HomeMy WebLinkAboutCSD-11-035 - Southwest Urban Area Community Master PlanStaff Re ort
I~TC~~nT~~ CommunrtySer~rcesDepar~ment
www.kitchenerca
REPORT TO: Planning & Strategic Initiatives Committee
DATE OF MEETING: February 28th, 2011
SUBMITTED BY: Alain Pinard, Director of Planning
PREPARED BY: Brandon Sloan, Interim Manager, Long Range & Policy
Planning (519-741-2648)
Juliane vonWesterholt, Senior Planner (519-741-2776)
WARD(S) INVOLVED: Wards 5 and 6
DATE OF REPORT: February 17, 2011
REPORT NO.: CSD-11-035
SUBJECT: Southwest Urban Area Studies
Community Master Plan
RECOMMENDATION:
A. That the Community Master Plan for the Southwest Urban Area, prepared by The Planning
Partnership and supporting consultants, attached to report CSD-11-035 be received for
review, discussion and public input, and returned with any necessary revisions and
supporting recommendations for approval at the March 21, 2011 meeting of the Planning
and Strategic Initiatives Committee.
B. That staff be directed to prepare Official Plan policies, land use designations and a
Secondary Plan for the entire Southwest Urban Area based on the direction of the
Community Master Plan and including the following:
That additional work to further refine technical requirements (such as stormwater
management/groundwater facilities and the transportation network analysis) be
completed as part of the Secondary Plan process and subsequent development
applications where appropriate; and
• That the Secondary Plan and new Official Plan policies identify the lands on either
side of Fischer Hallman Road generally between Bleams Road and Huron Road as a
Mixed Use Corridor with a Mixed Use Node near Fischer Hallman Road/Huron Road.
C. That the significant cultural heritage resources identified in the Community Master Plan for
the Southwest Urban Area, Cultural Heritage Background Study: Built Heritage and Cultural
Landscapes report prepared by Nancy Z. Tausky be referred to Heritage Kitchener for their
consideration of Steps 3 and 4 of the Municipal Heritage Register review process for
potential listing as non-designated properties of cultural heritage value or interest.
D. That a Class Environmental Assessment be undertaken for a proposed north-south collector
street (for the portion of the proposed road outside of any plan of subdivision) that would
connect the Southwest Urban Area and that the timing be referred to next year's Capital
Budget process and the next Development Charges Background Study and By-law.
5-1
Staff Re ort
~ITCH~I`r?E~ X01111'1']~1111~~'$E1'V1[QS~~pQ~'~~T?~Q1~ w~+w.kitthenerca
E. That the Secondary Plan process for the entire Southwest Urban Area include public and
stakeholder involvement and provide recommendations for the June 20th, 2011 meeting of
the Planning and Strategic Initiatives Committee.
BACKGROUND:
The Community Master Plan attached to this report implements specific actions of the Kitchener
Growth Management Strategy (KGMS) and the Kitchener Growth Management Plan 2009-Post
2010 (KGMP), that were approved by Council in 2009. The KGMS (Goal 2 Creating Vibrant
Urban Places, Action 3) gives direction to investigate the establishment of a new mixed used
node or corridor along Fisher-Hallman Road, south of Bleams Road. The KGMP identifies
comprehensive planning initiatives that need to be completed prior to giving consideration to
individual development applications for the Southwest Urban Area. The list of comprehensive
planning initiatives includes a community master plan and supporting studies.
On November 2, 2009 Council received Report DTS-09-157 which provided an outline of the
process for completing the comprehensive planning initiatives studies required for the
Southwest Urban Area. On January 25, 2010, Council authorized the hiring of a consulting team
led by The Planning Partnership, to prepare Phases 1 and 2 of the studies -the Community
Master Plan. The Community Master Plan and supporting technical work is now ready for
review and is further outlined in this staff report and the attached document.
REPORT:
The Southwest Urban Area is approximately 430 hectares in area and generally includes lands
on either side of Fischer Hallman Road from Bleams Road to just south of Huron Road. The
study area includes a large portion of lands that were added to the City Urban Area in the
Region of Waterloo Official Policies Plan through ROPP Amendment No. 16.
A Community Plan is a widely used planning tool that guides future development by establishing
broad land uses and the general locations of new collector streets, and community amenities
such as parks and schools. It is supported with environmental, heritage and engineering studies
and policies.
A Community Master Plan is an evolved version of the community planning tool where the
scope and scale of the issues require more study and co-ordination as is the case for the
Southwest Urban Area. The Community Master Plan for the Southwest Urban Area will provide
direction to prepare a Secondary Plan which will formally establish the land uses and associated
policies for this area in the City's Official Plan. This is an important step to ensure that the
community expectations are met.
Southwest Community Master Plan Process (Phases 1 & 2)
A Community Master Plan and Secondary Plan process includes a significant amount of
technical work and often takes many years to complete. The process for the Southwest Urban
Area was designed to be as comprehensive and inclusive as possible given the agreed upon
timelines. The major steps for the overall Southwest Urban Area Studies work program were
outlined in DTS Report 09-157. Generally the project includes four phases. The tasks required
5-2
Staff Re ort
~ITCH~I`r?E~ X01111'1']~1111~~'$E1'V1[QS~~pQ~'~~T?~Q1~ w~+w.kitthenerca
to complete the Community Master Plan (Phases 1 and 2) were outlined in the Terms of
Reference dated November 2009. Generally, this component of the project included:
• Reviewing, selecting and hiring consultants.
• Undertaking background and contextual work to understand the existing conditions
and the various interrelated planning, engineering, environment and parks and
recreation components.
• Preparing technical studies, such as a cultural heritage review, archaeological
assessment, species at risk field work and study, comprehensive stormwater
management analysis and groundwater infiltration implications, etc.
• Convening meetings (approx. seven in total) with the project Executive Group and
Internal Working Team, including a design workshop. In addition, numerous
members of the project team contributed a significant amount of expertise and
review in a very expedient manner outside of formal meetings.
• Preparing and discuss draft community design principles and design givens.
• Designing approximately six land use options.
• Developing and review detailed evaluation criteria
• Undertaking a comprehensive review of the various land use options.
• Conducting several stakeholder sessions with the major land owners and their
representatives, including joint meetings and presentations along with two separate
individual interview feedback sessions.
• Holding two public input sessions including a workshop and an open house
(additional notice and involvement opportunities for surrounding property owners and
the general public is further described in the Community Engagement section of the
report below).
• Developing and reviewing stormwater management options, specialized modeling
and impact assessment.
• Resolving significant issues.
• Reviewing various options and materials.
• Determining strategic directions for the project; confirm project budgeting and other
project management aspects.
• Preparing a preferred Community Master Plan, final supporting studies and
associated reports.
Key Issues
There are a number of design challenges within the study area. Many of these issues are
highlighted within the attached Community Master Plan document. Briefly, the study area
contains the largest, remaining greenfield area that does not have an urban land use
designation nor approved comprehensive planning. The westerly boundary is the proposed
Countryside Line. Through the Region's Transportation Master Plan work a fairly aggressive
transit modal split target (more transit riders than typical for greenfield development) was
established for the Fischer Hallman corridor. It was also necessary to address new provincial
direction on planning for new greenfield areas that includes achieving minimum density
requirements, contributing to "complete communities" and having a higher standard of design
for public areas. All of this represents an evolution of the way that these communities are
designed and developed in Kitchener.
5-3
Staff Re ort
~ITCH~I`r?E~ X01111'1']~1111~~'$E1'V1[QS~~pQ~'~~T?~Q1~ w~+w.kitthenerca
One of the most vital issues that evolved through the Community Master Plan process is the
implementation of rigorous targets set through the Alder and Upper Strasburg Subwatershed
Studies/Plan. This necessitated the hiring of a complementary consultant to prepare specific,
detailed modeling of comprehensive stormwater management options. These options then have
to be tested and modelled to ensure that groundwater infiltration targets can be achieved (or in
this case find ways to exceed the targets).
Other issues addressed through the Community Master Plan process include: sorting out
transportation/road network options; establishing a focal point for southwest Kitchener and an
appropriate gateway to the city; identifying the necessity and locations of community amenities
such as schools, parks, trails, and community centre; the conservation of cultural heritage
resources; and the study and review of a threatened species habitat.
The Community Master Plan
The Community Master Plan document contains a significant body of work that includes the
following components:
• Overview Background Report (physical and multi-disciplinary context)
• Design Givens, Land Use Options and Evaluation Review
• Recommended Community Master Plan, including vision, design and guiding principles
and the structure of the community, land use, natural heritage system and roads
• Strategies for contributing towards Sustainability
• Transportation System recommendations
• Archaeological Assessment
• Cultural Heritage Study
• Functional Servicing
• Comprehensive stormwater Management and Groundwater Infiltration
• Species at Risk Study
• Commercial/Market Needs Analysis
• Public Workshop and Stakeholders Presentation Summary
The impact of the preferred Community Master Plan on the surrounding transportation system is
currently under review as part of the Southwest Transportation Network Study. This component
of work is expected to be completed shortly and will be an important consideration of the
Secondary Plan process.
Overall, the Community Master Plan is based on the City's design guidelines for suburban
development. More specifically, Fischer Hallman Road south of Bleams Road would be the
community's transit-oriented "spine" with higher densities and mixed uses oriented towards that
main transit route. This area could potentially accommodate at least 25,000 persons and jobs.
The community structure of the preferred Master Plan includes four, walkable neighbourhoods
to the west of the Fischer Hallman mixed use corridor. The design of each neighbourhood is
based on the "5-minute walk-rule" to a central gathering point such as a neighbourhood park or
other community feature. Within each neighbourhood, a small park space would be within a 2-
minute walk. This design, coupled with the conservation of a significant amount of natural
heritage features (such as woodlands, wetlands, creek floodplains and groundwater infiltration
locations that is more than any other community in the city), contributes towards planning for a
5-4
Staff Re ort
~ITCH~I`r?E~ X01111'1']~1111~~'$E1'V1[QS~~pQ~'~~T?~Q1~ w~+w.kitthenerca
healthy Kitchener. The technical analysis yields that the recommended plan could achieve
better groundwater infiltration than leaving the land in its current state.
Ultimately, the plan will reflect a modified, grid network with multiple connections and route
options to the surrounding arterial road system. The evolution of the surrounding roads and
subdivisions within the south and west portions of the city has provided challenges to establish
a well-connected and efficient system in this area. Notwithstanding, significant attempt is made
to have transit as a viable option, along with the provision of a trail and bike system. As the
community develops it will be necessary to establish both anorth-south and an east-west
collector street to offset Fischer Hallman and Bleams Roads along with providing a vital
connection link between neighbourhoods. Establishing multiple route options means that future
residents and employees would not all have to utilize the same points on the arterial roads and
intersections.
Another key feature of the Community Master Plan design is a "green" system along anorth-
south route that is interior to the neighbourhoods with a future community centre/branch library
at the north (adjacent to a future community trail along the hydro corridor) and a future District
Park to the south. The plan includes three potential public elementary school sites, one catholic
school site, and two existing sites for religious institutions along with one new one near Trussler
Road. Special Policy considerations will have to be included within the Community Master Plan
and potentially the pending Secondary Plan in order to allow for the continual refinement of the
best possible water management and natural heritage system.
Additional land uses and design elements are further described in the Community Master Plan,
prepared by The Planning Partnership, which is attached to this report.
Southwest Secondary Plan (Phases 3 & 4)
The overall work program summary and process hierarchy for the Southwest Urban Area
Studies was outlined in DTS Report 09-157. Steps 1-9 on the original work program summary
have now been undertaken. The updated general work program is attached to this report as
Appendix "A".
One of the requirements of Phases 1 and 2 of the study was to define the area required for a
Secondary Plan. Through the community master planning process it was determined that the
neighbourhoods have many strong relationship with each other as well as the Fischer Hallman
mixed use corridor so it is recommended that one Secondary Plan be prepared for the entire
Southwest Urban Area (instead of developing additional, separate policy planning frameworks
for the three neighbourhoods). This holistic approach should simplify phases 3 and 4 and do
not impact the original June 2011 deadline.
Therefore, city staff will now be preparing an Official Plan Amendment, including new land use
designations, policies and a Secondary Plan for the entire study area. This represents Phases 3
and 4 of the Study (also shown as Steps 10-14 on the general work program in Appendix "A").
These steps will include the following:
5-5
Staff Re ort
~ITCH~I`r?E~ X01111'1']~1111~~'$E1'V1[QS~~pQ~'~~T?~Q1~ w~+w.kitthenerca
• Official Plan Amendment and new Secondary Plan
• In addition to typical land use policies and mapping will include objectives and
policies regarding Transportation Demand Management, Energy/Water/Waste
Conservation, and Air Quality
• Supplementary Design Guidelines
• Includes identification of existing City and Region guidelines that apply to this area
and any supplemental context specific guidelines
• Includes a Streetscape Plan for Fischer Hallman Road
• Includes a Built Form Plan/Sketch
• Municipal Financial Impact Assessment (next level of work)
• Potential refinement of land use and policies for natural heritage, stormwater
management and groundwater infiltration
• Preliminary Noise Impact Assessment
• Conceptual Plan for Neighbourhood Parks and Community Trails
• Deferral of Concept Master Plan for South District Park until approximately 2013
• Public and Stakeholder engagement
ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN:
The Community Master Plan for the Southwest Urban Area is being prepared with the
Community Vision in mind. The plan is to build an innovative and vibrant community with safe
and thriving neighbourhoods. The Community Master Plan also implements Kitchener's Growth
Management Strategy and Growth Management Plan which were developed in response to
Strategic Directions Nos. 1, 2 and 3 of the `Development" Community Priority. Other Community
priorities such as "Leadership and Engagement" and "Environment" were addressed in the
preparation of this community master plan and supporting materials.
FINANCIAL IMPLICATIONS:
This component of the study was funded through an existing Capital -Development Charges
account. The project was completed within the original amount approved by Council.
There will be both revenues and expenditures associated with land use decisions and
development of the subject area that will impact both the Capital and Operating budgets. The
following tables outline the high-level financial implications known at this time:
• Development Charges
• Property tax
• Future user fees
• Application and permit fees
• Utility fees
5-6
Staff Re opt
~ommunrtySer~ices Department
www.kitchenerca
res
Major Engineering Infrastructure Requirements
• Middle Strasburg Trunk Sanitary Sewer (required for the majority of lands)
• South Strasburg Trunk Sanitary Sewer (required for a portion of the lands)
• Huron Road widening (Fischer Hallman to Trussler)
• New North-South Collector Street (a portion would be outside of development)
Region of Waterloo requirements include arterial road improvements, intersection
improvements, watermains and provisions for additional sewage treatment capacity.
Major Community Infrastructure Requirements
Additional capacity will be required for the following:
• Community Centre (including one new standard size centre and one potential small
centre in the SWUA)
• Library Services (including a new branch in the SWUA)
• Parks (including 4-5 neighbourhood parks and additional village greens in the SWUA)
• Trails
• Cemeteries (including an expansion to the existing cemetery in the SWUA)
• Arenas, Pools, District Sportsfields (outside SWUA)
* Primarily funded from Development Charges Reserves
Most other infrastructure and amenities are primarily constructed and initially paid for by
developers as part of the development approval process. These assets include local roads,
stormwater management facilities, groundwater infiltration facilities, bike lanes, street trees and
natural heritage (open space) areas.
In addition, the two major school boards require a potential total of 4 elementary schools in the
SWUA and additional high school capacity (beyond that currently available) will be required
outside of SWUA. The school boards have not yet received any funding from the Province for
these schools.
Operating and maintenance costs
All of the above assets, including infrastructure and amenities constructed and initially paid for
by developers require staffing, equipment, maintenance and eventual replacement (lifecycle
costs) in order to add value to the community.
Roads (two major Collector Streets, minor collector and local streets)
Laneways (potential for limited number of rear lanes in appropriate locations)
stormwater Management and Groundwater Infiltration Facilities
Bike lanes
Street trees, streetscape elements and landscaping
Natural Heritage lands
The recommended 2011 Capital Budget and Forecast has been presented but not approved.
Several engineering and community infrastructure facilities are identified near the end of the 10-
year Capital Forecast. The ability to fund the construction and operation of the facilities required
5-7
Staff Re ort
~ITCH~I`r?E~ X01111'1']~1111~~'$E1'V1[QS~~pQ~'~~T?~Q1~ w~+w.kitthenerca
for this community will be important consideration in the preparation and approval of future
Capital Forecasts.
As the planning and development process moves from the master plan stage to construction
and occupancy there should be a greater understanding of specific costs and benefits. Efforts
are being made through the planning process to anticipate and reduce where possible the
potential maintenance obligations. In that regard, one option to consider is to establish a
common element condominium within the study area to assist with maintenance obligations of
design elements.
A portion of the next phase of work (Secondary Plan process) will include further refinement of
financial considerations including the addition of operating cost estimates (i.e. the potential
length of new roads, sidewalks or area of park will be added along with an average cost/km or
1ha for maintenance will be added). Any requirements for funding the components of the
Secondary Plan process will continue to be through the existing Capital -Development Charges
account.
COMMUNITY ENGAGEMENT:
Phases 1 and 2 of the project primarily utilized the themes of `Inform' and `Collaborate' with
respect to the City's community engagement strategy. A public workshop was held in June 2010
that provided excellent dialogue and involvement with members of the surrounding
neighbourhoods and helped guide the preparation of the Community Master Plan. A public open
house was held in January 2011. This was an opportunity to provide an update on the project
and illustrate the draft structure of the community, neighbourhood and natural heritage system
along with the preferred land use plan. Notification of the public sessions was given through
direct mailings to the surrounding property owners, postings on the City's website, advertising in
print media, road signs, email notice and verbal communication. Approximately 50 people
attended each public session. A project fact sheet and frequently asked questions and answers
were also available at the sessions and on the City's website. Numerous sessions were also
held throughout the project with the major land owners and their consultants. A further summary
of the community engagement is outlined as an attachment to the Community Master Plan
document.
The February 28t" meeting of the Planning & Strategic Initiatives Committee is a formal public
meeting. Notice was given in The Record along with the City's website, at the most recent public
and stakeholder sessions and this report will be sent via email (and mail if necessary) to the
project's public and stakeholder circulation list.
This report recommends that community and stakeholder involvement be an important
component of the Secondary Plan process. If approved, this will include both informal and
formal public meetings. A statutory public meeting will be required before the adoption of the
Secondary Plan.
5-8
CONCLUSION:
Staff Re opt
~ommunrtySer~ices Department
www.kitchenerca
The built environment must reduce its impact on the natural environment. The direction that this
Community Master Plan (and other higher level initiatives) provides is that throughout the next
phases of the planning and design process as many "green" building/development techniques
must be utilized as possible. The preferred Community Master Plan would provide for the
conservation of a significant amount of natural heritage features and water management
facilities along with a hierarchy of parks and other community facilities.
The Plan delivers amixed-use, transit supportive community that is oriented to Fischer Hallman
Road with a community focal point/node near Huron Road. It is based on walkable
neighbourhoods and would achieve numerous planning objectives. The Community Master
Plan document includes a significant amount of supporting study and information. In order to
ensure there is review time for certain agencies, stakeholders and the public, staff recommend
that the Plan be received for discussion and that any comments be submitted to the project
managers by March 7t". Any necessary revisions and supporting recommendations will be
provided to the March 21St meeting of the Planning and Strategic Initiatives Committee.
This report includes additional recommendations to ensure that work proceeds on the next
phases of the Southwest Urban Area Studies so that an Official Plan Amendment and
Secondary Plan can be delivered in June 2011.
ACKNOWLEDGED BY: Jeff Willmer, Deputy CAO
Community Services Department
Attachments:
Appendix `A" -Updated SUAS General Work Program Summary and Process Hierarchy
Appendix "8"-Preferred Community Master Plan Drawing
Community Master Plan for the Southwest Urban Area (entire document to be posted on the City's
website at http://www.kitchener. ca/en/insidecityhall/opreviewdocs. asp)
5-9
Appendix "A"
GENERAL WORK PROGRAM SUMMARY (Jan. 2010-June 2011)
Q STEP 1 -Prepare and finalize Terms of Reference
d STEP 2 -Request and review "Expressions of Interest"
Q STEP 3 -Request and review detailed proposals from consultants
Q STEP 4 -Interview and select consultant team. Approval by Council.
Q STEP 5 -Agreement with consultant and begin project.
Q STEP 6 -Undertake Phase 1: Context. Review background, existing studies,
opportunities and constraints. Consultant to complete Background Report/
Technical Memo.
Q STEP 7 -Undertake Phase 2: Community Concepts. Prepare conceptual land use
options, first component of supporting studies/plans (i.e. Southwest Kitchener
Transportation Network Study) and identify planning and design principles.
d STEP 8 -Landowner and public consultation on Phase 2.
Q STEP 9 -Consultant to provide report to Council on analysis, consultation and
recommendations for Phase 2. Request authorization to prepare detailed
Secondary/Community/Master Plans based on preferred option.
STEP 10 (revised) -Undertake Phase 3: Secondary Plan. Staff to prepare Secondary
Plan for the Southwest Urban Area. Consultants and staff to complete
supporting studies/plans.
STEP 11 -Landowner and public consultation on Phase 3.
STEP 12 -Revisions.
STEP 13 -Staff to prepare Phase 4: Final Report. Includes recommendations on land
use for all of study area and final Secondary/Community/Master Plans.
STEP 14 (revised) -Consideration of land use designations, supporting policies and
Secondary Plan as part of an Official Plan Amendment by end of June 2011
(to be eventually incorporated into the new Official Plan).
STEP 15 -Regional consideration.
5-10
MUNICIPAL PLANNING HIERARCHY
Southwest Kitchener Process
Regional Official Plan
(ROPPA #16 and
ROP 2009)
City Official Plan
(direction to prepare
Subwatershed Study)
Subwatershed Master Plan
(Alder Creek Watershed Study and Upper
Strasburg Creek Subwatershed Plan Update)
Secondary Plan (Phase 3)
^ Urban Design Guidelines
^ Built Form Plan
^ Streetscape Plan
^ TDM Policies
^ Energy Conservation Policies
^ Noise Impact Analysis
^ Master Planning of Parks
(deferral of District Park concept
plan to 2013+)
^ Continuation of next level of
analysis of Community Master
Official Plan
Amendment/Secondary
Plan (Phase 4)
Community Master Planning (Phases 1 & 2)
^ Transportation Network Study
^ Land Use Needs
^ Residential, Employment
^ Connectivity Plan
^ Parks and Recreation
^ School Accommodation
^ Master Drainage/SWM/groundwater plan
^ Sanitary Servicing Analysis
^ Threatened Species Study
^ Cultural Heritage Survey
^ Air Quality Impact Analysis
^ Financial Impact Analysis
Plan of Subdivision/Zone
Change/Site Plan
*Italics denotes updated from previous chart
Denotes current phase of work
^ Implementation of Community
Master Plan and Secondary
Plan recommendations
^ Environmental Impact Study
^ Other supporting site specific
technical studies/plans,
including Implementation plans
Development
5-11
n ~ .~. E ro - m 3
N
a a a LL U
N _
-
m a
~ ~
~ ~-
o
~
°
-° m
~ - a ti
'' ~ ~
~ m v
~
o
a
r ~ .` ~ ~ - N- ~ m ~
~
s o w
.~ -
z > z C7 ~
? ~ a
z m a '~ o
_
a °
n N
C7 -
z LL ~ `~
C `v
z? N
o H I~ ~ ~ ii
12
o
_ (n
o ~ a E _ _
a a ~ ~ .-°'a - y o ~ ~ m a U ~ -
m m m rc U y - ~
-6 d d ~ ~ ~ N ~' t N W ¢ m ~ ~ Y
~ N w y y `n ~ _ C W _ _ d 3 a m
~ J J -a ri a x o .~ a ~ ~' ~ ~' E b
J ~ ~ x ~ U z a U a = 5 u~ a
CIIJI~®~~ ~o=i