HomeMy WebLinkAboutFin & Corp Svcs - 2010-08-23FINANCE AND CORPORATE SERVICES COMMITTEE
AUGUST 23. 2010 CITY OF KITCHENER
The Finance and Corporate Services Committee met this date commencing at 1:25 p. m.
Present: Councillor B. Vrbanovic -Chair
Mayor C. Zehr and Councillors J. Smola, J. Gazzola, K. Galloway and C. Weylie.
Staff: C. Ladd, Chief Administrative Officer
D. Chapman, General Manager, Financial Services
T. Speck, General Manager, Corporate Services
J. Willmer, Interim General Manager, Development & Technical Services
P. Houston, General Manager, Community Services
J. McBride, Director, Transportation Planning
R. Regier, Executive Director, Economic Development
H. Gross, Director, Project Administration & Economic Investment
R. Gosse, Director, Legislated Services & City Clerk
J. Witmer, Director of Operations
S. Adams, Director, Community & Corporate Planning
S. Turner, Director, By-law Enforcement
C. Fletcher, Director, Facilities Management
M. Selling, Director of Building
L. MacDonald, Director of Legal Services & City Solicitor
D. Murray, Manager, Client Services
R. Lebrun, Manager, Accounting
S. Allen, Manager, Engineering Design & Approvals
L. Gordon, Chief Purchasing Officer
P. Harris, Manager of Licensing
S. Saleh, Supervisor, Collections & Payment Processing
C. Tasker, Performance Measurement /Internal Auditor
J. Billett, Committee Administrator
CRPS-10-128 -EXEMPTION TO CHAPTER 450 (NOISE) OF THE MUNICIPAL CODE
- THE FATHER'S HOUSE CHURCH -AUGUST 28. 2010
The Committee considered Corporate Services Department report CRPS-10-128, dated
August 10, 2010 concerning a noise exemption request for a special event.
It was noted in the agenda that any recommendation from this Committee will be considered at
the special Council meeting to be held later this date.
On motion by Councillor J. Gazzola -
itwas resolved:
"That an exemption to Chapter 450 (Noise) of the City of Kitchener Municipal Code be
granted to The Father's House Church for their "Love Your City" event at Victoria Park
on August 28, 2010, between the hours of 11:00 a. m. and 5:00 p. m."
CRPS-10-129 -EXEMPTION TO CHAPTER 450 (NOISE) OF THE MUNICIPAL CODE
- DOON PIONEER PARK COMMUNITY ASSOCIATION
- SEPTEMBER 11.2010
The Committee considered Corporate Services Department report CRPS-10-129, dated
August 10, 2010 concerning a noise exemption request for a special event.
It was noted in the agenda that any recommendation from this Committee will be considered at
the special Council meeting to be held later this date.
On motion by Councillor J. Gazzola -
itwas resolved:
"That an exemption to Chapter 450 (Noise) of the City of Kitchener Municipal Code be
granted to the Doon Pioneer Park Community Association for their annual outdoor
concert and festival to be held on September 11, 2010, between the hours of 2:00 p.m.
and 10:00 p. m."
FINANCE AND CORPORATE SERVICES COMMITTEE
AUGUST 23. 2010 - 117 - CITY OF KITCHENER
3. CRPS-10-130 -EXEMPTION TO CHAPTER 450 (NOISE) OF THE MUNICIPAL CODE
- CONESTOGA STUDENTS INC. -SEPTEMBER 18, 2010
The Committee considered Corporate Services Department report CRPS-10-130, dated
August 10, 2010 concerning a noise exemption request for a special event.
Councillor J. Gazzola asked what steps have been taken to alleviate neighbourhood concerns
given past experience of complaints resulting from a similar type event at this location. Mr. S.
Turner advised that staff is working with the student organizers in planning of this event, noting
that the stage is to be positioned to the back of the College grounds near Highway 401 away
from the residential area. Staff is also working with the sound technicians to address music
levels and By-law Enforcement staff will be on site and in the neighbourhood during the event
to address any concerns as they may arise. Mr. Turner added that the Lower Doon
Neighbourhood Association will be assisting event organizers in distribution of flyers to give
advance notice to the residential area.
On motion by Councillor J. Gazzola -
itwas resolved:
"That an exemption to Chapter 450 (Noise) of the City of Kitchener Municipal Code be
granted to Conestoga Students Inc. for an outdoor concert at Conestoga College on
September 18, 2010, between the hours of 6:00 p. m. and 11:00 p. m."
4. CRPS-10-131 -EXEMPTION TO CHAPTER 450 (NOISE) OF THE MUNICIPAL CODE
- K-W OKTOBERFEST EVENTS -OCTOBER 2 - 16, 2010
The Committee considered Corporate Services Department report CRPS-10-131, dated
August 10, 2010 concerning a noise exemption request for a series of events related to
Oktoberfest celebrations.
On motion by Councillor J. Gazzola -
itwas resolved:
"That an exemption to Chapter 450 (Noise) of the City of Kitchener Municipal Code be
granted to K-W Oktoberfest Inc. for a series of events being held at various clubs
between October 2 and October 16, 2010, as outlined in the letter from K-W Oktoberfest
Inc., dated July 14, 2010, attached to Corporate Services Department report CRPS-10-
131."
CRPS-10-134 -EXEMPTION TO CHAPTER 450 (NOISE) OF THE MUNICIPAL CODE
- KITCHENER MASJID -SEPTEMBER 10 OR 11, 2010
The Committee considered Corporate Services Department report CRPS-10-134, dated
August 12, 2010 concerning a noise exemption request for a special event.
It was noted in the agenda that any recommendation from this Committee will be considered at
the special Council meeting to be held later this date.
On motion by Councillor J. Gazzola -
itwas resolved:
"That an exemption to Chapter 450 (Noise) of the City of Kitchener Municipal Code be
granted to The Kitchener Masjid, at 1017 Victoria Street North for their Eid Carnival on
September 10 or 11, 2010, between the hours of 10:00 a. m. and 8:00 p. m."
CRPS-10-126 -FAIR OR EXHIBITION GAMING EVENT LICENCE FOR KITCHENER-
WATERLOO OKTOBERFEST
The Committee considered Corporate Services Department report CRPS-10-126, dated
August 9, 2010 concerning issuance of a Provincial Lottery License for an event related to
Oktoberfest celebrations.
FINANCE AND CORPORATE SERVICES COMMITTEE
CRPS-10-126 -FAIR OR EXHIBITION GAMING EVENT LICENCE FOR KITCHENER-
WATERLOO OKTOBERFEST (CONT'D)
It was noted in the agenda that any recommendation from this Committee will be considered at
the special Council meeting to be held later this date.
On motion by Councillor J. Gazzola -
itwas resolved:
"That the City of Kitchener has no objection to a Provincial Lottery Licence being issued
to Kitchener-Waterloo Oktoberfest to hold a Fair or Exhibition Gaming Event from
October 8 to October 16, 2010 at Bingeman's Marshall Hall, 425 Bingemans Centre
Drive, Kitchener."
CRPS-10-127 -LIQUOR LICENCE REVIEW APPLICATION
- MON AMI PIZZA CAFE - 151 CHARLES STREET WEST
The Committee considered Corporate Services Department report CRPS-10-127, dated
August 9, 2010 concerning issuance of a liquor licence for the Mon Ami Pizza Cafe at 151
Charles Street West.
On motion by Councillor J. Gazzola -
itwas resolved:
"That subject to the applicant entering into an agreement with the City including certain
conditions of operating a licensed establishment as set out below, Council take no
action to oppose the application for a liquor license for Mon Ami Pizza Cafe, located at
151 Charles Street West, Unit R-12, applied for by Velimir Bijelic (herein referred to as
the "Applicant"); and further,
That the Mayor and Clerk be authorized to enter into an agreement with the applicant
should he be willing wherein the applicant agrees to abide by the following conditions
and to request they be added to his licence if the Alcohol and Gaming Commission of
Ontario chooses to issue the licence:
1. to post in a conspicuous place and abide by the Downtown Licensed Establishments
Code of Conduct;
2. to become an active member of the Downtown Kitchener Business Improvement
Association's License and Entertainment Committee and attend its meetings;
3. to abide by a set 30% monthly ratio of alcohol sales to gross refreshment sales
(including food and other sundries) in other words alcohol sales will be limited to
30% of gross refreshment sales;
4. to stop serving alcohol by 12:01 a. m. daily in the first year of operation and
thereafter to stop serving alcohol by 2:00 a. m. daily;
5. to notify the Clerk of the City of Kitchener in writing of any application to change the
license at the time the application for the change is made to the Alcohol and Gaming
Commission, and not to expand the establishment without the consent of the City's
Council;
6. to comply with the Noise By-law and the Region of Waterloo Smoking By-law; and
7. these conditions shall bind all successors, assigns and subsequent licence holders
(if any)."
CRPS-10-135 -AMENDMENT TO CHAPTER 530 (DOGS) OF THE MUNICIPAL CODE
The Committee considered Corporate Services Department report CRPS-10-135, dated
August 12, 2010 requesting an amendment to Chapter 530 (Dogs) of the Municipal Code to
provide By-law Enforcement Officers the right to enter premises for the purpose of inspection
at all reasonable times.
On motion by Councillor J. Gazzola -
itwas resolved:
"That the draft by-law attached to Corporate Services Department report CRPS-10-135
be enacted to amend Chapter 530 (Dogs) of The City of Kitchener Municipal Code."
FINANCE AND CORPORATE SERVICES COMMITTEE
CRPS-10-136 -AMENDMENT TO CHAPTER 408 (ANIMALS -REGULATION)
OF THE MUNICIPAL CODE
The Committee considered Corporate Services Department report CRPS-10-136, dated
August 12, 2010 requesting an amendment to Chapter 408 (Animals -Regulation) of the
Municipal Code to provide authorized persons the right to enter premises for the purpose of
inspection at all reasonable times.
On motion by Councillor J. Gazzola -
itwas resolved:
"That the draft by-law attached to Corporate Services Department report CRPS-10-136
be enacted to amend Chapter 408 (Animals -Regulation) of The City of Kitchener
Municipal Code."
10. CRPS-10-132 -ISSUANCE OF EXTENSION OF USE REFRESHMENT VEHICLE LICENCE
- KENNY'S BAR & GRILL - 347 LANCASTER STREET WEST
The Committee considered Corporate Services Department report CRPS-10-132, dated
August 11, 2010 concerning issuance of an Extension of Use Refreshment Vehicle Licence to
permit operation of a hot dog cart at 347 Lancaster Street West.
Ms. P. Harris advised that certain conditions were applied to the Place of Refreshment Licence
for this location as a result of a Licensing Hearing, one of which was to close and vacate all
outside patios by 11:00 p.m., Sunday to Thursday and by 1:00 a. m. on Friday and Saturday.
She noted that complaints concerning noise from the business and from barking dogs have
been received but no charges have been laid. To address neighbourhood concerns regarding
the addition of a hot dog cart operation, staff is recommending a condition that aligns with the
closing of outdoor patios to provide that the cart be closed and removed by no later than 11:00
p. m., Sunday to Thursday and no later than 1:00 a.m. on Friday and Saturday.
Mr. S. Turner advised that complaints regarding barking dogs have subsided and concerns of
noise from the business have been monitored and the business operator found to be in
compliance with the conditions of the licence. Ms. Harris added that if the request to add the
hot dog cart operation is approved and problems subsequently arise, a Licensing Hearing can
be convened and Council would have the right to decide to revoke the licence if deemed
appropriate.
It was noted in the agenda that any recommendation from this Committee will be considered at
the special Council meeting to be held later this date.
On motion by Councillor K. Galloway -
itwas resolved:
"That an Extension of Use Refreshment Vehicle Licence be granted to Kenny's Bar &
Grill, located at 347 Lancaster Street West, with the following condition:
The refreshment vehicle must be closed and removed no later than 11:00 p. m.
Sunday to Thursday and no later than 1:00 a. m. on Friday and Saturday."
11. CRPS-10-125 -HOUSEKEEPING AMENDMENTS TO CHAPTER 25 (COUNCIL
PROCEDURES) OF THE MUNICIPAL CODE
The Committee considered Corporate Services Department report CRPS-10-125, dated
August 3, 2010 requesting a number of housekeeping amendments to Chapter 25 (Procedure)
of the Municipal Code, as outlined in Appendix "A" to report CRPS-10-125.
Councillor K. Galloway requested that section 25.4.1 (Seating at Council Table) be removed
from Appendix "A" and any decision to delete this section for purpose of invoking a permanent
seating arrangement, based on the numerical numbering of Wards, be made by the new
Council.
FINANCE AND CORPORATE SERVICES COMMITTEE
11. CRPS-10-125 -HOUSEKEEPING AMENDMENTS TO CHAPTER 25 (COUNCIL
PROCEDURES) OF THE MUNICIPAL CODE (CONT'D)
Mayor C. Zehr questioned the potential for the Council-Elect to make a decision in this matter
at the Striking Committee meeting to be held prior to the Inaugural meeting. Mr. R. Gosse
advised that during review it was determined that the current practice of drawing lots did not
make logical sense; whereas, the proposed seating arrangement would provide for Ward
Councillors to sit clockwise around the Council Table in a manner that would mirror the
geographical pattern of the designated Wards. He stated that a decision is requested at this
time to provide for seating arrangements to be in place prior to the Inaugural meeting. He
added that the Striking Committee has no authority to amend the Council Procedural By-law
and only the new Council, after taking the Oath of Office, would have that right. Following
further discussion, Mr. Gosse suggested that the proposed amendment be removed at this
time and he would bring the matter back at an appropriate time for consideration of the new
Council.
Councillor B. Vrbanovic referred to the proposed amendments in respect to all members of
Council sitting on all three Standing Committees, questioning if it would still be possible for the
new Council to change this arrangement in the event a reduced membership is deemed more
appropriate for the functionality of these meetings. Mr. Gosse advised that the purpose of the
proposed amendments is to reflect current practice and the new Council would have the right
to make change, if deemed necessary.
Councillor J. Gazzola requested clarification of the proposed amendment related to removal of
the definition of a "two-thirds vote". Mr. Gosse advised that there are two instances in which a
two-thirds vote is required and an explanation of each instance is provided in the relevant
section of the By-law. Accordingly, defining a "two-thirds vote" in the "Definitions" section of the
Procedural By-law is considered to be duplication.
On motion by Mayor C. Zehr -
itwas resolved:
"That Chapter 25 of the Municipal Code (Procedure) be amended as outlined in
Schedule 'A', attached to Corporate Services Department report CRPS-10-125, save
and except section 25.4.1 (Seating at Council Table) which is to be decided by the new
Council."
12. DTS-10-156 -CIVIC DISTRICT PARKING STRUCTURE DEBENTURE
The Committee considered Corporate Services Department report CRPS-10-156, dated
August 19, 2010 requesting authorization to increase the maximum amount to be debentured
for the Civic District Parking structure and that, as part of the 2011 budget deliberations,
consideration be given to the potential to reduce the actual amount of the debenture through
allocation of parking development charges.
Mr. J. McBride advised that the maximum amount to be debentured is proposed to be
increased from $2.1 M to $5.8M, with the total project budget estimated at $24M. $18.2M is to
be funded from capital contributions from the Provincial Ministry of the Attorney General, the
Kitchener Public Library (KPL) and the Region of Waterloo, all partners to the project, leaving
$5.8M to be financed by the City. The increased amount is due to increased construction
costs related to the addition of various design elements; impact of HST; and a shift in the
budget estimate between the Library portion of construction and the construction of the parking
garage. Mr. McBride stated that the tender results are a reflection of the current bidding
climate and the increased debenture amount is expected to have an additional levy impact of
0.27%. He added, however, that it is proposed to pursue reduction of the debenture amount
during the 2011 budget deliberations through allocation of parking development charges to this
project. Mr. McBride advised that a recommendation concerning awarding of the tender will be
brought forward for consideration at the September 7, 2010 Council meeting.
Councillor J. Gazzola raised concerns with the increased costs, questioning why they were not
known prior to this date and suggesting that given the substantial changes made in design
discussion should have taken place prior to proceeding with same. Mr. J. Willmer advised that
staff had brought forward a report in April 2010 to alert Council to the changes in design, the
FINANCE AND CORPORATE SERVICES COMMITTEE
12. DTS-10-156 -CIVIC DISTRICT PARKING STRUCTURE DEBENTURE (CONT'D)
exact costing of which was unknown but which has since been derived; and at the earliest
possible opportunity, staff has brought the information forward.
Councillor J. Gazzola requested explanation of the $460,000 attributed to HST. Mr. D.
Chapman advised that the City is eligible to claim 78% return of the HST and the amount
shown represents the remaining 22% that the City will have to pay. Councillor Gazzola also
requested clarification of the 0.27% levy impact and Mr. McBride advised that this figure
represents the net increase in costing over the original project budget identified in the business
case. Councillor Gazzola inquired if the Region of Waterloo is contributing sufficient funding
for their portion of the project. Mr. McBride advised that originally the Region was to contribute
$4.7M to the project for purchase of 100 parking spaces in the garage and on completion of
the design phase the amount was increased to $5.6M. He added that the Region requested
addition of an emergency generator room estimated at $700,000; however, the low tender bid
for this element came in at $300,000. Notwithstanding, the Region has agreed to pay the full
$700,000. in recognition that their parking needs are in part contributing to the need for the
parking garage and therefore, should bear some of the costs of the construction. Mr. McBride
suggested that this, together with the land provided by the Region, brings their total
contribution close to the''/4 M mark of the total project costs. In contrast, the Provincial Ministry
is making acash-in-lieu payment based on $3,500. per parking space, and instead of parking
on site will pay full market rental fees for 200 spaces in the Charles/Benton parking garage.
Mayor C. Zehr requested clarification of the difference in percentage of contingency between
the City at 5% and the Library at 15%. Ms. S. Lewis, CEO-KPL, advised that the amount of
contingency is driven by the risks associated in renovating an existing, older building for which
unexpected costs are anticipated. It was noted that on tender results the KPL adjusted its
parking garage budget by $440,000. out of a total savings of $900,000., the remainder of
which is to be added to the contingency increasing the percentage from 15% to 17-18%.
Mayor Zehr inquired what would have been done if the tender resulted in the Library portion of
the construction coming in over budget. Ms. Lewis advised that a list of potential deletes was
identified for the purpose of reducing the tender amount in the event of an overage and the
KPL Board would also consider means to reduce the contingency and any other project budget
lines to off-set a shortfall.
Councillor J. Gazzola questioned how the increased debenture is to be dealt with. Mr. D.
Chapman advised that the debenture itself would not be issued until 2011, with construction to
take place during 2011-2012; and at this time, staff is seeking approval to debenture the full
amount of the City's portion of costs, and consideration of the potential to reduce that amount
during the 2011 budget deliberations through allocation of parking development charges.
Councillor Gazzola stated that he could not support the recommendation this date but intended
to seek further understanding of the proposal prior to making a final decision at the September
7, 2010 Council meeting.
Mayor Zehr commented that while the risks associated in renovating an older building and
need for a buffer is understood, he suggested that the KPL Board should place greater scrutiny
on spending of its contingency funds to ensure they are utilized appropriately and as much as
can be, is repatriated back to the City's portion of the parking garage. Councillor K. Galloway
commented that the KPL Board had struggled with the concept of returning the whole, or
portion thereof, of the total savings and she expressed the opinion the Board's intention is not
to spend the contingency funds except where needed to mitigate the associated risks of
renovation. Mayor Zehr suggested that amind-set should be established whereby the
additional dollars added to the original KPL contingency should be looked upon as though they
do not exist. Councillor B. Vrbanovic commented that the fact the tender results for the Library
portion has come in under-budget speaks to the work of the KPL Board and its volunteers in
keeping their portion of the project within budget and he suggested the Board will continue to
operate in a fiscal manner, with any remaining funds to be returned as is the case for any City
capital project that on close-out has surplus funds. Councillor Vrbanovic stated that it is
important to keep in mind that the KPL Board is a separate body and is responsible for over-
sight of its budget. He suggested that notwithstanding the City contributes to the Library
budget, it is not within Council's purview to direct how the monies should be spent.
FINANCE AND CORPORATE SERVICES COMMITTEE
12. DTS-10-156 -CIVIC DISTRICT PARKING STRUCTURE DEBENTURE (CONT'D)
On motion by Councillor K. Galloway -
itwas resolved:
"That an increase in the maximum amount to be debentured for the Civic District
Parking structure be authorized from $2,195,000 as per the original business case and
approved capital budget forecast to $5,803,282 in 2011; and further,
That the potential to reduce the actual amount of the debenture through the allocation of
parking development charges be considered as part of the 2011 budget process."
Councillor J. Smola assumed the Chair at this time.
13. CRPS-10-133 -CONSOLIDATED MAINTENANCE FACILITY (CMF) TELEPHONE SYSTEM
AND CITY OF KITCHENER TELEPHONE SYSTEM UPGRADE STRATEGY
The Committee considered Corporate Services Department report CRPS-10-133, dated
August 11, 2010 outlining a strategy for replacement of the City's existing ROLM PBX
telephone system with a fully integrated Voice over Internet Protocol (VoIP) system.
Mr. D. Murray presented background information leading to the most recent review of the
City's telephone system and the rationale in recommending the City pursue installation of a
VoIP system. Alternative approaches were explored including: maintaining status quo;
installation of a traditional PBX system; or contract for Hosted VoIP Services. The alternatives
explored are not recommended based on a number of factors, including but not limited to:
diminishing local support of the existing ROLM system; a disappearing market for traditional
PBX systems; and Hosted VoIP Services being geared more toward small and medium sized
businesses, negating the benefits of converged communications in large environments such as
the City's and which raise issues of privacy and security in respect to legislated requirements
under the Municipal Freedom of Information and Protection of Privacy Act. The strategy
provides for aphased-in installation, with Phase 1 to complete installation of a VoIP system at
the Consolidated Maintenance Facility (CMF) by June 2011; Phase 2 to upgrade remote sites
such as Fire Headquarters and Community Centres over 2011-2012; and Phase 3 to conclude
upgrades at City Hall. Mr. Murray reviewed a procurement strategy which proposes a Vendor
of Record be awarded to the successful vendor for a period of ten years. The benefits of this
approach provides for a single hardware platform over the life of the contract; a single point of
contact for resolution of issues, maintenance and upgrades/expansions; and accurate
budgeting of associated costs over the term of the contract. It was noted that the proposed
strategy fits within the CMF project timelines providing a new site for the initial installation; and
the phased-in approach lowers the risk of project failure by allowing the City to move to a full
VoIP system over time as resources and funding become available. Mr. Murray advised that a
Request for Proposal (RFP) was issued in May 2010, taking into account the needs of the
CMF and overall telecommunication needs of the City, and closed on June 25, 2010. Staff
anticipate bringing forward a recommendation to award the RFP in September 2010 and if
approved, work on the CMF installation will begin in the Fall.
Mayor C. Zehr requested clarification of the funding for this project. Mr. Murray advised that
the full project costs can be funded from within the current budget through a transfer of funds
from both the Telephone and Computer Reserve Funds. It was noted that the cost of Phase 1
(CMF) is estimated at $900,000.; Phase 2 (Remote Sites) at $400,000.; and Phase 3 (City
Hall) at $800,000. Mayor Zehr inquired as to when it is expected the City would see a
reduction in operating costs. Mr. Murray stated that with the new system maintenance will
increase somewhat but will in part be off-set by a reduction in the need for external services
from Bell Canada. He stated that he could not forecast a reduction in operating costs until such
time as all installations are complete and staff have had an opportunity to become comfortable
enough with the new system to begin assuming responsibility for its maintenance from the
vendor. Mayor Zehr inquired if there was any reason the City should not maintain the status
quo. Mr. Murray commented that while the existing ROLM PBX system is in good condition,
support for the system is quickly diminishing in Canada making it more difficult as time passes
to find external support for the system. The proposed strategy provides for apro-active
approach to replacing the existing system before the City finds itself in a position of being
unable to find technical support to maintain it.
FINANCE AND CORPORATE SERVICES COMMITTEE
13. CRPS-10-133 -CONSOLIDATED MAINTENANCE FACILITY (CMF) TELEPHONE SYSTEM
AND CITY OF KITCHENER TELEPHONE SYSTEM UPGRADE STRATEGY
(CONT'D)
Councillor J. Gazzola questioned the rationale to move from the existing system to a system
that will require increased maintenance. Mr. Murray reiterated the challenges associated with
diminishing support for the existing system, noting that the City is currently only able to buy
refurbished parts from the United States, the supply of which will dwindle and become non-
existent over time. Councillor Gazzola questioned savings to be achieved with the new system
and Mr. Murray advised that savings cannot be predicted at this time but noted that
maintenance costs will decline as support for the system transitions from the vendor to City
staff. Councillor Gazzola requested clarification of the funds available in the Telephone
Reserve Fund in comparison to the project estimates. Mr. Murray advised that the Telephone
Reserve Fund currently has a balance $1.68M; however, the intent is to also use funds from
the Computer Reserve Fund. He noted that there is sufficient funds in the Reserves to
complete all phases of the project now; however, the intent is to take aphased-in approach to
reduce risks associated with installation of a new system and allow installation to migrate out
to the remaining facilities at a comfortable pace. Councillor Gazzola referred to the inclusion of
WiFi and digital signage in the new system and questioned if the new system was needed in
order to have these products. Mr. Murray advised that one is not dependent on the other but
leveraging WiFi with the VoIP system will allow for phone mobility within City facilities. He
added that staff is investigating options for WiFi services in City Hall and the Market; however,
is of the opinion it would be beneficial to wait until they have full understanding of what comes
with the new system before proceeding further.
On motion by Councillor C. Weylie -
itwas resolved:
"That the strategy to replace the City's existing ROLM telephone system with a fully
integrated Voice over Internet Protocol (VoIP) system, as outlined in Corporate Services
Department report CRPS-10-133, be approved; and,
That staff bring a report back to Council recommending a Vendor of Record to perform
all three phases of the transition of the City's telephone system from ROLM to VoIP,
being: 1) the Consolidated Maintenance Facility; 2) Remote sites; and 3) City Hall; and
further,
That for each of the future transition phases, staff bring back to Council a report
outlining details on costs, funding and timelines for implementation, prior to proceeding."
Councillor B. Vrbanovic assumed the Chair at this time.
14. FIN-10-126- ALLOCATION OF PARKING DEVELOPMENT CHARGES
The Committee considered Financial Services Department report FIN-10-126, dated July 9,
2010 requesting allocation of parking development charges to the Charles / Benton Parking
Garage project.
Mr. S. Saleh advised that staff is recommending $6M of the $11.5M Development Charge (DC)
funds available for parking projects, be allocated to the Charles / Benton Parking Garage
project to eliminate a projected tax levy impact of 0.39% in 2011 and to reduce the projected
debt load of the City. It is also recommended that allocation of the remaining funds for parking
projects be considered for the Civic District Garage, Centre Block Garage and Charles /Water
Garage during the 2011 budget deliberations.
Councillor J. Gazzola referred to Appendix 'A' -Table 2 of the staff report and inquired of the
$52M total municipal cost in parking projects how much is related to growth and Mr. Saleh
advised that the figure equates to approximately $51 M, with 90% eligible for development
charge funds. Councillor Gazzola inquired why the total cost of $9.5M is not being covered by
development charges for this project. Mr. Saleh advised that the amount recommended
ensures elimination of a tax levy impact in 2011 and pointed out that if fully funded from
development charges it would present a cash flow issue for the reserve fund that would result
in re-prioritization of all eligible development charge projects, not just those for parking. Mr. D.
FINANCE AND CORPORATE SERVICES COMMITTEE
14. FIN-10-126- ALLOCATION OF PARKING DEVELOPMENT CHARGES (CONT'D)
Chapman further explained that interest accrued as a result of a deficit in the reserve is
allocated for coverage by the developer. He noted that the City is to recover $51 M in
development charges for parking projects over the 10 Year Forecast and cash flow is
constrained within the 10 year window, currently capped at $11.4M in 2010. He stated that if
the total $9.5M is allocated to the Charles / Benton Parking Garage it will substantially limit
options for allocation to other projects such as the Civic District Parking Garage. Councillor
Gazzola stated that it appears to be more beneficial for the taxpayer to have the DC Reserve
go into a deficit position rather than the City and Mr. Chapman agreed in that it will eliminate a
direct levy impact. He noted that the City has never issued debt in the DC Reserve, choosing
to maintain a positive balance to date. Due to the timing of other projects it is possible to issue
debt in the reserve and the City also can enter into credit refund agreements if a developer
wishes to go ahead and front-end the costs. Mr. Chapman commented that there is too much
variation at this time to fully fund the Charles / Benton Parking Garage from development
charges and suggested that consideration in context of the 2011 budget is needed in order to
prioritize remaining DC funds.
Mayor C. Zehr agreed that there are too many other projects pending, particularly in 2011, to
allocate full costs to this project and the proposal provides time to deal with the complexity of
prioritizing future allocations. He added that the proposal does result in a zero net levy impact
and it was his opinion it made sense to do so.
On motion by Mayor C. Zehr -
itwas resolved:
"That parking development charge funding of $6,000,000 be allocated to the Charles
and Benton Garage project in 2010; and,
That the Charles and Benton Garage debenture, already approved to be issued in 2010,
be reduced from $9,525,000 to $3,525,000 as a result of the allocation of parking
development charges to the project; and,
That allocation of the balance of development charge funding for the Civic District
Garage, the Centre Block Garage and the Charles/Water Garage be considered as part
of the 2011 Budget deliberations; and further,
That it is Council's intention to recover any excess capacity arising out of the Charles and
Benton Garage, Civic District Garage, Centre Block Garage and Charles/Water Garage,
and available to service growth, through future development charges."
15. FIN-10-128- STIMULUS PROJECT UPDATE -AUGUST 2010
The Committee considered Financial Services Department report FIN-10-128, dated August
18, 2010 which provides an update on the status of stimulus funding projects.
Mr. D. Chapman advised of variances in the summary of project status and planned project
timeline appendices from commencement one year ago, with some projects not advancing due
to uncontrollable factors, or time of year, and some projects slightly behind schedule; however,
project managers have confirmed that each project going forward is on track for completion by
the March 31, 2011 deadline. Mr. Chapman referred to the issue of release of holdbacks
which has now been considered and a decision made by the senior government wherein all
holdbacks information must be submitted with the final claim by April 15, 2011 and the
holdback must be released no later than March 31, 2012, except for RInC projects which have
a release deadline of June 30, 2011. Staff will ensure the holdbacks are retained as long as
possible but released before the deadline to ensure no loss of funding. Mr. Chapman
conveyed one other matter of issue pertaining to a request for an extension from April 15 to
June 30, 2011 for submission of the final report for the Consolidated Maintenance Facility
(CMF) project. He noted that staff have been advised by senior government representatives
that the request has not yet been considered but has been forwarded to the Infrastructure
Stimulus Fund (ISF) Management Committee. Mr. Chapman stated that he believed there are
similar requests being made by other municipalities and they will continue to pursue this
matter. He asked that Council also consider giving assistance from a political level to resolve
FINANCE AND CORPORATE SERVICES COMMITTEE
AUGUST 23. 2010 - 125 - C
15. FIN-10-128- STIMULUS PROJECT UPDATE -AUGUST 2010 (CONT'D
this issue
Mayor C. Zehr noted that in respect to the issue of reporting deadlines for the CMF project, he
has had discussion with local MPP, John Malloy, who is also following up on this matter and
Mayor Zehr was confident a resolution would be reached.
Councillor J. Gazzola noted that no bids were received on closing of the seating tender for the
Centre In The Square improvement project and questioned how this portion of the project is to
proceed. Mr. Chapman advised that Purchasing staff has gone back to the bidders to consider
revised bids and the timeline for this portion of the project will have to be adjusted. Mayor Zehr
added that he had talked with Jamie Grant, General Manager of the facility and an alternate
installation plan is being developed for off hours /off season. Councillor Gazzola requested
clarification of Project #5 of Appendix "A" for the CMF improvements. Ms. C. Fletcher advised
these relate to structural enhancements, including such things as installation of a geo-thermal
system and cistern. She commented that these elements will produce significant energy
enhancements and will provide for at minimum a LEED Silver designation.
Councillor K. Galloway questioned if there is any concern in respect to those projects that are
behind schedule. Mr. Chapman advised that while timelines are tight, project managers are
meeting regularly to review the progress of each project. In respect to RInC projects, Ms.
Fletcher advised that the majority of work for the Energy Management Systems project was in
the design phase and the actual installation will go quickly and be completed before the end of
the calendar year. In respect to the Acquatic Facility projects, Ms. Fletcher reminded of the
delay in starting due to confusion as to which projects actually received funding approval. She
stated that project managers have reviewed timelines on numerous occasions and are
confident these can meet the March 2011 deadline. Mr. S. Allen spoke to the Sewer and
Water Main Rehabilitation project, advising that both tenders have been awarded and apre-
construction meeting is scheduled for August 24, with construction to start late August-early
September and can be finished by the March 2011 deadline.
Ms. C. Ladd provided a visual presentation of stimulus supported projects, including: Centre
In The Square upgrades; McLennan Park development; CMF development; stormwater
infrastructure rehabilitation; sewer/watermain rehabilitation; Sportsworld Arena improvements;
and King Street streetscape improvements. It was noted that this is not a comprehensive
overview of all projects, with some still in the design phase or which have not received funding
but are direct spin-off projects. Ms. Ladd also provided a visual presentation of various projects
supported through the City's Economic Development Investment Fund (EDIF), together with
statistical data that shows a July unemployment rate of 7.3%, down from a high of 10.1% in
February; and local employment growth of 4,500 in July bringing year-to-date gains to a total of
24,300. Ms. Ladd also expressed thanks to staff, commenting on the substantial work that they
are currently juggling over and above normal workloads in respect to stimulus projects, not just
for the City, but also in the private sector and Regionally.
Mr. R. Regier spoke to the employment statistics, noting that from June 2009 to present no
other City of similar size in Canada or the United States has added more employment than in
this Region and the area is showing remarkable recovery from pre-recession levels. He stated
that employment growth is up by 8,500 from pre-recession levels in 2008 and in the last 6
months, by 4,500 including within the manufacturing sector. Building permits in the last 6
months are also up by 68%, with 134 issued for institutions; 121 for industrial; and 109 for
commercial.
Mayor Zehr referred to the new Courthouse as one project not supported by stimulus funding
that is currently underway and has had an impact on staff workload. He questioned if
information can be provided in respect to the value of this construction and schematics of the
building design. Mr. J. Willmer advised that staff will provide the information requested and
noted that a report on this project is to come forward in the next few months. He added that
the Province has indicated a desire to pursue above normal standards in respect to design of
this project.
FINANCE AND CORPORATE SERVICES COMMITTEE
16. CRPS-10-057 -CONSOLIDATED MAINTENANCE FACILITY (CMF)
- PROJECT UPDATE -AUGUST 2010
The Committee considered Corporate Services Department report CRPS-10-057, dated
August 18, 2010 providing an update on the status of the Consolidated Maintenance Facility
(CMF) project from April to August 2010.
Ms. P. Houston highlighted the construction process, noting that the construction schedule is
currently slightly behind; however, the project team is confident that the overall project
schedule can be achieved through various construction activities taking place simultaneously
on site. She advised that the construction tender process is 95% complete and staff is
confident the project will be completed within budget. Ms. Houston also noted that 75% of the
total dollar value of contracts has been awarded to local companies within the Region.
Councillor J. Gazzola asked how far behind the project schedule is and was advised
approximately 2 to 3 weeks. Councillor Gazzola inquired as to the feasibility of obtaining an
estimate for the construction components to compare to tender prices. Ms. P. Houston
advised that a line by line estimate would be difficult as various components are being
managed through various tenders; as well, change orders will be considered as construction
progresses resulting in price changes due to variable pricing of certain components, such as
gas and asphalt pricing. Councillor Gazzola requested clarification of the total budget for the
CMF project. Ms. Houston advised that $48M is the base budget for the project to which $14M
in stimulus funding has been added; and under a separate project $4M is budgeted for the
solar roof.
17. FIN-10-139- INTERIM FINANCIAL STATEMENTS AS OF JUNE 30, 2010
The Committee considered Financial Services Department report FIN-10-139, dated August
17, 2010 which provides an update on City expenditures and revenues compared to the 2010
budget and explains significant variances.
Mr. R. LeBrun advised that staff have identified a potential year-end deficit of $2.5M,
representing a negative variance of 1.8% on a $138M annual operating budget. Key variances
include: anticipated overages in the Operations Division, primarily for increased road
maintenance due to milder winter conditions and down time associated with vehicle
breakdowns; and in Corporate Services, a shortfall in parking fine revenues in By-law
Enforcement and unbudgeted retroactive pay adjustments in Facilities Management /Legal
Services. These are off-set somewhat by increases in Planning /Engineering permit and sign
revenues; and parking revenue increases related to delayed closing of the Library lot and
higher demand in hourly and monthly parking. Other areas impacting year-end estimates that
require close monitoring include: supplementary taxes and tax rebates/refunds/reductions;
investment income; and gapping. Mr. LeBrun advised that in light of a projected deficit, and
insufficient funds in the Tax Stabilization Reserve to off-set a large deficit, staff is taking action
to mitigate the amount of deficit through: similar policies established in 2009 intended as
guidelines for decision making in day to day work with the goal of reducing expenses; review of
existing capital projects to identify potential close-out of unexpended capital balances; and
review of the gapping policy to determine any necessary adjustment. Mr. LeBrun then provided
an overview of activities related to: Building Enterprise; Golf Courses; Water and Sanitary
Sewer Utilities; Gas Utility; Investment Income; and Taxes Receivable, as outlined in
Schedules 2 to 9 of report FIN-10-139.
Councillor J. Gazzola requested clarification of the estimated $470,000. overage in the
Operations Division, commenting that he would expect it to be less due to a milder winter. Mr.
J. Witmer pointed out that only half of the 2010 winter season is complete, with the front end
milder and the year-end yet to come. He stated that staff anticipates costs similar to the
average and is not projecting positive outcomes other than where currently existing. He
pointed out that when winter maintenance lessens staff resources are deployed to other work,
which includes such things as road maintenance, increased litter pick-up and vehicle
maintenance. He added that staff is also handling a substantial increase in construction work
due to the stimulus funding program.
Councillor Gazzola requested clarification of the City's deficit addressed in 2009 and was
advised that the final deficit figure to be addressed in 2009 was $276,000., down from $4.5M
FINANCE AND CORPORATE SERVICES COMMITTEE
17. FIN-10-139 - INTERIM FINANCIAL STATEMENTS AS OF JUNE 30, 2010 (CONT'D1
prior to review of capital close-outs and budget corrections. Mr. Chapman advised that staff
will again be looking at capital projects for potential close-out of unexpended balances;
however, the amounts will not be to the same scale as realized in 2009.
Councillor Gazzola requested clarification as to why retroactive pay adjustments were
unbudgeted. Mr. Chapman advised that these relate to staff positions whose job descriptions
are being reviewed, and currently there is a substantial back-log delaying the process. He
stated that pay adjustments are not budgeted for so as not to pre-suppose review outcomes.
Councillor Gazzola inquired as to the extent of the backlog. Ms. C. Ladd advised that
approximately 400 positions are waiting to be reviewed and it has been recognized that with
only one staff person responsible for review/writing new job descriptions it is impossible to
manage the backlog. Accordingly, a temporary position has been approved to assist in
addressing the backlog and senior staff is working to develop strategy to address the issue of
future retroactive pay adjustments through creation of a reserve fund.
Councillor B. Vrbanovic raised concerns with the number of positions to be reviewed. Ms. C.
Tasker advised that the process for job review is being looked at with the goal to avoid similar
backlog in future. She pointed out that any job description written prior to hiring of the
Classification Writer in 2004 requires updating and takes time to review and re-write given
some are quite lengthy and language used is inconsistent. Ms. Ladd added that while the City
has a policy that provides for job positions to be reviewed within a certain period of time, some
positions have not been reviewed since inception of the current job review process in the
1980's, contributing to the backlog in job reviews. Councillor Vrbanovic inquired if this presents
a potential problem from a financial point of view and Ms. Tasker advised that not all would be
subject to retroactive pay adjustments. Councillor Vrbanovic requested clarification as to what
adjustments would be evaluated on and the potential impact. Ms. Ladd suggested that a
presentation be made at a future meeting by Human Resources staff as they have better
knowledge and expertise in which to respond.
Councillor J. Gazzola requested clarification as to policy regarding surplus funds in the
Building Enterprise. Mr. M. Selling advised that currently there is no policy on a minimum or
maximum amount. He stated that a report was brought forward 2 years ago to consider
whether it should be 100% or 150% of direct costs; however, a decision was delayed pending
the outcome of economic downturn in 2008 on the premise that staff would be in a better
position to know at that time what would be appropriate to recommend.
Councillor Gazzola raised concerns regarding the substantial variances in Golf Course
Canteen Operations. Ms. P. Houston advised that this is impacted by the volume of
tournament activity and is also attributable to the timing of purchasing items for the canteens.
She stated that this corrects itself in the latter part of the budget year when volumes are
realized.
Councillor Gazzola referred to the average yield on investment balances for Pooled Investment
Funds at 2% versus the City's yield at 1.02%, questioning if more should be invested here. Mr.
R. LeBrun suggested that the yield is somewhat misleading as it is based on long term rates
rather than monthly. He added that if large amounts are invested for long term but
subsequently are required prior to expiration of the term, a loss is suffered and there is also a
fee charged on investments. Mr. LeBrun advised that staff is continuing to analyze the Pooled
Investment Funds and a report will come forward at a future date.
18. ADJOURNMENT
On motion, the meeting adjourned at 4:15 p. m.
J. Billett
Committee Administrator