tool. Communicated training needs to all departments and commenced updated training, with over 50% of staff completing training to date. Next Steps: Continued implementation of updated learning through to end of year. Continued migration of manual processes into online systems ongoing as work area needs align with the system. IF1 - 15 Michael Goldrup(519) 741-2200 ext. 7117 Human Resources Status as of Aug 31st 2017: CS25Implement First Phase of Corporate Talent Strategy ON TRACK Dec-2019 Expected Completion: Description: Recent Progress: In phases, to review and redesign across HR Aligned core values to CapaCITY catalogue. Began needs programing including performance assessment and best practice research for Learning Management management, succession planning and System/online learning. Implemented Hiring@Kitchener K-Hub recruiting. resource for hiring managers. Launched new mentor program resources. Completed corporate recognition program communications plan. Commenced next phase of recruiting process review and implemented improvements and tools from previous recruiting reviews. Created succession planning program process flows. Developed PeopleSoft PEAK online training program content. Implemented HR management orientation online training course for new management. Next Steps: Obtain senior management feedback on PEAK and potential employee groups to participate in program. Finalize remaining items from earlier recruiting process review. Finalize Learning Management System research and business case. Implement second 360 feedback process for Leading@Kitchener leadership development program. Communicate recognition program communications plan to corporate leadership team. Finalize and launch PEAK PeopleSoft online training course. Dan Murray(519) 741-2200 ext. 7825 Information Technology CS11Corporate Technology Strategic Plan & Digital Strategy Status as of Aug 31st 2017: COMPLETED Apr-2017 Expected Completion: Description: Recent Progress: Set clear priority areas for the further development of Information Technology services to continue to meet the evolving needs Next Steps: of the organization. The development of a broader community digital strategy will be considered as a component or as a distinct strategy. CS36Server Systems Failover Capability Status as of Aug 31st 2017: ON TRACK Apr-2018 Expected Completion: Description: Recent Progress: Accelerate the installation of required Upgraded wide area network between City Hall and Kitchener equipment to provide comprehensive server Operations Facility (KOF). Completed upgrade of network equipment backup capability at the Kitchener Operations at City Hall and KOF computer rooms. Installed network failover Facility to allow for business continuity in the components and Wi-Fi network failover. Procured and installed server event a loss of operations at the City Hall hardware. computer room. This installation will respond to Next Steps: one of the major recommendations from the Complete configuration of server systems in progress. Final testing of business continuity project. network failover and data replications process. Following testing, specific applications for server failover will be enabled and tested individually. Document failover processes. Move the Failover system to KOF IF1 - 16 Dan Murray(519) 741-2200 ext. 7825 Information Technology Status as of Aug 31st 2017: CS62Development of Public Internet Access Standard ON TRACK Apr-2018 Expected Completion: Description: Recent Progress: Digital Kitchener outlined the development of a Began developing understanding of current state of digital Public Internet Access Standard as part of the inclusion/exclusion to help guide standard development. Initial Inclusive theme. This project will include meetings with stakeholders held to explore public access standard working with community partners to define what concept/options. Research underway into best practices and resulting attributes would constitute public access and outcomes in other countries. then using that definition, developing a Next Steps: minimum standard of free public Internet Develop outreach process to benchmark what a public Internet access to be adopted by the City. This access standard should look like. Determine scope, clarify purpose minimum standard can then be used to direct and share findings with stakeholders for feedback. Determine future investments for public access terminals timelines and potential costs. Identify a standard and bring to Council or free Wi-Fi in future projects. for consideration. Status as of Aug 31st 2017: CS63Narrowband Smart City/Internet of Things (IoT) ON TRACK Network Development Apr-2018 Expected Completion: Description: Recent Progress: As part of the LED street light replacement Finalized with vendor the list of sites where narrowband Internet of program a narrowband network to enable smart Things (IoT) network will connect to City's corporate network, in order city capabilities has been procured. Prior to the to provide required capacity and speed. Identified sites where lights being retrofitted in 2017, IT staff will work narrowband access points will be installed. with the vendor to design the network, provision Next Steps: network connection points and to provision Continue working with vendor and internal stakeholders to gather network security. As the LED street lights are requirements for streetlight control system. Install new lights late deployed and the narrowband network begins summer/early fall. Complete network infrastructure upgrades required to take shape, IT will optimize the network and to connect the streetlights to the corporate network. develop a solid understanding of the potential uses while ensuring proper security is maintained. Status as of Aug 31st 2017: CS64Civic Innovation Lab at Communitech ON TRACK Dec-2020 Expected Completion: Description: Recent Progress: The establishment of a Civic Innovation Lab is a Lab Director recruited and onboarding underway. Process to recruit significant initiative in support of the Digital co-op students started. Kitchener strategy. The lab will operate as a Next Steps: pilot project for 3 years and focus on developing Complete development of lab space and hold grand opening event innovative solutions where Internet of Things being planned in the fall. Development of potential project list and (IoT) can help solve municipal challenges. prioritization framework to determine which projects will go forward. Work to establish the lab will begin in 2017 pending project and budget approval by Council with the intent of having a fully operational lab by the end of the year located at Communitech. IF1 - 17 Dan Murray(519) 741-2200 ext. 7825 Information Technology Status as of Aug 31st 2017: CS65 ON TRACK Dec-2021 Expected Completion: Description: Recent Progress: Digital Kitchener, a four year digital strategy Work underway for all the initiatives identified in the 2017 brave plan. approved by Council in 2017, is a vision to Digital Kitchener has won two awards on a provincial level in 2017 make Kitchener more Connected, Innovative, and has received positive media attention through the City's On-Demand and Inclusive. A number of marketing and outreach efforts. initiatives will be identified on an annual basis Next Steps: that fulfill the action steps outlined in Digital Work will continue on each of the initiatives in the Brave Plan for Kitchener and help realize the vision. Staff will 2017. Prepare progress report and proposed annual plan, and report back to Council on the progress of the present to Council in early 2018 for direction. plan annually. Ongoing communications and marketing of Digital Kitchener and its supporting initiatives will need to continue. EC06Canada 150 Wi-Fi Expansion Status as of Aug 31st 2017: COMPLETED Aug-2017 Expected Completion: Description: Recent Progress: Expand the City's Wi-Fi network through Kitchener Auditorium site implemented and live. Site surveys, funding secured through Canada 150 program planning and design completed for Victoria Park, McLennan Park and for additional installations at the Kitchener remaining arenas. Wi-Fi installed at all locations as per the project Memorial Auditorium, Victoria Park, Victoria plan. Park Pavilion, McLennan Park and other public Next Steps: spaces subject to commitment of the City's matching funds. Work will begin in July 2016 and complete in June 2017 as per Canada 150 program requirements. EC07Broadband & Fibre Optic Infrastructure Status as of Aug 31st 2017: ON TRACK Dec-2018 Expected Completion: Description: Recent Progress: Work collaboratively with stakeholders to Undertook efforts to help local decision makers understand explore options to either encourage third party importance of fibre investment to local economy, and benefits of fibre optic investment in Kitchener or partner Southwestern Integrated Fibre Technology network (SWIFT). with others to provide improved high-speed Generated support at the Regional level to support the SWIFT broadband infrastructure for Kitchener. High project; Region signed on to SWIFT with $2.2M of financial support. speed internet access is increasingly viewed as Next Steps: essential infrastructure for a globally Remain connected to SWIFT network developments, and advocate competitive economy. for the City/Region to be one of the areas chosen for initial investment. IF1 - 18 Christine Tarling(519) 741-2200 ext. 7809 Legislated Services Status as of Aug 31st 2017: CS18Electronic Agenda Management ON TRACK Aug-2018 Expected Completion: Description: Recent Progress: Create, prepare, approve and publish meeting Tested three hardware options for electronic minute taking. Ordered agendas in a more efficient, collaborative, permanent hardware solution for electronic minute taking. Reviewed streamlined manner. pre-meeting procedures relating to minute preparation. Continued to review and refine usability of Corporate reports pending listing. Met with internal stakeholders to identify procedures and roll-out for electronic reports and minutes linking. Next Steps: Implement proposed enhancements to in-house agenda management system including: reduced duplication of online agenda material, and interconnect reports, minutes and video. Complete testing of hardware options to facilitate electronic minute-taking. Continue to investigate potential implementation of a third-party application; report back to Corporate Leadership Team later in 2017 or early 2018. Status as of Aug 31st 2017: CS19Electronic Document Management ON TRACK Dec-2017 Expected Completion: Description: Recent Progress: Research and evaluate the potential Received vendor demonstration of Laserfiche Records Management procurement and implementation of an and Webforms to obtain improve understanding of modules. electronic document management system to Researched other organizations' deployment strategy for Laserfiche better manage the City's electronic information Webforms. Began introducing Laserfiche Webforms to various staff assets in accordance with applicable groups and discussed potential applications. Developed criteria to legislation. prioritize conversion or development of City forms using Laserfiche Webforms. Next Steps: Install Laserfiche Records Management module and Laserfiche Webforms and begin implementation with HR employee start form. Develop and provide staff training for this initial implementation. Status as of Aug 31st 2017: CS31Comprehensive Review of Business Licensing ON TRACK Dec-2018 Expected Completion: Description: Recent Progress: Undertake a full review of business licensing Ongoing stakeholder engagement completed through one-on-one processes for greater customer focus, better meetings. Presentations to internal staff about direction and use of existing technologies and to implement collection of feedback. Report drafted for staff review and comment. industry best practices. Review and update Next Steps: licensing by-law to provide greater clarity, and Report and bylaw will be presented to Corporate Leadership Team review and update fees. Improve relationships (CLT) in early October and to Council at the end of October. Following and integration with internal partners, and cross- the outcome of Council, implement new licensing program to coincide train staff for improved service provision and with implementing online business licensing, and revising associated personal development. bylaws and processes. Status as of Aug 31st 2017: CS37Online Business Licensing ON TRACK Dec-2018 Expected Completion: Description: Recent Progress: Implement the first phase of online business Identified requirements, designed each online folder outlining what licensing (e.g., pilot with business license details and changes are required. Met with internal stakeholders to renewals). present changes to internal system and online platform. Next Steps: Develop a communication plan to advertise and educate internal/external customers on the changes to the online system. Finalize online folders, work with Accounting to enable online payments, and create an implementation plan. IF1 - 19 Christine Tarling(519) 741-2200 ext. 7809 Legislated Services Status as of Aug 31st 2017: CS402018 Election ON TRACK Apr-2019 Expected Completion: Description: Recent Progress: Conduct the 2018 election and report on the Reviewed amendments to the Municipal Elections Act. Identified gaps outcome. in policies and procedures, and began to address gaps. Work underway to create communications plan, discuss with school boards declaring Election Day a PA/PD Day, and work with school boards on logistical arrangements. Began development of voting locations, establishing advance poll days, procuring voting tabulators, and revising forms and information for candidates. Next Steps: Review amendments to the Municipal Elections Act. Develop communications plan, and content for website and other social media channels. Develop election day and advance poll locations and undertake inspections. Procure tabulators, laptops, barcode scanners and other supplies. Develop AODA (Accessibility for Ontarians with Disabilities Act) plan. Hire election workers and provide training. Arrange printing of ballots, voter notification cards and mail. Status as of Aug 31st 2017: OG05Open By Default Strategy Implementation ON TRACK Dec-2017 Expected Completion: Description: Recent Progress: To help advance the Open Government Reviewed feedback from City staff regarding Routine initiative to increase transparency by developing disclosure/Active dissemination and Personal Information Bank lists. and implementing systems, training and Ensured lists are AODA (Accessibility for Ontarians with Disabilities procedures (including routine disclosure and Act) compliant in preparation for publication. Conducted training for active dissemination processes) to instill the staff who will administer these programs. operational principle that City data and Next Steps: information should be made available to the Finalize Routine disclosure/Active dissemination and Personal public subject to legislative and legal constraints. Information Bank lists of City divisions. Publish lists in City of Kitchener website. Michelle Palmer(519) 741-2200 ext. 7214 Supply Services CS17Purchasing Audit Action Plan and Implementation Status as of Aug 31st 2017: ON TRACK Dec-2017 Expected Completion: Description: Recent Progress: Develop and implement an action plan to Completed implementation of actions related to improving the team respond to the Purchasing comprehensive culture. Targets have been identified for the key results indicators. internal audit key findings and Reviewed and developed improved future state processes for 30% of recommendations. purchasing processes. Next Steps: Continued communication of the divisional mandate with internal business partners. Process and tool review will continue based on the prioritized list. IF1 - 20 Michelle Palmer(519) 741-2200 ext. 7214 Supply Services Status as of Aug 31st 2017: CS29Purchasing Bylaw Revision ON TRACK Dec-2017 Expected Completion: Description: Recent Progress: Update and revise the Purchasing Bylaw for Revised purchasing bylaw document drafted based on best practice enhanced clarity of policy and ease of and potential improvements from purchasing audit, process interpretation. improvement work, trade agreements,bylaws from comparator municipalities, and discussions with internal business partners. Next Steps: Present revised purchasing bylaw document to Finance and Corporate Services Committee in October. OG08E-Tendering Status as of Aug 31st 2017: DELAYED Dec-2018 Expected Completion: Description: Recent Progress: Implement an e-tendering module to enable Scoped the project into three phases to enable full implementation of vendors to self-identify for interested Phase 2: eContracts Management and Vendor Performance commodities, access bid documents and Management module. Phase 2 underway and to be completed fall drawings and submit tenders, proposals and 2017. quotations electronically. Next Steps: Finalize project plan for Phase 3: Online Bid Submission module, with planned start in fall 2017. The end date for this project has been delayed from December 2017 to December 2018. INFRASTRUCTURE SERVICES DEPARTMENT Hans Gross(519) 741-2200 ext. 7410 Engineering SE05Low Impact Development Design Guidelines - Status as of Aug 31st 2017: ON TRACK Stormwater Utility Dec-2018 Expected Completion: Description: Recent Progress: Low Impact Development (LID) is an approach Staff have been developing draft Standard Drawings and Standard to storm water management that mimics a site's Specifications for Road Reconstruction projects and are currently in natural hydrology as the landscape is circulation for review. Review of the stormwater section in the developed. Using the Low Impact Development Development Manual has begun to ensure consistency with the approach, storm water is managed on-site and recommendations of the Stormwater Management Master Plan. the rate and volume of storm water reaching Next Steps: receiving waters is unchanged from The upcoming changes from the Ministry of the Environment and predevelopment levels. These guidelines will be Climate Change via an Environmental Bill of Rights posting will be integrated into the existing Development reviewed to ensure the proposed LID Design Guidelines in Kitchener Manual. align with the recommended Province-wide approach. Lynda Stewart(519) 741-2600 ext. 4215 Facilities Management Status as of Aug 31st 2017: EC21City Hall Outdoor Spaces Implementation Plan ON TRACK Dec-2017 Expected Completion: Description: Recent Progress: Develop a funding and implementation plan to A functional design was presented to the project team in August address critical infrastructure repairs for the City 2017. This included sketch renderings and views. Hall outdoor spaces and concurrent work to Next Steps: improve the functionality of Carl Zehr Square The results of the functional design will be completed and presented for public events programming. to Council in late 2017. IF1 - 21 Denise McGoldrick(519) 741-2600 ext. 4657 Operations - Environmental Services Status as of Aug 31st 2017: CS59Parkland Dedication Policy Update ON TRACK Dec-2018 Expected Completion: Description: Recent Progress: Comprehensive review and update of the A draft by-law has been completed. current Parkland Dedication Policy related to acquiring parkland (or cash-in-lieu payment) Next Steps: through development applications. A discussion paper will be drafted to include best practices and desired direction of park dedication policies. Council will be notified of the project and update prior to consultation with Committees of Council and community stakeholders in the 4th quarter of 2017. NB03Community Gardens Program Status as of Aug 31st 2017: DELAYED Dec-2017 Expected Completion: Description: Recent Progress: Explore opportunities to accelerate/increase the Work continued to explore process updates and a community community garden program. Consideration will workshop was held in August to obtain feedback on draft documents be given to support and supplies required for such as roles and responsibilities, grant policy, and Step by Step the success of the program on an ongoing approach for establishing a new garden on city lands. A survey on basis. Work will be coordinated with the Engage Kitchener was also launched and an update was provided to comprehensive zoning by-law review to ensure Council via email. appropriate zoning provisions are in place. Next Steps: Work will consist of incorporating community garden survey results and fine-tuning the proposed program and supporting documents where needed. A staff report will be presented to Council in the fall with a summary of the proposed approach including a revised grant policy. The end date for this project has been delayed from August 2017 to December 2017. NB04Grand River Park - Phase 1 Status as of Aug 31st 2017: ON TRACK Dec-2017 Expected Completion: Description: Recent Progress: This project will include the establishment of The project team had discussions with Region of Waterloo and Grand criteria, the evaluation of potential lands, the River Conservation Authority (GRCA) staff to understand each prioritization of natural space land acquisition agency's interest in the lands as well as future plans. A review was opportunities, and the development of a vision, completed regarding what type of park amenities might be possible including: potential park programming and cost based on numerous constraints such as floodplain and source estimates in order to inform future capital protection policies, etc. budget forecasts. Phase 1 includes the Next Steps: acquisition of the site. The development of a Key events planned include: Corporate Leadership Team (CLT) report master plan will begin when Phase 1 is for review/input. Based on CLT's input, the project team will move completed. forward on the draft acquisition approach. NB05Public Interest In Hidden Valley Status as of Aug 31st 2017: CANCELLED Aug-2017 Expected Completion: Description: Recent Progress: The core natural features within Hidden Valley area are protected from development while the surrounding farmland is designated for Next Steps: development. Acquiring and protecting both the ** NOTE: As a result of interdependencies and potential overlap, the natural features and the farmland serves objectives for this project have been integrated into NB21 Hidden community interests but comes at a cost. Valley Land Use Study being led by the Planning Division and all Discussing options with property owners will future progress will be reported through that project. That study will inform analysis of costs and benefits to inform identify any public interest in the Hidden Valley lands including the City's decision-making and budgeting. opportunities to protect and/or acquire natural features and sensitive lands. IF1 - 22 Denise McGoldrick(519) 741-2600 ext. 4657 Operations - Environmental Services Status as of Aug 31st 2017: NB10Upper Canada District Park Master Plan - Priority 1 ON TRACK Dec-2018 Expected Completion: Description: Recent Progress: The re-alignment, consolidation and Detail design has been completed, including completion of a improvement of the Southwest Optimist construction tender. The tender has closed on August 15, 2017, Sportsfield baseball diamonds including reviewed by staff and will be brought to council for award on supporting infrastructure as identified in the September 25, 2017. approved Upper Canada District masterplan. Next Steps: Park Opening: Summer 2018. Diamond Construction scheduling and coordination will begin following project Opening: Spring 2019 award targeted for September 25/17. NB17Doon Pioneer Park Skate Park Status as of Aug 31st 2017: ON TRACK Dec-2018 Expected Completion: Description: Recent Progress: The development of the Doon Pioneer Park Following council approval, the Upper Canada Park construction Skate Park will be completed through this tender was released and is on track to be presented to council for project. The Leisure Facilities Master Plan award in September 2017. Once this tender is awarded, the new recommended that additional skateboard Request for Proposal for the Doon Pioneer Skatepark will be facilities be developed in Kitchener in an effort advertised in the fall of 2017. to expand on the continued success at that time Next Steps: of the Aud Skatepark, and to address the Preliminary design of the skate park will begin in the fall of 2017. It is growing need for opportunities in skateboarding. anticipated that public and user group consultation will begin in the winter of 2018. Status as of Aug 31st 2017: NB19Implement the South Kitchener District Park Master ON TRACK Plan Phase 1 Dec-2018 Expected Completion: Description: Recent Progress: Phase 1 of the development of the South The site layout has been completed and reviewed with key Kitchener District Park will include the stakeholders. Detailed site servicing design is approximately 70% development of the sports fields, complete. Archaeological clearance has also been granted by the playground/splash pad, stormwater Ministry. A Phase 2 Environmental Site Assessment has been management features, grading and site initiated. A grading tender was prepared and has been advertised. servicing, roads and parking. Next Steps: Final submission of site design documentation to acquire City Departmental approvals will be completed. The Phase 2 Environmental Site Assessment will be completed. A Public Information Centre will be held in the fall to consult the public on the park amenities. The recommended tender award will be presented to Council in the fall in order to begin rough grading of the site and remediation works. Additional work will continue for the preparation of the tender for the next phase of construction. NB41Bee City Canada Initiative Status as of Aug 31st 2017: ON TRACK Dec-2017 Expected Completion: Description: Recent Progress: Investigate and report to the Environmental Background review initiated and writing of draft of report has Committee on the benefits and feasibility of commenced. Kitchener becoming a Bee City Canada affiliate Next Steps: and how such an affiliate coordinates with any A draft report will be completed and shared with the Environmental current and planned City initiatives to support Committee as well as the CISC Committee for review and comment. pollinators in Kitchener. IF1 - 23 Denise McGoldrick(519) 741-2600 ext. 4657 Operations - Environmental Services Status as of Aug 31st 2017: SE06Sustainable Urban Forest Management Program ON TRACK Dec-2018 Expected Completion: Description: Recent Progress: This project will initiate the development of a Over the summer staff completed the first phase of community Sustainable Urban Forest Program with the engagement which included direct contact with more than 1,500 creation of an urban forest strategic plan for community members at 42 public events. Kitchener's first sustainable public and private urban forest, and an asset urban forest report card was also completed. This report card management plan for trees on city lands. A compares Kitchener's existing reactive program with a sustainable sustainable program sets the course of action urban forest program. for a socially desirable urban forest that can Next Steps: also be achieved and maintained based on the In September the second phase of community engagement will begin true capacity of the city to manage resources. and include a number of events such as 2 community workshops, an Engage survey as well as a public talk at Kitchener Public Library. Additional discussions with stakeholders will also help to provide input on the draft vision, goals and priorities for the urban forest strategy. Council input interviews will also be scheduled this fall. Status as of Aug 31st 2017: SE07Iron Horse Trail Improvement Strategy (Priority A - DELAYED Central Section) Aug-2018 Expected Completion: Description: Recent Progress: Improvements to the central section (Victoria Detail design has been completed, including completion of a Street to Queen Street) of the Iron Horse Trail construction tender. The tender has closed on August 15, 2017, will include trail-road crossings, signage, however yielded no bids to award the work. seating & rest areas, trail width & surfacing, Next Steps: connectivity, amenities and landscaping. Project will be re-tendered in January 2018. The end date for this project has been delayed from December 2017 to August 2018. SE08Year-round Maintenance of Trails and Pathways Around Status as of Aug 31st 2017: ON TRACK Schools - Pilot Dec-2018 Expected Completion: Description: Recent Progress: Implement the pilot project to asphalt and winter Operating costs for first winter maintenance season of the trail were maintain trails around Glencairn Public School determined (continue tracking for 2017/18 winter season). and that staff monitor the use of these trails Next Steps: through two winter seasons. Continue to meet A trail count is planned to establish pre-winter trail usage data (gauge with neighbourhood associations on school usage trends). Analysis of pedestrian usage data derived from trail access routes and report back to council on the counts will be undertaken. Staff will conduct spatial analysis of trail finding of the pilot project and future direction. network surrounding school properties to understand citywide implications. Engagement of the neighbourhood association and school board to solicit input on pilot project is planned. Ken Carmichael(519) 741-2200 ext. 7372 Transportation Services CS07Parking Business Plan Review Status as of Aug 31st 2017: DELAYED Dec-2017 Expected Completion: Description: Recent Progress: Review fee structure, occupancy rates and Final draft of the mid-term parking solutions for Downtown Kitchener overall development strategies for the Parking was received from consultants for internal review in May. After the Enterprise. internal review, staff met with the consultant requesting a number of changes and a re-write. A new report is due from the consultant in September. Next Steps: Project is expected to be complete by December 2017. The end date for this project has been delayed from August 2017 to December 2017. IF1 - 24 Ken Carmichael(519) 741-2200 ext. 7372 Transportation Services Status as of Aug 31st 2017: CS54Parking Payment Technologies DELAYED Dec-2017 Expected Completion: Description: Recent Progress: A review of new technologies related to Expression of interests were received from four suppliers. payment options for our parking facilities, with a mandate to incorporate more user friendly Next Steps: payment options (ie. Pay By Mobile). An updated Request For Proposal to be issued by end of September. Internal review of submissions by end of October. A recommendation on the pay-by-mobile supplier to be completed by end of 2017. The end date for this project has been delayed from August 2017 to December 2017. NB06Development of Alternative (low cost) Traffic Calming Status as of Aug 31st 2017: COMPLETED Options Aug-2017 Expected Completion: Description: Recent Progress: Alternative short-term and low-cost options will This was developed and approved. Staff will work with Council on an be developed that can be implemented on annual basis for implementation. streets that are not considered a priority under Next Steps: the traffic calming policy. A new policy and procedures will be required to determine the selection and funding allocation and a menu of options will be created with an estimated level of speed and/or volume reduction. Status as of Aug 31st 2017: NB18Complete Streets Policy ON TRACK Apr-2018 Expected Completion: Description: Recent Progress: The City of Kitchener has a number of policies Terms of reference, public engagement strategy and stakeholder and practices that promote complete streets. engagement strategy have been prepared. W ork began on a draft The development of a complete street policy report. would review best practices and combine Next Steps: elements into a standalone policy document Public and stakeholder engagement will occur this fall. 2nd project that ensures planning, design and team meeting to occur in concert with engagement. A complete implementation of an element of the city's first draft is planned for early November. Staff will review whether transportation network considers and aims to project timelines can be achieved based on receiving input from meet the needs of all users regardless of age, internal stakeholders. ability and travel choice. SE09LED Street Light Conversion Implementation Status as of Aug 31st 2017: ON TRACK Apr-2018 Expected Completion: Description: Recent Progress: Implement the approved recommendation of Approximately 5000 lights have been installed. the LED Street Light Conversation Strategy. Next Steps: Conversion is well under way and will involve the conversion of 16000 street lights by 2018. Media event on September 7th. The end date for this project has been changed from December 2018 to April 2018. IF1 - 25 Greg St. Louis(519) 741-2600 ext. 4538 Utilities Status as of Aug 31st 2017: CS22Water & Sanitary - review of rate structure ON TRACK Aug-2020 Expected Completion: Description: Recent Progress: A rate restructuring review is required to ensure Meetings were held to gain support for a Region-wide affordability the financial sustainability of water & waste- program and staff have had ongoing Affordability meetings. water operations in order to better align fixed Next Steps: and variable costs with rate revenue costs. A public education/engagement plan will be developed over the 4th quarter of 2017 to incorporate the results from the Water Infrastructure Program review (previously referred to as the Accelerated Infrastructure Replacement Program). Staff will investigate a Region-wide affordability program over the course of several months. CS60Utility Meter Mobile Workforce Management System Status as of Aug 31st 2017: ON TRACK (MWMS) Dec-2019 Expected Completion: Description: Recent Progress: Source a highly configurable and flexible mobile The Utility Mobile Workforce Management System has been awarded workforce management solution to facilitate in by Council to the software vendor Clevest. Staff has been working on field management of a variety of gas and water defining internal processes in preparation for blueprinting. related legislated activities. The proposed Next Steps: solution will replace the current paper based The blueprint workshops with staff will commence in September. For systems, integrate through SAP service orders the remainder of the year, Clevest (the retained consultant) will be and Cityworks work orders allowing dispatchers working on the design of interfaces to fit Utilities requirements as to input into a queue of work plans delivered to identified during blueprinting. staff by mobile devices through the MWMS. IF1 - 26