Loading...
HomeMy WebLinkAboutDTS-10-156 - Civic District Parking Structure DebentureREPORT REPORT TO: Finance & Corporate Services Committee DATE OF MEETING: August 23, 2010 SUBMITTED BY: John McBride, Director of Transportation Planning PREPARED BY: John McBride (741-2374) WARD(S) INVOLVED: Ward 1 DATE OF REPORT: August 19, 2010 REPORT NO.: DTS-10-156 SUBJECT: CIVIC DISTRICT PARKING STRUCTURE DEBENTURE RECOMMENDATIONS: That Council authorize an increase in the maximum amount to be debentured for the Civic District Parking structure from $2,195,000 as per the original business case and approved capital budget forecast to $5,803,282 in 2011; and further, That Council consider the potential to reduce the actual amount of the debenture through the allocation of parking development charges as part of the 2011 budget process. BACKGROUND: Council approved the expansion and renovation of the existing Main Library in October 2008. In addition, in March 2009 Council approved the construction of a 412 space, three level, underground parking garage to address the Library's parking needs and the parking needs of our partners, which include the Region of Waterloo and the Ministry of the Attorney General. With Council’s approval, the design contract was awarded to Levitt Goodman Architects in association with The Walter Fedy Partnership and Phillip G. Carter Architect in May 2009. Previous construction cost estimates presented to Council have been based on 50% detailed design as prepared by Hanscomb Limited. The purpose of this report is to request funding approval of the Civic District Parking Structure based on the tender amount. REPORT: The consortium of Levitt Goodman Architects, Phillip G. Carter Architect and The Walter Fedy Partnership was chosen for the Library and garage design. Tenders have closed and a ïî ó ï recommendation for award will be brought to the September 7, 2010 Council meeting for consideration. While the original budget identified in the business case projected a cost of $18,540,000 it became apparent during the detailed design that costs would rise due to four significant factors which included: The development of two access ramps to accommodate the linear nature of the garage and future expansion Expanded stairwells/elevators to accommodate users ultimate destinations but also peak vehicular and pedestrian flows from the Centre in the Square Significant infrastructure relocation due to spanning Ahrens St. This includes major electrical conduits, storm and sanitary sewers, fibre optic cable and both new and relocated LEED infiltration chambers. Extensive shoring requirements to protect the historic Gaol Wall and existing Library. In April a report, DTS 10-046, was brought forward for Councils information based on 50% detailed design. The construction estimate anticipated the total cost of the structure to be $21,690,591 compared to the business case estimate of $18,540,000. The debenture was estimated to be $4,580,884. Also not included was the impact of HST which is in excess of $400,000. The total construction estimate and relative split between the Library portion of the construction and that of the parking garage was identified by our cost consultants and formed the basis of the revised budget. Increased costs in the tender are a result of higher concrete prices as well as a variation in the split between the Library and the parking garage. In light of the tender results, at its meeting August 18, 2010, the Library Board reallocated funds within its approved project budget, adjusting its parking garage budget by $440,000. Included in the original design was the construction of a surface parking lot at Scott and Weber Sts as well as the extension of surface parking in Lot 19 towards the Centre in the Square. The purpose of these two surface lots was to help minimize the impact of reduced parking during construction, to accommodate entrance and exit ramps, define future building sites and better define pedestrian pathways. While it will be advantageous and was planned to construct these surface lots in advance of the start of construction, we can not afford them at this time. The construction of the surface lot at Scott and Weber Sts will be cancelled and the extension of the surface parking in Lot 19 will be deferred until 2012 to be coordinated with the reconstruction of Otto St which will reduce the costs by approximately $50,000. This will create challenges in the provision of parking and may result in the cancellation of some monthly parking for customers who are not prepared to relocate to other City facilities during construction. City and Regional staff will work together to accommodate Police vehicles that are displaced during construction. FINANCIAL IMPLICATIONS: Based on the low tender and the split of construction costs between the Library and Garage components of this project as calculated by the general contractor, the cost of the Civic District Parking Garage will be as follows. ïî ó î Construction $21,410,000 Architectural/Engineering fees 681,600 Public art @ 1% 214,100 Project Management @ .75% 160,575 Bell/Atria 100,000 Contingency @ 5% 1,070,500 Sub total $23,636,775 HST @ 1.76% 416,007 Total $24,052,782 Funding for this project will be provided from the following sources. Provincial cash in lieu payment $7,000,000 KPL contribution 5,285,000 Regional purchase of 100 spaces 5,264,500 * Regional generator 700,000 Parking debenture 5,803,282 Total $24,052,782 * The Regional purchase of parking spaces is scheduled to be considered by Regional Administration and Finance Committee on Sept 7, 2010. Note: A portion of this debenture may be offset by the application of DevelopmentCharge funds. The exact amount will be determined as part of the 2011 budget review. The additional design elements and the estimated split by the general contractor between the construction of the Library and garage have increased the anticipated total cost of the parking structure to $24,052,782 compared to the business case estimate of $18,540,000. The City anticipates funding $18,249,500 of the capital cost out of direct capital contributions and cash- in-lieu of parking revenues, leaving $5,803,282 to be financed by the City of Kitchener through the issuance of a debenture in 2012 compared to the initial estimate of $2,195,000. It is estimated that the increased costs of constructing the Civic District Garage will result in an additional levy impact of approximately 0.27%. CONCLUSION: The construction of the Civic District Parking Garage will allow the City to meet its obligations to the Province in the provision of 200 parking spaces in the new Provincial Courthouse, the parking generated by the Library expansion, the parking generated by Regional offices as well as event parking related to the Centre in the Square. With the approval of this debenture and the award of the tender, construction on the parking garage will commence in late 2010 and be completed by the fall of 2012. ACKNOWLEDGED BY: Jeff Willmer, Interim General Manager Development and Technical Services ïî ó í