HomeMy WebLinkAboutFCS-10-001 - Stimulus Project Update December 2010REPORT TO:Financial & Corporate Services Committee DATE OF MEETING: December 13, 2010 SUBMITTED BY: Dan Chapman, Deputy CAO & City Treasurer PREPARED BY: Jaya Chatterjee, Junior Financial Analyst, Financial Planning WARD(S) INVOLVED: All DATE OF REPORT: December 8, 2010 REPORT NO.: FCS-10-001 SUBJECT: STIMULUS PROJECT UPDATE - DECEMBER 2010 RECOMMENDATION: That applications be submitted to extend completion deadlines from March 31, 2011 to October 31, 2011 for the following Infrastructure Stimulus Fund and Recreational Infrastructure Canada Fund projects: McLennan Park Development Upgrades to Harry Class Aquatic Facility Upgrades to Wilson/ Kingsdale Aquatic Facility; and further That, for projects receiving deadline extensions, the City of Kitchener acknowledge that the projects will be completed and costs incurred after October 31, 2011 (if any) will be the City’s sole responsibility. BACKGROUND: This report is part of a series of bi-monthly updates to the Finance and Corporate Services Committee on the status of the City’s infrastructure stimulus projects. This reflects a commitment to ensure that infrastructure funds are spent in an open, transparent, and accountable manner and that Council is afforded an opportunity to track the progress of these projects on a regular basis. This report contains additional background information for the benefit of incoming Council members. REPORT: On January 27, 2009, as part of an Economic Stimulus plan, the Federal Government designated significant funding allocations over two years for provincial, territorial, and municipal infrastructure projects under Canada’s Economic Action Plan. The main purpose of this funding allocation was to stimulate the economy and at the same time create a more modern and greener infrastructure that is the foundation of sustainable long-term growth. There were three categories of funding, namely, The Infrastructure Stimulus Fund (ISF), Green Infrastructure Fund (GIF), and the Recreational Infrastructure Canada Fund (RInC). In addition, the Federal è ó ï Government subsequently earmarked funding for a Community Adjustment Fund in Ontario with a $1 billion allocation. The main criteria for projects funded under these programs included: Projects must be complete by March 31, 2011 (with the exception of the Community Adjustment Fund which had a completion date of March 31, 2010); New construction and rehabilitation of existing assets were both eligible; Projects must be incremental (i.e. not intended to replace existing funding; and ) Projects were to be funded 1/3 by each of the Federal, Provincial and Municipal governments (with the exception of the Community Adjustment Fund which was fully funded by the Federal government). The City submitted applications for projects in all four programs. The following nine ISF projects were approved: 1. Centre in the Square Improvements ($1.2 million) 2. McLennan Park Development ($3.0 million) 3. Consolidated Maintenance Facility Improvements ($14.0 million) 4. Consolidated Maintenance Facility Solar Roof ($4.1 million) 5. Accessibility Improvements ($1.0 million) 6. City Hall Lighting ($1.0 million) 7. Energy Management Systems ($1.5 million) 8. Storm Water Infrastructure Rehabilitation ($2.07 million) 9. Sewer and Watermain Rehabilitation ($2.5 million) The following six RInC projects were approved: 10. Sportsworld Arena ($900,000) 11. Bridgeport Community Centre ($2.1 million) 12. Upgrades to Harry Class aquatic facility ($1,633,500) 13. Upgrades to the Breithaupt aquatic facility ($346,500) 14. Upgrades to the Wilson/Kingsdale aquatic facility ($495,000) 15. Upgrades to the Chicopee aquatic facility ($495,000) The following CAF project was approved: 16. King Street Rehabilitation ($1.23 million) Section 1 – Project Status Update Appendix “A” provides a summary of project status and Appendix “B” depicts the progress towards completion of each project compared to the planned timeline. Since the previous report è ó î (August 23, 2010) all projects have progressed. While some projects would appear to be behind schedule compared to the baseline prepared in mid-2009, project managers have confirmed that each project could still be completed with the permitted time frame. That said, the ability to extend completion deadlines (as discussed below) provides relief to projects where current weather conditions are not favourable to construction activity. Project managers will be in attendance at Council when this report is received and can respond to specific questions from members of Council. With improvements in the economy and the extent of stimulus investment, response to project tenders has been lower than normal on some recent closings. This presents a risk of increasing project costs. Staff will continue to manage scope of the projects to align to the estimated project cost. The City has been regularly submitting monthly claims for projects since December 2009. Section 2 – Expedited Purchasing Measures Council has previously approved a number of purchasing measures to expedite projects receiving funds under the Infrastructure Stimulus Program, while still maintaining a fair, open, and transparent procurement process. The measures, along with comments on their utilization, are outlined in Appendix “C.” Section 3 – Federal/Provincial Program Updates Despite the efforts of City staff to clarify provisions related to the release of holdbacks after March 31, 2011, it has been a challenge to obtain clarification from the Province and Federal government. As a mitigating strategy, Council authorized staff to amend agreements to release 2% holdbacks by February 15, 2011. For ISF projects, a decision with respect to holdbacks has finally been received. All final holdback information needs to be submitted with the final claim. The City will receive reimbursement for holdback payments once the City provides OMAFRA with invoices and proof of payment (cheque numbers). The holdbacks must be released before March 31, 2012 when the contribution agreement expires. Staff will ensure that holdbacks related to ISF projects are not released before the normal timeline but before the deadline of March 31, 2012 to avoid any loss of grant funding. For RInC projects, all holdbacks must be released before June 30, 2011. Section 4 – Other Information Project Completion Date On December 2, 2010, the Government of Canada announced that it would extend the construction deadline on infrastructure projects under four funding programs: the Infrastructure Stimulus Fund, the Building Canada Fund Communities Component Top-Up, the Recreational Infrastructure Canada Program, and the Knowledge Infrastructure Program. The new deadline is October 31, 2011 instead of March 31, 2011. By extending the deadline for one more construction season, the Economic Action Plan will further benefit Canadians without incurring additional government spending. è ó í In order to qualify for this extension, work must have begun on the project and it must have incurred eligible costs before March 31, 2011. Claims for all expenses incurred up to this date must be submitted by April 30, 2011. This is a one-time extension. While virtually all projects are expected to complete by October 31, 2011, the Government of Canada will not share in any costs after this date, and proponents will be required to complete projects at their own expense. The following conditions apply to project extensions: Projects must have begun work and incurred eligible costs by March 31, 2011; for these projects, the agreement signatories must submit a claim for all eligible costs incurred up to March 31, 2011 by April 30, 2011; projects for which no claims are received will not be eligible for an extension. Agreement signatories will be required to submit the following documentation by January 31, 2011 for projects requiring an extension: A list of projects that require an extension beyond March 31, 2011; o A forecast of project expenses that will be spent and federal funding that will be o claimed by March 31, 2011, and a forecast of how much will be incurred between April 1, 2011 and October 31, 2011; A detailed construction schedule for each project signed by a professional o engineer; A Council resolution committing to finish the projects, and accepting o responsibility for any costs incurred beyond October 31, 2011. Project progress reports will be required at two-month intervals during the extension period. All final claims for extended projects must be received by January 31, 2012. For projects that are not completed by October 31, 2011, agreement signatories will be responsible for project completion as well as all costs incurred after this date. Amended Contribution Agreements with the federal government, as well as (where applicable) Contribution Agreements between provincial/territorial governments and their recipients, must be signed no later than February 28, 2011. The projects identified below were scheduled to be completed by March 31, 2011. However, construction schedules have been impacted by recent unfavourable weather conditions (wet conditions in mid/late November, freezing temperatures in early December). If the project work were to continue under current conditions, the quality of workmanship may be compromised. If extensions are sought for these projects, it is anticipated that most of the remaining work will be completed in the early spring. McLennan Park Development Outstanding works that cannot be completed due to winter conditions include: asphalt paving for roads, parking & trails, concrete paving for splash pad, concrete pours for skate park bowl, great lawn area sodding and site planting. Expected ISF invoicing outstanding before the original March 31, 2011 deadline amounts to approximately $660,000 (55% of $1.2M works outstanding). The cost to the city without the extension would be approximately $440,000 (2/3 of $660,000 ISF works). All outstanding works will be completed in April/May of 2011 and will meet the extended deadline of October 31, 2011. è ó ì Upgrades to Harry Class Aquatic Facility Outstanding works that cannot be completed due to winter conditions include: exterior concrete work, vinyl pool tank membrane work, and interior finishes. The total outstanding cost before the original March 31, 2011 deadline amounts to approximately $696,000. The cost to the city without the extension would be approximately $464,000 (2/3 of $696,000). All outstanding works will be completed in April/May of 2011 and will meet the extended deadline of October 31, 2011. Upgrades to Wilson/ Kingsdale Aquatic Facility Outstanding works that cannot be completed due to winter conditions include: Installation of the drain pipe from the splash pad to the sanitary sewer connection, including concrete deck and fence repairs, playground safety surface installation, topsoil, and sodding, plantings and interior work. The total outstanding cost before the original March 31, 2011 deadline amounts to approximately $168,000. The cost to the city without the extension would be approximately $112,000 (2/3 of $168,000). All outstanding works will be completed in April/May of 2011 and will meet the extended deadline of October 31, 2011. Staff is currently reviewing the implications of the completion date extension for the Bridgeport Community Centre project in light of Council’s direction in 2010 to plan for a meeting room addition. Staff will bring forward a separate report on January 17, 2011 to provide a detailed assessment of this situation along with options for Council’s discussion and direction. There may be additional projects, which would benefit from an extension to exhaust remaining budget contingencies or provide some additional time for final completion. Staff will review progress on all projects and may bring forward additional extension requests in January. Final Report Date With the support of a Council resolution, a letter from the Mayor’s office was sent to the Minister of Agriculture, Food and Rural Affairs on June 16, 2010 to request an extension from April 15 to June 30 for the submission of the final report for the Consolidated Maintenance Facility project under the Infrastructure Stimulus Fund. For this project in particular, it would be problematic to reduce the construction timeline to meet the reporting requirement and deadline of April 15, 2011. The City received a response letter dated August 12, 2010 advising that extension requests for the submission of the final claim and all the final documentation are not being considered at this time. However, the City’s extension request was forwarded to the ISF Management Committee for its information. Staff has been in regular contact with the OMAFRA analyst and they have confirmed that there has been a tentative favourable agreement reached between the Federal and Provincial governments dealing with this timeline issue. Details on this agreement will be forthcoming once it is finalized. ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: è ó ë Foundation: Efficient and Effective Government Goal: Financial Management Strategic Direction: Invest and manage assets strategically FINANCIAL IMPLICATIONS: None at this time COMMUNITY ENGAGEMENT: To assist in ensuring the infrastructure stimulus funds are spent in an open, transparent and accountable manner, staff continues to implement the communications strategy that has been developed to assist in tracking the progress of all projects. The strategy contains various communications tools that will give residents an opportunity to follow the work that is underway on each project. Federal and provincial signage has been installed at all project sites, recognizing federal and provincial funding support; only federal signage was required to be installed for the King Street reconstruction project, as it is supported by the federal Canada Adjustment Fund; Project-specific web pages, featuring an interactive map showing all project sites, is updated on a bi-monthly basis to ensure a user-friendly way for citizens to access information on each project. The web pages include background on each project, as well as status updates as they are provided by the project managers; Project progress continue to be included in every edition of Your Kitchener; this process will continue until the projects are complete; and Media releases and/or media events are planned for the completion of each project. Media releases will be issued upon the completion of all projects and public events will be scheduled for the following projects: Aquatic Facility Upgrades CMF Solar Roof Centre in the Square McLennan Park Development Bridgeport Community Centre Sportsworld Arena Upgrade ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer è ó ê è ó é è ó è December 8, 2010 Utilization of Council-Approved Expedited Purchasing Measures Expedited Purchasing Measure Utilization The Mayor and Clerk are authorized to sign ISF Contribution agreements have been received Provincial and Federal agreements as they relate and executed after being reviewed by the City to the Infrastructure Stimulus Fund and the Solicitor. CAF letter of offer has been received and Recreational Infrastructure Canada Fund, subject executed by the City Solicitor. The first set of RInC to the satisfaction of the City Solicitor. contribution agreements have been received and executed after being reviewed by the City Solicitor. RInC contribution agreements for the recently approved four aquatic facility projects have been received and currently being reviewed by the City Solicitor. The Chief Administrative Officer is designated to For Bridgeport Community Centre, expression of award tenders on Infrastructure Stimulus Fund interest for Consultant was awarded to AECOM with projects provided that the costs are within the CAO’s approval on October 20th 2009. Cost of the projected expenses outlined in the applications award is $218,925. Total budget of the project is and they are reported to Council by way of the bi-$2,249,740. There is a tight schedule for this project monthly update report. and a delay might jeopardize the project. Province confirmed funding for this project after a delay of almost 2 months. For Sewer and Watermain Rehabilitation project, expression of interest E09-100, Consultant Services – Rehabilitation of Infrastructure on Selected Streets Using Trenchless Technology has been awarded to Conestoga-Rovers & Associates, Waterloo with CAO’s approval on December 14th 2009. Cost of the award is $257,600., including a contingency of $22,400., and G.S.T. For Breithaupt Centre project, expression of interest E10-051, Consultant Services – Breithaupt Centre Accessibility Renovations and Mechanical Upgrades has been awarded to +VG Architects, with CAO’s approval on May 06, 2010. Cost of the award is $ 59,226.30, including a disbursement of $2,690.41 and G.S.T of $2,820.30. For Storm Water Rehabilitation project, tender T10- 014, Pond 4, Pond 22 and Pond 30 Stormwater Management Facilities Retrofit has been awarded to Golder Associates - Innovative Applications GAIA Inc., with CAO’s approval on May 19, 2010. Cost of the award is $1,232,134.05, including provisional items of $104,925., and G.S.T of $58,673.05. For Harry Class Community Pool project, expression of interest E10-025, Expression of Interest for è ó ç December 8, 2010 Consultant Services has been awarded to John MacDonald Architect Inc., with CAO’s approval on May 19, 2010. Cost of the award is $102,590, including a disbursement of $2,000, and G.S.T. of $4,790. For Bridgeport Community Centre project, expression of interest E10-112, Expression of Interest for Construction Management firm has been awarded to Nith Valley Construction (2008) Ltd., with CAO’s approval on October 12, 2010. Cost of the award is $734,500, including H.S.T. of $84,500. For Centre in the Square project, T10-095, Refurbish Audience Seating has been awarded to Custom Cabinets, with CAO’s approval on October 15, 2010. Cost of the award is $378,598.59, including H.S.T. of $43,555.59. For Harry Class RInC project, T10-099, Harry Class Pool - Change House & Pool Deck has been awarded to Dakon Construction Ltd., with CAO’s approval on October 22, 2010. Cost of the award is $1,618,329.50, including H.S.T. of $186,179.50. For Energy Management Systems project, T10-106, Replacement of Existing Building Automation Systems has been awarded to ESC Automation Ltd., with CAO’s approval on October 8, 2010. Cost of the award is $304,422.51, including H.S.T. of $35,022.06. For Energy Management Systems project, T10-107, Installation of New Building Automation Systems has been awarded to TAC Controls & Automation Inc., with CAO’s approval on October 8, 2010. Cost of the award is $183,486, including H.S.T. of $21,109. For Centre in the Square project, T10-108, Sound System has been awarded to Westbury National Show Systems Ltd, with CAO’s approval on October 15, 2010. Cost of the award is $157,418, including H.S.T. of $18,110.04. For Centre in the Square project, T10-109, Lighting & Rigging has been awarded to Westbury National Show Systems Ltd, with CAO’s approval on October 15, 2010. Cost of the award is $248,168.34, including H.S.T. of $28,550.43. For Energy Management Systems project, T10-126, Building Automation - Sportsworld has been awarded to TAC Controls & Automation Inc., with CAO’s approval on October 27, 2010. Cost of the è ó ïð December 8, 2010 award is $108,882.28, including H.S.T. of $12,526.28. For Breithaupt Centre project, T10-114, Breithaupt Community Centre - Accessibility Renovations has been awarded to Greyhound Contracting Inc., with CAO’s approval on November 8, 2010. Cost of the award is $ 824,900, including H.S.T. of $94,900. Consultants involved in the preliminary phases be This measure has been effective at expediting the retained and the consultant selection process be project timeline. waived for following projects mentioned below: McLennan Park – Walter Fedy Partnership CMF Improvements - Giffels Associates Limited/ IBI Group (Architect consulting services) CMF Improvements - Morrison Hershfield Limited (Mechanical and Electrical consulting services) CMF Improvements - Morrison Hershfield Limited (LEED consultant services) For Storm Water Infrastructure Rehabilitation This measure has been effective at expediting the projects, involving drainage upgrades only will be project timeline. delivered by general contractors under existing construction contracts through a standard change order process as per purchasing guidelines. That the Mayor and Clerk be authorized to This measure will expedite the project timeline. The execute a 'cost plus' agreement with Ball City has received a written confirmation from the Construction for the completion of the design and Federal government on this approach. construction of Sportsworld Arena improvements to an upset limit of $900,000; said agreement to be to the satisfaction of the City Solicitor. The King Street reconstruction project be This measure has been effective at expediting the delivered by general contractors and consultants project timeline. under existing construction contracts and consulting contracts through a standard change order process as per purchasing guidelines. That the Mayor and Clerk be authorized to This measure has been effective at expediting the execute any amendments to Agreements project timeline. pertaining to Projects for which funding is approved through the Infrastructure Stimulus Fund, the Recreational Infrastructure Canada Fund, and the Community Adjustment Fund, if necessary, and provided said amendments are satisfactory to the City Solicitor. That the Mayor and Clerk be authorized to This provision ensures that the Mayor and the Clerk execute any agreements pertaining to the tenders have the authority to execute agreements for è ó ïï APPENDIX "C" STIMULUS PROJECT STATUS UPDATE December 8, 2010 awarded with respect to Infrastructure Stimulus tenders awarded by the CAO. Fund projects provided said agreements are satisfactory to the City Solicitor. That the Chief Administrative Officer be authorized This measure has been effective at expediting the to approve the commencement of the project timeline. prequalification process and approval of awards to the prequalified vendors for Infrastructure Stimulus Fund and Recreation Infrastructure Canada Fund projects in instances where scheduling the matter for the next Council meeting would result in undue project delay, and that a report regarding these awards be brought to Council at a future meeting; That the Director, Supply Services be authorized to extend current consultant purchase orders for Infrastructure Stimulus Fund and Recreation Infrastructure Canada Fund projects to incorporate the costs of applications for various City building/planning approvals which would normally be incurred directly by the City, including related construction management fees or the other administrative fees. THAT the Mayor and Clerk be authorized to This provision ensures that the Mayor and the Clerk execute an amendment to the following contracts have the authority to release 2% holdback to avoid and agreements satisfactory to the City Solicitor to any loss of funds due to non-release of holdback provide for the early release of the 2% prior to March 31, 2011. maintenance holdback or portions thereof respecting projects for which infrastructure stimulus funding or other grant(s) have been obtained: McGillivray & Sons Contractors Limited (September 22, 2009) – to allow the City to release the 2% maintenance holdback on February 15, 2011 for the stimulus fund work completed for Greenbrook drive; Coco Paving Inc. (April 28, 2009) – to allow the City to release the 2% maintenance holdback on February 15, 2011 for the stimulus fund portion of the work; THAT the Mayor and Clerk be authorized to This provision ensures that there is no loss of funds execute forthcoming contracts, agreements, and due to non-release of holdback prior to March 31, amending agreements satisfactory to the City 2011. Solicitor, reducing the release of the 2% holdback from two (2) years from the date of substantial completion to February 15, 2011 in relation to stimulus fund projects. è ó ïî è ó ïí è ó ïì è ó ïë è ó ïê è ó ïé è ó ïè è ó ïç è ó îð è ó îï è ó îî è ó îí è ó îì è ó îë è ó îê è ó îé è ó îè è ó îç è ó íð è ó íï è ó íî è ó íí è ó íì