Loading...
HomeMy WebLinkAboutCIS Agenda - 2021-10-041 KiTc�ivER Community and Infrastructure Services Committee Agenda Monday, October 4, 2021, 1:00 p. m. - 4:00 p. m. Electronic Meeting Due to COVID-19 and recommendations by Waterloo Region Public Health to exercise physical distancing, City Hall is open for select services. Members of the public are invited to participate in this meeting electronically by accessing the meeting live -stream video at kitchener. ca/watch now While in-person delegation requests are not feasible at this time, members of the public are invited to submit written comments or participate electronically in the meeting by contacting delegation@kitchener.ca. Please refer to the delegations section on the agenda below for registration deadlines. Written comments will be circulated prior to the meeting and will form part of the public record. Accessible formats and communication supports are available upon request. If you require assistance to take part in a city meeting or event, please call 519- 741-2345 or TTY 1-866-969-9994 Chair: Councillor B. loannidis Vice -Chair: Councillor D. Schnider Pages 1. Consent Items The following matters are considered not to require debate and should be approved by one motion in accordance with the recommendation contained in each staff report. A majority vote is required to discuss any report listed as under this section. 1.1. DSD -2021-166 - Old Mill Sanitary Pumping Station - Consultant Contract 3 Increase 2. Delegations Pursuant to Council's Procedural By-law, delegations are permitted to address the Committee for a maximum of five (5) minutes. Delegates must register by 11: 00 a. m. on October 4, 2021, in order to participate electronically. 2.1. None at this time. 3. Discussion Items 3.1. DSD -2021-177 - Neighbourhood Speed Limit 45 m 6 Review (Staff will provide a 10 -minute presentation on this matter.) 3.2. CSD -2021-15 - Additional Staff for Proactive 30 m 13 Sidewalk Enforcement 3.3. CSD -2021-17 - Fire Department Suppression 75 m 17 Response Time & Staffing Review (Staff will provide a 10 -minute presentation on this matter.) 4. Information Items 4.1. None. 5. Adjournment Dianna Saunderson Interim Manager of Council and Committee Services/ Deputy Clerk Page 2 of 33 Staff Report ` Develo hent Services Deoartr7ent www.kitchener. ca REPORT TO: Community & Infrastructure Services Committee DATE OF MEETING: October 4, 2021 SUBMITTED BY: Gross, Hans, Director of Engineering Services, 519-741-2200 ext. 7410 PREPARED BY: Spere, Chris, Manager, Construction Engineering, 519-741-2200 ext. 7412 WARD(S) INVOLVED: Ward 4 DATE OF REPORT: August 25, 2021 REPORT NO.: DSD -2021-166 SUBJECT: Old Mill Sanitary Pumping Station — Consultant Contract Increase RECOMMENDATION: That the contract for MTE Consultants Inc. for engineering services related to the Old Mill Sanitary Pumping Station (OMSPS) be increased by $282,700, funded by the development charge reserve fund. REPORT HIGHLIGHTS: • The purpose of this report is to increase the budget for a project that has had additional elements added to the consultant scope of work • The financial implications are limited to an additional transfer from the development charges reserve fund, which is completely funded by growth. • This report supports the delivery of core services. BACKGROUND: Old Mill Sanitary Pumping Station (OMSPS) is located in the south part of the city, on Old Mill Road adjacent to Willow Lake Park. The project is required to replace the existing sanitary pumping station with a new facility in order to accommodate the development of different parcels of developer -owned land. The OMSPS project was identified as a fully growth -related piece of infrastructure through previous development charges studies. Approved tenders for the provision of supplying engineering services in relation to the completion of an Environmental Assessment, design, tendering, approval and contract administration/construction inspection for the OMSPS was publicly tendered by the City and was awarded to MTE Consultants Inc. at an upset limit of $690,915.23. REPORT: MTE Consultant's scope of work for this project included the completion of a Schedule B Environmental Assessment, detailed design of a new/upgraded sanitary pumping station, tendering of the construction of the new station including the demolition of the old station, *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. Page 3 of 33 and construction services (Contract Administration and Construction inspection). MTE began the detailed design for the replacement station in 2017 with anticipated construction beginning in 2019. Construction began in 2021 and is expected to be completed in 2022. The original consultant terms of reference included preparation of a single construction tender. Through the design and subsequent geotechnical investigation, the soil conditions were found to require complex excavation including shoring to facilitate construction of new station. MTE was requested to prepare and complete a prequalification tender for the shoring portion of the construction. This work was not included in the original terms of reference. MTE's fees were based on an anticipated 240 construction working days. The construction of this new station is complex due to the depth of the excavation, the need for shoring, extensive dewatering, overall sequencing of the construction of the new station, connection of linear infrastructure and the demolition of the existing station. Due to this complexity, the project was tendered to include 360 construction working days. Dewatering of the high ground water table was anticipated and included in the tender. However, high dissolved iron content of the ground water caused issues with the quality of the dewatering discharge and necessitated additional testing and hydrogeological work be carried out by MTE during construction. The Environmental Assessment identified the old pumping station location as a potential lookout. A record of site condition is required and it is cost effective to complete this work through one consultant versus retaining a separate consultant to do the work in parallel. It is staff's recommendation that the additional costs for the OMSPS be funded by the development charge reserve fund. The reasons for the additional costs include: • MTE was asked to complete a prequalification tender for the shoring contractor. This was not included in the original terms of reference • MTE was asked to complete a Record of Site Condition for the existing pumping station site. This was not included in the original terms of reference • The consultant terms of reference asked the consultants to provide pricing for construction services based on 240 working days of construction. This project was ultimately tendered with a duration of 360 construction days. Construction was initially planned for 2019 and was delayed. • Issues with the quality exceedances of ground water discharge resulted in the need for additional water testing and efforts related to the hydro -geological portion of MTE's scope of work STRATEGIC PLAN ALIGNMENT: This report supports the delivery of core services. FINANCIAL IMPLICATIONS: The recommendation would result in a $282,700 transfer from the Development Charges reserve fund to the Old Mill Sanitary Pumping Station (OMSPS) capital account. Prior to considering this transfer, the DC reserve fund is projected to end 2021 with a positive balance of over $3M. Page 4 of 33 COMMUNITY ENGAGEMENT: INFORM — This report has been posted to the City's website with the agenda in advance of the council / committee meeting. PREVIOUS REPORTS/AUTHORITIES: • FCS -17-090 — E17-048 Consultant Services — Old Mill Sanitary Sewer Pumping Station APPROVED BY: Justin Readman, General Manager of Development Servies Page 5 of 33 Staff Report Develo n7ent Services Deoartr7ent REPORT TO: Community and Infrastructure Services Committee DATE OF MEETING: October 4, 2021 SUBMITTED BY: Cronkite, Barry, Director, Transportation Services, 519-741-2200, ext. 7738 L l\[ [ c HEN I� www. kitchener ca PREPARED BY: Hosseini, Faranak, Transportation Planning Project Manager, 519-741-2200, ext. 7665 WARD(S) INVOLVED: All Wards (1-10) DATE OF REPORT: September 23, 2021 REPORT NO.: DSD -2021-177 SUBJECT: Neighbourhood Speed Limit Review RECOMMENDATION: That the speed limit in all residential neighbourhoods within the City of Kitchener be reduced from 50km/h to 40km/h; That the speed limit in school zones and along signed and identified neighbourhood bikeways be further reduced to 30km/h within residential neighbourhoods; That the capital budget allocation required for implementation be referred to the 2022 budget process; and further, That the Uniform Traffic Bylaw be amended accordingly. REPORT HIGHLIGHTS: • The purpose of this report is to summarize the results of the Neighbourhood Speed Limit pilot project which evaluated the effectiveness of lowering speed limits in a neighbourhood -wide context in three (3) residential neighbourhoods in Kitchener. • This report also reviews the experience of other municipalities and outlines the current state of speed limits on Kitchener roads. • The key finding of this report is that by reducing speed limits (coupled with education and engagement efforts) vehicle operating speeds were reduced by 3km/h (7%) on average. The observed reduction is consistent with the experience of other municipalities reviewed in this report. • The estimated capital cost for signing the Neighbourhood Speed Limit Areas is $550,000. This includes approximately $475,000 for signage and installation and $75,000 for communications and engagement. This project is not expected to have a immediate impact on the operating budget, but it should be noted that regulatory signs are measured for reflectivity on an annual basis and must be replaced once reflectivity reduces beyond a certain threshold. *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. Page 6 of 33 • Community engagement included an online survey to gauge public support for lower speed limits in residential neighbourhoods. The survey showed that 57% of the participants are in support. • This report supports the strategic priority 3 (Safe and Thriving Neighbourhoods), strategy 3.2 (Create safer streets in our neighbourhoods through new traffic calming approaches), strategic action NB38 (traffic calming) of the City of Kitchener's Strategic Plan. BACKGROUND: Speeding in residential neighbourhoods is one of the most common concerns raised by residents to Transportation staff and members of Council. In an effort to address this community wide concern, staff have engaged with local residents, community associations, ward Councillors and other stakeholders through a number of different initiatives to better understand how the community feels that Kitchener's streets can be made safer for all road users. As a result of continued input and concerns from the community a neighbourhood speed limit review project was launched in 2019, through council's support of report DSD -19-159 — Neighbourhood Speed Limit Review. This pilot project resulted in the speed limits being reduced in three Kitchener communities. The intent of the pilot project was to assess the effectiveness of lowering speed limits on vehicle operating speeds. To better understand the impact of speed limit reduction in residential communities, staff also conducted best practices review and researched the experience of other municipalities. REPORT: Relationship Between Speed and Traffic Safety Vehicle operating speeds and safety are interconnected. Studies conducted through the transportation engineering field have shown a strong and direct correlation between higher speeds and the likelihood of involvement in a casualty collision — a collision that results in serious injury or fatality'. Studies also show the likelihood of survival in a collision between a vehicle and a pedestrian is approximately 15% when the vehicle is traveling at 50 km/h. However, the likelihood of survival increases to 70% when the vehicle is traveling at 40 km/h2. Drivers travelling at lower speeds are typically better able to scan the roadway, and notice objects and unusual movement closer to their vehicle, which lowers the potential for a collision to occur. Reduced speeds also increase opportunity for eye contact between road users, which can also play an important role in preventing collision S3. Neighbourhood Speed Limit Approach On May 1, 2018, the Highway Traffic Act (HTA) was amended to allow municipalities to define speed limits by identified neighbourhood areas. In this approach, speed limits are posted at the entry and exit points of a neighbourhood, eliminating the need to add signage to each roadway within the designated area 1 Driving speed and the risk of road crashes: A review, Letty Aarts, Ingrid Van Schagen, April 2005, Elsevier 2 Vision Zero 2.0 — Road Safety Plan Update, City of Toronto, 2019 3 Residential Speed Limit Review — Background Information, City of Saskatoon, 2021 Page 7 of 33 Effectiveness of Reduced Speed Limits A number of municipalities throughout Canada have already lowered speed limits throughout selected neighbourhoods. Table 1 summarizes the experience of other municipalities on the effectiveness of reduced speed limits without making any road geometry changes / physical measures. Table 1 — Experience of Other Canadian Municipalities with Lowerina Saeed Limits Location Details Saskatchewan, • Speed limit on all local roads within Montgomery Neighbourhood was ON reduced from 50 km/h to 40 km/h in 2016. • Changes were effective on some streets resulting in 1.4 to 4.9 km/h reduction in operating speeds. However, the speed limit changes were not evenly effective across the entire neighbourhood. Toronto, ON • Speed limits were reduced from 40 km/h to 30 km/h in some residential areas in 2015 and 2016. • There was a 28% reduction in the collisions involving pedestrians and a 67% reduction in serious and fatal injuries because of the speed reduction. Calgary, AB • Speed limit was reduced to 30 km/h in school zones and playground zones with fixed hours (7 am to 9 pm, 7 days a week) • The mean traffic speed was reduced by 6 km/h from 36 km/h to 30 km/h. • The number of collisions involving pedestrians decreased by 33% in playground zones. Edmonton, AB • Speed limits were lowered in six residential neighbourhoods in 2010. • Operating speeds were reduced as a result of reducing speed limits. • The operating speed reduction ranged from 4% to 11 % depending on the community. Neighbourhood Speed Limit Pilot Results To assess the effectiveness of the reduced speed limits on a neighbourhood -wide scale, City Council approved a pilot project that reduced the speed limits from 50 km/h to 40 km/h in three (3) residential neighbourhoods. The speed limits were further reduced to 30 km/h in school zones within these areas. To communicate this change and educate the public on Neighbourhood Speed Limit Areas, geotargeted social media content was posted and post cards were sent out to all impacted residents. In addition, notifications were sent to local schools to make parents aware of the speed limit change within school zones. The three (3) residential areas piloted are as follows: • Huron Area — This area is located in Ward 5 and is bounded by Fischer -Hallman Road, Huron Natural Area and Huron Road • Doon South Area — This area is located in Ward 4 and is bounded by Homer Watson Boulevard, Conestoga College Boulevard, New Dundee Road, Reidel Road, Caryndale Drive, Stauffer Drive, Tilts Bush and Schneider Greenway • Idlewood Area — This area is located in Ward 2 and is bounded by River Road East, Ottawa Street North, Lackner Boulevard and Fairway Road North Page 8 of 33 To better understand the effectiveness of increased enforcement on lowered speed limits, police presence was heightened in one of the three pilot areas during the data collection period. The area selected for heightened police presence was the Huron pilot area To assess the effectiveness of the pilot program, data was collected in May 2021 and compared with data collected in the three years priorto the speed limit reduction. The results of the before -after study are summarized in Table 2. Table 2 — Before After Saeed Studv Results Neighbourhood Before Before After After 85th # of Average 85th Average 85th Average Percentile roads Difference Percentile Operating Percentile Operating Speed studied (km/h) Difference Speed Speed Speed (km/h) (km/h) km/h km/h km/h Huron Area 43.90 51.54 39.16 47.21 7 -4.74 -4.33 -11 % -8% Doon South 46.40 55.03 45.90 53.61 9 -0.50 -1.42 Area I I I I I -1 % -3% Idlewood Area 48.01 55.84 43.30 51.86 8 -4.71 -3.98 -10% -7% Reducing the speed limits in residential neighbourhoods has resulted in a in a 1% to 11% reduction in vehicle operating speeds, depending on the neighbourhood. Staff feel that a key component of the reduction is also the education and engagement efforts that were undertaken. It is worth noting that heightened police presence may have also contributed to lower vehicle operating speeds in the Huron neighbourhood. The further reduction of speed limits in school zones showed the greatest impact in reduced vehicle operating speeds. Data collected in school zones showed a 12% (from 41.2 to 36.4 km/h) reduction in the average operating speed and a 13% (49 to 42.4 km/h) reduction in the 85th percentile speeds. Staff also conducted a detailed analysis of the data collected to gain a greater understanding of the impact on higher operating speeds; the 15% that drive above the 85th percentile speeds. The data showed a greater reduction in speeds in this segment, which should lead to an increase in overall road user safety. Recommendations Based on the results described in the previous sections, staff recommend lowering speed limits from 50 km/h to 40 km/h in all residential neighbourhoods within the City of Kitchener. Further, staff recommend that, school zones' and neighbourhood bikeways' speed limits within the residential areas be reduced to 30 km/h. Similar to the pilot project, a gateway signage approach is required at all locations. Staff have developed a map sectioning the City into potential Neighbourhood Speed Limit Areas. These areas are mostly bounded by arterial streets and regional roads. This map is provided in Appendix A. As shown in the map, several arterial roads and major collector roads intended to move and distribute large volumes of traffic are not included in the 40km/h zones. These include roads such as Block Line Road, Huron Road, Belmont Ave W, Queen's Boulevard, Strasburg Road, etc. Page 9 of 33 Staff will develop criteria to help prioritize an implementation schedule over 2022 to 2024. These criteria include but are not limited to speed related concerns from residents, school zones, pedestrian destinations, and operational efficiency. Communications and Engagement Plan A number of initiatives to engage and inform the public are proposed. Communication initiatives will include the following: • Social media posts on City accounts, included geo-targeted posts for Neighbourhood Speed Limit Areas being implemented; • Pamphlets and posters at city facilities; • Direct mailings to residents within the project areas; • Notifications sent home with students from local schools; and, • Webpage for information, updates and ongoing feedback. STRATEGIC PLAN ALIGNMENT: This report supports the strategic priority 3 (Safe and Thriving Neighbourhoods), strategy 3.2 (Create safer streets in our neighbourhoods through new traffic calming approaches), strategic action NB38 (traffic calming) of the City of Kitchener's Strategic Plan. FINANCIAL IMPLICATIONS: Capital Budget — The estimated cost for signing the Neighbourhood Speed Limit Areas project is $550,000 including $475,000 for 40 km/h signage and installation, $75,000 for communications and engagement to inform and educate residents of the proposed speed limit changes. This program is unfunded, and staff recommend that this program be referred to the 2022 Capital budget review. It is expected that this project would be implemented over 3 year timeframe (2022-2024). Operating Budget — The recommendation has no immediate impact on the Operating Budget, but staff do note that these signs will become part of the ongoing monitoring program and will need replaced at end of life (10+ years). COMMUNITY ENGAGEMENT: INFORM — This report has been posted to the City's website with the agenda in advance of the council / committee meeting. CONSULT — The City has conducted surveys to gauge public support for lower speed limits in neighbourhoods. The support for this type of initiative has generally been positive. COLLABORATE — An online survey was conducted to gauge public desire for a review of neighbourhood speed limits. The survey showed that 57% of the respondents agree that lowering traffic speeds is a priority in their neighbourhood. 27% disagree with that statement, while 16% were neutral or not sure. The top three priorities for speed limit reduction were: Commonly used school routes (78% of respondents), residential neighbourhood roads (72% of respondents), and pedestrian shopping and market areas (69% of respondents). More details about the survey is provided in Report DSD -19-159. Page 10 of 33 PREVIOUS REPORTS/AUTHORITIES: • Report DSD -19-159 APPROVED BY: Justin Readman, General Manager Development Services Department ATTACHMENTS: Attachment A — Neighbourhood Speed Areas — Map Page 11 of 33 Appendix A - Neighbourhood Speed Areas - Map Neighbourhood 1 � 55 I 56 54 I C 3 57 52 63a 51 i 6 47� X59 62 48 A5� 50 9 \ 49 61 32 ^` 43 x. 41 , � 63b 3 42 sa 35 40 � / � -30 � 26 _ • �34 9 8 65 �23� 29 2a 6 37 Za/ 26 66 20 25 7 10 1 14 1 12 17 13 4 � 5 2 � `1/ z 4 b 3b 3c Wrc.R 'This map is for illustration purposes only. Some zones may be revised during implementation and based on operational factors. Page 12 of 33 Staff Report ` Community Services Departrmnt www. kitchener. ca REPORT TO: Community and Infrastructure Services Committee DATE OF MEETING: October 4, 2021 SUBMITTED BY: Gloria MacNeil, Director of By-law Enforcement, 519-741-2200 ext. 7952 PREPARED BY: Gloria MacNeil, Director of By-law Enforcement, 519-741-2200 ext. 7952 WARD(S) INVOLVED: All DATE OF REPORT: September 21, 2021 REPORT NO.: CSD -2021-15 SUBJECT: Additional Staff for Proactive Sidewalk Enforcement RECOMMENDATION: That Council refer the expansion of the proactive sidewalk enforcement program to the 2022 budget process. REPORT HIGHLIGHTS: During the 2021 budget process, Council directed staff to report back with related impacts of hiring additional proactive bylaw inspectors for the 2021-2022 winter season. Adding additional officers to the proactive snow and ice program would allow for greater coverage in more areas of the city. The additional operating costs of adding four additional staff to support an increase to the proactive bylaw inspection program is approximately $163,191.30 BACKGROUND: During the 2021 budget process, Council directed staff to report back with related impacts of hiring additional proactive bylaw inspectors for the 2021-2022 winter season, and to make any additional recommendations for improving our sidewalk snow clearing strategies. REPORT: Council approved a pilot program for four proactive snow and ice officers in the 2018-19 winter season. The program ran successfully for two full seasons at which time Council approved the implementation of a permanent program in 2020. Proactive Program: The permanent proactive program began in November 2020 and operates annually from November 15 until April 15th. Each year staff have preselected areas of the city where there is generally a higher volume of pedestrian use, including areas of the city where there are schools and retirement homes. *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. Page 13 of 33 Each year, staff hire four full time temporary employees who are responsible for conducting proactive, daily inspections (unless it is actively snowing or the 24 hours has not lapsed since the last snow fall). These staff will walk up and down the sidewalks within a preselected neighbourhood and inspect each sidewalk to determine if the sidewalk has been adequately cleared of all snow and ice to ensure safe passage for all pedestrians including those who may have difficulty with mobility or require a mobility device such as wheelchair, walker, cane, stroller, etc. If a sidewalk is not adequately cleared or if there is ice present on the sidewalk, staff will leave a notice for the occupants of the residence. The notice advises that staff were on site, it provides an overview of the bylaw requirements and advises the occupants they have 24 hours to clear the sidewalk of snow and ice. Staff also provide a pamphlet that explains the importance of clearing your sidewalk and being a good neighbour. The notice provides the officers name and contact information should the homeowner/occupant want to discuss the notice or if they require further information. The challenge with the proactive program is that it often generates more complaints and creates frustration amongst residents who may be making an effort to clear their sidewalk however the end result is not adequate/sufficient or does not comply with the requirements of the bylaw. Reactive Program: The City has had a reactive snow and ice program in place for over 25 years. This program solely relies on complaints being received by members of the public in which an officer will respond out and conduct an inspection of the sidewalk that was complained about and in addition, will also inspect eight properties on either side of the complaint address, therefore one complaint will result in a minimum of 17 inspections. The same processes is followed and applied in both the proactive and reactive snow and ice programs. Once staff have determined the sidewalk is not in compliance with the snow and ice bylaw, staff will leave the same notice and pamphlet at the address advising of the bylaw, the expectations and the 24 hour time frame to bring the sidewalk into compliance. The reactive program generally results in less complaints from residents as these complaints for the most part tend to be more severe in nature and often tend to be properties where little to no effort has been made. Both programs allow for one snow and ice notice to be left at each residence in the city each season, the notice is meant to serve as education and a reminder that residents are required to clear their sidewalk within 24 hours of the cessation of a snow fall and it must be cleared of all snow and ice. The charts below show the total number of violations recorded for both the proactive and reactive programs as well as the total number of violations that were sent to the contractor for clearing over the past three winter seasons. Page 14 of 33 Reactive Complaints Year Total Violations Inspected Total sent to Contractor for Clearing 2020-21 1881 324 2019-20 2055 219 2018-19 2842 182 Proactive Complaints Year Proactive Violations Found Total sent to Contractor for Clearing 2020-21 1419 193 2019-20 1743 91 2018-19 2548 57 Adding additional officers to the proactive snow and ice program would allow for greater coverage in more areas of the city. This would ensure better coverage throughout the city rather than focusing on designated/specific areas for an entire season. The goal of the program would be to have staff proactively work through every ward and ultimately every street within each neighbourhood. The end result would be to encourage ongoing compliance amongst all residents as residents would not be aware of when the team would be in their neighbourhood. Additional staffing would also provide Bylaw Enforcement with the resources to focus on problem areas and provide targeted enforcement on locations with high volumes of complaints and non-compliance. Currently, we do have a program in place for chronic repeat offenders where a history of non-compliance has been established. Once an address has been deemed to be chronically in non-compliance they are placed on a list with our contractor and the sidewalk is automatically inspected and cleared if required by the contractor after each snow fall. We previously had five addresses on this list however several of the properties have sold and we currently only have one. Staff would continue to respond to complaints reactively and apply our enforcement process as we always have. Contractor: In 2015, staff contracted out snow clearing of sidewalks associated with the Snow and Ice Bylaw. The agreement currently in place with the contractor, requires that they respond the following business day to clear any sidewalks that were inspected and forwarded by staff for non-compliance. The contractor is committed to this response time and have resourced their staffing levels to ensure they are able to maintain response times within our 24 hour commitment. STRATEGIC PLAN ALIGNMENT: This report supports the delivery of core services. Page 15 of 33 FINANCIAL IMPLICATIONS: Expanding the program would have a direct impact on the Operating Budget. The cost of four additional officers for the proactive program is approximately $163,191.30. COMMUNITY ENGAGEMENT: This report has been posted to the City's website with the agenda in advance of the Committee/Council meeting. ACKNOWLEDGED BY: Michael May, General Manager Community Services Department & DCAO Page 16 of 33 Staff Report Community Services Departr7ent REPORT TO: Community & Infrastructure Services Committee DATE OF MEETING: October 4, 2021 SUBMITTED BY: Fire Chief Bob Gilmore, ext. 5501 www. kitchener ca PREPARED BY: Helena Foulds, Manager, Service Coordination & Improvement, Community Services Department, ext. 7193 WARD(S) INVOLVED: All Wards DATE OF REPORT: September 24, 2021 REPORT NO.: CSD -2021-17 SUBJECT: Fire Department Suppression Response Time & Staffing Review RECOMMENDATIONS: That City Council approve the plan to increase suppression staff by 20 new firefighters over the next four years and open a new fire station in 2026, as outlined in CSD -2021-17; and that the financial implications of these additions be referred to the City's annual budget process. That staff be directed to complete a fire station location study in 2022 to determine the optimal location for a new fire station, and subsequent impacts on the response zones for other Kitchener fire stations. REPORT HIGHLIGHTS: • Over the past several years Kitchener has experienced significant growth in its population; and, in the number of tall buildings within the community, especially in the downtown. That growth is projected to continue for many years to come. As a result of this growth, the Kitchener Fire Department (KFD) is finding it difficult to respond to emergency calls within an acceptable time. • On average, between 2016 and 2019, the KFD's response times to medical or fire rescue calls took longer than the industry standard almost half of the time (43%). • An independent review of the KFD, conducted by the Fire Underwriters Survey, found that KFD's current suppression staffing levels could negatively impact fire insurance classifications within the city if not addressed. This has the potential to increase the cost of fire insurance within the community. • In 2017, as part of the City's Fire Master plan, a review conducted by a third -party consultant found that with current suppression staffing levels, there is no area of the city where 24 firefighters can respond to a fire in a high-rise building within the industry standard response time. *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. Page 17 of 33 • Despite the significant growth in the community, the KFD has fewer suppression firefighters today than it did in 2011 (5 fewer). In 1991 the KFD had 34 firefighters on duty at one time, today it has 35. • Kitchener has the 2nd lowest number of suppression firefighters per 1,000 residents, and the 4t" lowest number of fire stations when compared to 12 other Ontario municipalities. • Four of the City's current fire stations are projected to respond to more than 2,500 calls each this year, which is considered a "high volume" by the Fire Underwriters Survey. In 2019, Fire Station 2 (Guelph Street), which is the station primarily responsible for responding to emergency calls within the downtown, was already responding to over 3,800 calls — well above the threshold of a "high volume" station. Growth Key Indicators (2011 - 2019) Number of calls for emergency supression response 16% Number of residential buildings 6 storeys or more 6% Population growth Number of KFD Fire -3% supression staff -10% 0% 10% 20% 30% 40% 50% Figure 1: Change in key growth indicators, 2011 - 2019 BACKGROUND: 58% The KFD provides City of Kitchener residents, visitors and businesses with protection against loss of life, property and environmental damages caused by fires, accidents, and all other hazards. KFD delivers fire and emergency protection services through three strategic lines of defence: public fire safety and education; fire safety standards and enforcement; and emergency response. This report, and staff's recommendations contained within it, are focused on the third line of defence, emergency response, which is provided primarily by KFD's Suppression Division. Over the past 40 years, several studies have been conducted to ensure adequate emergency response and protection services across the City of Kitchener. Further, in formulating the recommendations within this report staff have reviewed industry best practices like the National Fire Protection Association (NFPA) 1710 standard, the Fire Underwriters Survey review of KFD, the City Council approved Fire Master Plan and accompanying Community Risk Profile, and data from comparator municipalities within Ontario. E Page 18 of 33 The following provides a brief summary of the key findings from previous studies and supporting data: Fire Location Study (1981): A fire station location study completed in 1981 found that, "existing fire protection coverage was inadequate."' The report also revealed that the Kitchener Fire Department was meeting its response time objective for 80.4% of the city using its five existing fire station S.2 An eight station model was recommended at that time in order to achieve effective fire protection coverage.3 Currently, the City of Kitchener operates seven fire stations and has not yet completed the eight station model originally proposed in 1981. 2. Fire Location Study (1990): In 1990, another fire location study was completed to evaluate existing service levels, including response times, and to make a recommendation on a 10 -year fire station location/relocation strategy. The 1990 study concluded that the Kitchener Fire Department was meeting the first truck response time objective for 66.5% (one-third) of the City,4 which is a 13.9% decrease from the previous 1981 study. The 1990 study estimated that by the year 2000 approximately 35% of the City would not receive adequate fire protection.5 A seven -station model was analyzed; however, this configuration also revealed that only 79% of the city would receive adequate coverage within the first truck response time objective.6 More importantly, the seven station model did not account for the high levels of urban growth and intensification that Kitchener is currently experiencing. Like the study conducted in 1980, this study referenced the creation of an eight -station model to serve the entire community. 3. Fire Master Plan (2017) In 2017, City Council approved the Fire Master Plan as the guiding strategic document for the Fire Department. The master plan included a response analysis report conducted by Dillon Consulting. The findings in the Dillon Consulting report are based on historical data from 2011 to 2015. The report states that with current staffing levels, the KFD can only cover 27% of calls with 14 firefighters on scene' within the NFPA 1710 standard response time which demonstrates a further decrease from the 1990 Fire Location Study. More importantly, fire suppression response in a high-rise building requires 24 staff to execute a safe emergency response. The report found that "there is no area of the city where 24 firefighters can respond to a call within the NFPA 1710 standard. "$ 1991 Fire Station Location Study, page 1 1991 Fire Station Location Study, page 10 3 1991 Fire station Location Study, page 12 a 1991 Fire Station Location Study, page 12 s 1991 Fire station Location Study, page 13 6 1991 Fire Station Location Study, page 13 City of Kitchener 2017 Fire Master Plan, Appendix E, page 27 s City of Kitchener 2017 Fire Master Plan, Appendix E, page 27 3 Page 19 of 33 4. Fire Underwriters Survey (2019) The Fire Underwriters Survey (FUS) represents approximately 90% of Canada's private sector property and casualty insurers. They provide data on public fire protection for fire insurance statistical and underwriting evaluation. In 2019, FUS assessed Kitchener's fire defense for fire insurance grading and classification purposes. The review identified several areas for improvement including available suppression resources.9 The report stated, "improving response capabilities across the City, along with staffing in both suppression and prevention would ideally result in the largest impact to current fire insurance classifications."10 As the City of Kitchener grows in population, high rise development and call volume for emergency response, the need for fire protection also increases. If no action is taken to address current suppression staffing, the FUS score could be negatively impacted, which has the potential of increasing the insurance rates for property owners. REPORT: Suppression Division Overview KFD's Suppression Division provides critical fire suppression services as well as first response to fire emergencies, medical emergencies, hazardous materials, and other disasters. In addition, this division responds to incidents that require specialized rescues (i.e. vehicle extrications, confined space rescue, ice and water rescue, trench and structural collapse and more). Further, this division also supports the provision of some fire prevention and fire public education programming to the community. Currently, the Suppression Division consists of 183 firefighters divided into four platoons located at seven fire stations across the city. Over the years, as the community has grown, the KFD has made several operational changes to find efficiencies and alleviate the growing demand for service on the Suppression Division, without adding additional staff. Those changes include: • removing an aerial truck from service resulting in a reduction of two firefighters from the minimum staffing level, and capital savings associated with maintenance and operation of the aerial truck; • removing a permanent staff member on the tanker truck resulting in a reduction of one firefighter from the minimum staffing level; • reducing Station 3 response to the downtown core from five to four firefighters resulting in a reduction of one firefighter from the minimum staffing level; • reducing each platoon by one firefighter through attrition (four firefighters in total); • funding a new full-time position in the Fire Prevention division by reducing one platoon in Fire Suppression by one firefighter; • upgrading technology in the Communications division to improve the EMS notification systems to allow call data to interface directly with the Kitchener Fire dispatch system; 9 2019 Fire Underwriters Survey — City of Kitchener, page 2 10 2019 Fire Underwriters Survey — City of Kitchener, page 6 9 Page 20 of 33 • installing mobile data terminals (MDT's) in the cabs of fire apparatus allowing fire dispatch to communicate electronically with all apparatus; and, • integrating Direct Detect with fire dispatch. The combined result of these operational changes is that today the Suppression Division of KFD is operating with a total of five fewer firefighters than it was in 2011, despite the growth pressures experienced in the community. In addition to these operational changes and efficiencies, over many years KFD has sought to find creative opportunities to generate revenue to help offset operational costs through programs such as the Fire Marquee program of charging insurance companies for certain operational costs and the expansion of Direct Detect where possible. 1. Growth and Intensification Population Growth Population growth is an important consideration in fire suppression because call volume and total number of emergency incidents increases as population increases. The City of Kitchener has been growing at a steady rate. The population increased by approximately 51,468 residents between 2006 and 2021 and this trend is expected to continue, bringing the total population to 322,000 residents by 2041.11 Overall, Kitchener can expect approximately 117,332 new residents between 2006 and 2041. The population forecast in Figure 2 (below) does not account for new construction and development. An increase in residential development will have an even greater impact on overall population growth. Total Population 350,000 I 322,000 304, 214 300,000 286,486 I 271,196 256,136 250,000 233,222 219,153 204,668 I 200,000 150,000 I 100,000 50,000 I 0 2006 2011 2016 2021 2026 2031 2036 2041 Historical Growth (Statistics Canada) Future Growth Projections (Region of Waterloo Forecast) Figure 2: total population, 2006 - 2041 Tall building Development " Region of Waterloo population forecast for the City of Kitchener, 2021 5 Page 21 of 33 Building height is an important consideration in fire suppression because the number of firefighters increases from 15 to 24 when responding to a fire in a tall building (e.g. high- rise). Figure 3 shows that the City of Kitchener is projected to more than double the number of buildings greater than six storeys by 2030. This projection only includes future developments staff are aware of at various phases (i.e. pending approval, approved, under construction, built, occupied) — which means the growth in these types of building is likely to be much more than shown in Figure 3. # of Buildings 6 Storeys or More 227 141 117 103 W J 2010 2020 Figure 3: increase in number of buildings more than 6 storeys Emergency Response Call Volume Growth Call volume for an emergency response from KFD has increased 14.51 % between 2016 and 2019. Fire Station 1 (Headquarters), Station 2 (Guelph Street) and Station 5 (Queen's Blvd) already receive more than 2,500 calls per year which is considered "high volume" by the Fire Underwriters Survey. Station 4 (Fairway Road) is also expected to reach the 2,500 calls/year benchmark within the next year. It is important to note that the Suppression Division responds to every fire response call with the same level of urgency and staffing regardless of incident type because they do not know the severity of the emergency until they arrive on scene. When the KFD receives a Fire or Fire -Alarm call they send the same number of staff and apparatus because they do not know what kind of response is required until they arrive. Once the KFD assess the situation, they can send resources back (if the call is a false alarm) or request for additional support if necessary. C^ Page 22 of 33 Number of Calls per Year 16000 14,806 15,019 14,018 14000 13,115 12000 10000 8000 6000 4000 2000 0 2016 2017 2018 2019 ■ Medical ■ Fire - Alarm ■ Rescue ■ Fire ■ Public Assistance Total Figure 4: number of calls per year, 2016 — 2019 As shown in Figure 4 (above), KFD plays a critical role in partnering with paramedic services to respond to medical emergencies within the community. Suppression staff are trained to the red cross first responder (RCFR) level and deliver cardiopulmonary resuscitation (CPR) and automated defibrillator procedures. Fire apparatus are also supplied with life saving equipment that allows firefighters to begin lifesaving efforts before paramedics can arrive on scene. KFD is often the first to arrive on a medical emergency call and can perform necessary life-saving procedures until paramedics are able to arrive and take over care for the patient. 7 Page 23 of 33 Call Volume Growth — Station #2 (Guelph Street) Call Volume for Fire Station 2 SOI17 4000 3,865 3;731 3,507 3500 3000 2500 2000 1500 1000 500 3,110 2016 Figure 5: call volume for Station 2 Fire Station 2 is located on Guelph Street and provides service to a wide geographic area, including communities as far as North Bridgeport all the way to Cherry Hill and Mill - Courtland. Station 2 also serves the downtown core which continues to grow and intensify (including the addition of many new tall buildings). Station 2 is Kitchener's busiest fire station and already receives a high volume of calls. The black line in Figure 5 (above) represents the FUS benchmark for high-volume and Station 2 has been operating above this benchmark (2,500 calls/year) since 2016. Station 2 is significantly impacted by high-rise response and intensification within the downtown core. The opening of a new Fire Station (as recommended in this report) to support the growth in the downtown will allow the response areas for other stations to be adjusted, which will help reduce response times to emergency calls in many parts of the City. Staff are recommending that a location study be completed in 2022 to determine the most strategic location for a new fire station to help alleviate the pressure on Station 2 and the other fire stations. 2. Response Times NFPA 1710 Response Time Standard The NFPA (National Fire Protection Association) is the most highly recognized fire service association North America. The NFPA is an international non-profit organization that was established in 1896. The organization's mission is to reduce the burden of fire and other hazards on quality of life by providing and advocating consensus codes and standards, research, training and education. NFPA is recognized as one of the world's leading advocates for fire prevention and an authoritative source on public safety. E, Page 24 of 33 Over the past decade, many fire departments across Ontario have been moving towards using the standards established by the National Fire Protection Association to help to set their response times. While there is no legislated requirement for City to meet NFPA standards, the province of Ontario adopted NFPA as the standard in 2013. One of the recommendations contained within the City Council approved Fire Master Plan (2017), was to conduct a review of KFD's emergency response capabilities against the NFPA 1710 standard. That standard specifies requirements to deploy fire suppression resources in order to protect residents and firefighter safety. NFPA 1710 states that 90% of the time: • an initial response of four firefighters should arrive on scene within five minutes and 20 seconds for a fire/rescue call and five minutes for a medical call. • a full response of 15 firefighters should arrive on scene within eight minutes for a single detached home; and, • a full response of 43 firefighters should arrive on scene within 10 minutes for a building more than six storeys tall12. Fire Responses in Tall Buildings Responding to a fire rescue or other emergency call within a tall building requires additional staff to be on scene in order to ensure firefighter and resident safety. It also requires additional time in order to reach the scene (vertical response). The NPFA 1710 standard also lays out the number of firefighters that should be deployed to respond to different types of fire rescue emergencies. The following chart demonstrates the increased number of fire suppression staff required to respond to fires within a building of six storeys or more versus fires within a single detached dwelling. Initial response (all 4 fire/rescue calls) Full response for a 15 detached single dwelling Full response for 24 buildings more than 6 storeys 8 minutes 10 minutes 0=0 011=111111,01901SVA111 NFPA 1710 KFD Fire Master Plan 13 The Dillon report in the 2017 Fire Master Plan concluded that, with current staffing levels, the KFD can only respond to 27% of calls with 14 firefighters on scene within the NFPA standard response time and there is no area of the City where 24 firefighters can respond " The NFPA 1710 indicates 43 firefighters required for emergency response in a building more than six storeys; however, the Kitchener Fire Master Plan amended this number to 24, which was approved by Council in 2017. 13 City of Kitchener 2017 Fire Master Plan, Appendix E, page 27 E Page 25 of 33 to a fire in a high-rise building within the NFPA 1710 standard which is a concern given the significant growth in high rise developments, especially in the downtown area. Further, the NFPA 1710 standard indicates that 43 firefighters are required for a high-rise response14. However, the 2017 Fire Master Plan recognizes 24 firefighters as a more reasonable response. This approach aligns with other Ontario municipalities who are also unable to assemble 43 firefighters on scene for a high-rise emergency response. Figure 6 shows that, on average between 2016 — 2019, Kitchener met the NFPA 1710 response time standard for initial response 57% of the time. In 1990, the KFD met the City's first due response time for 66.5% of the city15. This downward trend is likely to continue if the appropriate resources are not allocated to reflect the City's growth. Average Number of Times NFPA Total Reponse Time Standard was Met (2016 - 2019) Yes No Figure 6: NFPA 1710 response time met (yes/no) *Total response time includes the time from which a call is received in the station to when the first truck arrives on scene Figure 7 and 8 (below) show that, for example, of the 43% of calls that did not meet the NFPA 1710 standard in 2019, the response time was an average of 2 minutes 20 seconds longer than the standard for fire/rescue calls and 1 minute 26 seconds longer than the standard for medical calls in 2019. Response time and depth of response (number of personnel on scene) are critical factors when responding to an emergency (medical, fire or rescue). Adhering to these standards for both response time and number of personnel on scene can have a life-saving effect. For example, a house fire can double in size every minute and the survivability of a heart attack 14 See Appendix A, section 5.2.4.3 for full details on full response for high-rise buildings. " The City did not use NFPA 1710 standard in 1990. At that time, response times were measured against a Council approved standard. 10 Page 26 of 33 reduces significantly after four minutes. It is essential that the Kitchener Fire Department make every effort to adhere to the NFPA standard to ensure the safety of all citizens. Average KFD Total Response Time Above NFPA 1710 for Fire/Rescue Calls (5:20+) 0:02:27 2:23 0:02:23 2:20 0:02:18 2;13 0:02:14 0:02:10 0:02:05 2:02 0:02:01 0:01:57 0:01:52 1 N LA 0:01:48 2016 2017 2018 2019 ■ NFPA Fire/Rescue 5:20+ Figure 7: average time above the NFPA standard for fire/rescue calls Across all of Kitchener response times are frequently impacted by apparatus responding outside their own designated station area. For example, if Station 2 is busy responding to a call in the downtown, and it receives a second call to respond to an emergency in the Kiwanis area (which is also within their response zone), another station will need to travel from across the City (e.g. Stanley Park, Forest Heights) in order to respond to the call in Kiwanis. This need to respond outside of a station's assigned response zone adds a significant amount of time to a response and causes a ripple effect when stations are consistently travelling further from their response zones. Average KFD Total REsponse Time Above NFPA 1710 for Medical Calls (5 min+) 0:01:26 1:23 [1113 WIX iWO 0:01:18 1:16 1:14 0:01:13 0:01:09 � ■ ■ 0:01:05 2016 2017 2018 2019 ■ NFPA Medical 5:00 min + Figure 8: average time above the NFPA standard for medical calls 11 Page 27 of 33 3. Comparison of Ontario Fire Departments (2021) Information from 12 Ontario municipalities was collected to better understand how the KFD ranks compared to fire departments serving similar communities. Comparator municipalities were selected based on total population, population density, and assessment value most like the City of Kitchener. Waterloo, Cambridge and Guelph were also included as Regional comparators although they are smaller in population and geographic size. Compared to other cities, Kitchener has the second lowest number of firefighters per 1,000 people and is the lowest among regional comparators. Number of Firefighters per 1,000 people 1.40 1.20 1.00 0.80 0.60 0.40 0.20 0.00 Figure 7: number of firefighters per 1, 000 people Compared to other cities, Kitchener is the fourth lowest when comparing the total number of fire stations per 1,000 people and is the lowest among regional comparators. 0.050 0.045 0.040 0.035 0.030 0.025 0.020 0.015 0.010 0.005 0.000 Number of Fire Stations per 1,000 people °°� °° �ue �e a0 � °roa•a� Figure 8: number of fire stations per 1,000 people 12 Page 28 of 33 RECOMMENDATIONS: In order to respond to the significant growth occurring within the City (population, tall buildings and calls for emergency service), and to help improve response times to fire rescue and medical calls, staff recommend hiring 20 new firefighters over the next four years and opening a new fire station in 2026. Adding a new fire station would help the KFD respond to the significant population and tall building growth (particularly in the downtown), and to improve suppression response times from stations across the city. The recommendation to hire 20 new staff over four years and then relocate 20 firefighters to the new station in 2026 (once it opens) will allow the department to spread the operating costs over a four-year period rather than incur those costs all at once. Further, the department will be able to focus on talent attraction, recruitment and service delivery over a four-year period as oppose to attempting to hire all those staff within one year. The recommendation to open a new fire station in 2026 will complete the eight -station model which was recommended in the 1990 Fire Station Location Study. Staff recommend a comprehensive location study be completed in 2022 to identify a specific location for Station 8 as well as make recommendations for potential land acquisition (e.g. purchase, development, partnership, utilization of existing city property, or expansion of an existing station). STRATEGIC PLAN ALIGNMENT: This report supports the delivery of core fire suppression and emergency response services. FINANCIAL IMPLICATIONS: The financial implications of staff's recommendation to increase suppression staff by 20 new firefighters over the next four years are outlined below. Staff are recommending these financial impacts be referred to the City's annual budget process. 2022 2023 2024 2025 2026 Total Operating budget increase required 289,818 580,058 662,173 653,118 435,493 2,620,659 Tax Levy Impact 0.22% 0.44% 0.50% 0.49% 0.33% 1.98% Each new firefighter hired requires outfitting in personal protective equipment. The capital cost of these items' averages $23,000/year and will also be referred to the 2022 budget process for tax supported funding. The capital costs of the new fire station and related truck(s) are eligible for development charge (DC) funding. The City is currently conducting a DC background study and will bring an updated DC by-law to Council for approval in 2022. The new fire station and related truck(s) will be included in a future capital budget once the DC by-law is updated. 13 Page 29 of 33 COMMUNITY ENGAGEMENT: This report has been posted to the City's website with the agenda in advance of the council committee meeting and will be subject to the 2022 budget engagement process should Council approve of staff's recommendations. APPROVED BY: MICHAEL MAY, DEPUTY CHIEF ADMINISTRATIVE OFFICER APPENDICIES Appendix A - NFPA 1710 Standard Summary 14 Page 30 of 33 Appendix A — NFPA 1710 Standard Summary The following terms and standards are directly from the NFPA 1710 Standard for the Organization and Deployment of Fire Suppression Operations, Emergency Medical Operations, and Special Operations to the Public by Career Fire Departments 2020. Important Terms Alarm Answering Time: The time interval that begins when the alarm is received at the communication center and ends when the alarm is acknowledged at the communication center. Alarm Processing Time: The time interval from when the alarm is acknowledged at the communication center until response information begins to be transmitted via voice or electronic means to emergency response facilities (ERFs) and emergency response units (ERUs). First -Due Response Zone: The geographic area surrounding a fire station in which a company from that station is projected to be the first to arrive on the scene of an incident. Turnout Time: The time interval that begins when the emergency response facilities and emergency response unit's notification process begins by either an audible alarm or visual annunciation or both and ends at the beginning point of travel time. Total Response Time: The time interval from the receipt of the alarm at the primary emergency response facility to when the first emergency response unit is initiating action or intervening to control the incident. Travel Time: The time interval that begins when a unit is en route to the emergency incident and ends when the unit arrives at the scene. High -Hazard Occupancy: These occupancies include schools, hospitals, and other special medical facilities, nursing homes, high-risk residential occupancies, neighborhoods with structures near one another, high-rise buildings, explosives plants, refineries, and hazardous materials occupancies. Alarm answer Alarm processing 15 sec 95% of the time 64 sec 961% of the lime or or 40 sec 99% of the time 106 sec 99% of the time Turnout First -due engine Fire. 80 sec 240 sec (4 min) EMS: 60 sec 90% of the time Second -due engine M 316}p0 sec (6 min) 90+'o of the firne ` Initial full alarm Lowimedium hazard High hazard 4800 sec (8 min) 610 sec (10 min 10 sec) 90% of the tlrne 90 -0 of the time Figure 9: NFPA 1710 Response Objectives 15 Page 31 of 33 NFPA 1710 Standard for Apartment Initial Full Alarm Assignment Capability (5.2.4.3) The initial full alarm assignment to a structure fire in a typical 1200 ft2 apartment within a three-story, garden -style apartment building shall provide for the following: 1. Establishment of incident command outside the hazard area for the overall coordination, direction, and safety of the initial full alarm assignment with a minimum of two members dedicated to managing this task (2). 2. Establishment of two uninterrupted water supplies at a minimum of 400 gpm (1520 L/min), with each supply line maintained by an operator. 3. Establishment of an effective water flow application rate of 300 gpm (1140 L/min) from three handlines, each of which has a minimum flow rate of 100 gpm (380 L/ min), with each handline operated by a minimum of two members to effectively and safely maintain each hand- line (6). 4. Provision of one support member for each attack, backup, and exposure line deployed to provide hydrant hookup and to assist in laying of hose lines, utility control, and forcible entry (3). 5. Provision of at least two victim search -and -rescue teams, each team consisting of a minimum of two members (4). 6. Provision of at least two teams, each team consisting of a minimum of two members, to raise ground ladders and perform ventilation (4). 7. If an aerial device is used in operations, one member to function as an aerial operator and always maintain primary control of the aerial device (1). 8. At a minimum, an initial rapid intervention crew (IRIC) assembled from the initial attack crew and, as the initial alarm response arrives, a full and sustained rapid intervention crew (RIC) established (4). 9. The establishment of an initial medical care component consisting of at least two members capable of providing immediate on -scene emergency medical support, and transport that provides rapid access to civilians or members potentially needing medical treatment (2). 10. Total effective response force is a minimum of 27 (28 if an aerial device is used). NFPA 1710 Standard for High -Rise Initial Full Alarm Assignment Capability (5.2.4.4) The initial full alarm assignment to a fire in a building with the highest floor greater than 75 ft (23 m) above the lowest level of fire department vehicle access shall provide for the following: 1. Establishment of a stationary incident command post outside the hazard area for overall coordination and direction of the initial full alarm assignment with a mini- mum of one officer with an aide dedicated to these tasks and all operations are to be conducted in compliance with the incident command system (2). 2. Establishment of an uninterrupted water supply to the building standpipe/sprinkler connection sufficient to support fire attack operations maintained by an operate and if the building is equipped with a fire pump, one additional member with a radio to be sent to the fire pump location to monitor and maintain operation (1/1). 3. Establishment of an effective water flow application rate on the fire floor at a minimum of 500 gpm (1892 L/m) from two handlines, each operated by a minimum of two members to safely and effectively handle the line (4). 4. Establishment of an effective water flow application rate on the floor above the fire floor at a minimum of 250 gpm (946 L/m) from at least one handline, with each deployed handline operated by a minimum of two members to safely and effectively handle the line (2). 5. At a minimum, an initial rapid intervention crew (IRIC) assembled from the initial attack crew and, as the initial alarm response arrives, a full and sustained rapid intervention crew (RIC) established (4). 6. Provision of two or more search -and -rescue teams consisting of a minimum of two members each (4). 7. Provision of one officer, with an aide, dedicated to establishing an oversight at or near the entry point on the fire floor(s) (2). 8. Provision of one officer, with an aide, dedicated to establishing an oversight at or near the point of entry on the floor above the fire (2). 9. Provision of two or more evacuation management teams to assist and direct building occupants with evacuation or sheltering actions, with each team consisting of a minimum of two members (4). irl Page 32 of 33 10. Provision of one or more members to account for and manage elevator operations (1). 11. Provision of a minimum of one trained incident safety officer (1). 12. Provision of a minimum of one officer two floors below the fire floor to manage the interior staging area (1). 13. Provision of a minimum of two members to manage member rehabilitation and at least one of the members to be trained to the ALS level (2). 14. Provision of an officer and a minimum of three members to conduct vertical ventilation operations (4). 15. Provision of a minimum of one officer to manage the building lobby operations (1). 16. Provision of a minimum of two members to transport equipment to a location below the fire floor (2). 17. Provision of one officer to manage external base operations (1). 18. The establishment of an initial medical care component consisting of a minimum of two crews with a minimum of two members each with one member trained to the ALS level capable of providing immediate on -scene emergency medical support, and transport that provides rapid access to civilians or members potentially needing medical treatment (4). 19. Total effective response force is a minimum of 42 (43 if the building is equipped with a fire pump). 17 Page 33 of 33