KITCH~i~T~,R ftr~anre and corporate Services Department
wwau:kitchenerca
REPORT TO: Committee of the Whole
DATE OF MEETING: 2010-12-20
SUBMITTED BY: Larry Gordon, Director of Supply Services, 2214
PREPARED BY: Steve Rudak, Buyer, 2213
WARD(S) INVOLVED: N/A
DATE OF REPORT: 2010-12-10
REPORT NO.: FCS-10-007
SUBJECT: T10-128 -Hydrovac Excavating Services
RECOMMENDATION:
That tender T10-128, Hydrovac Excavating Services, be awarded to Super Sucker Hydro Vac
Service Inc., Ancaster, Ontario at their tendered price of $171,600., plus H.S.T. of $22,308., for
a total of $193,908., with an option to renew for four (4) additional twelve (12) month terms.
BACKGROUND:
Hydrovac excavation is a no dig technology enabling underground infrastructure to be exposed
for maintenance and repair. Where in the past the requirement to carry out such repairs was a
backhoe and dump trucks, we now use a hydrovac vehicle for repairing water or gas
mains, services and valve boxes (water and gas), and performing anode installations. The use
of a hydrovac vehicle has improved efficiencies and staff may now perform double to quadruple
the work in one day. There is also a cost saving in that the surface restoration area is
minimized by having smaller, more localized access points.
REPORT:
Tenders were advertised publicly in The Record, on the City of Kitchener website and the
Internet through the Ontario Public Buyers Electronic Tendering Information System. Twenty
(20) potential bidders downloaded tender documents, and by the closing date of Thursday
November 25, 2010, three (3) tenders had been received.
The following tenders were received:
Bid Price Adjusted
Super Sucker Hydro Vac Service Ancaster ON $ 193,908.00
Badger Daylighting Cambridge ON $ 199,501.50
Fencor Hydro Excavation Limited Mississauga ON $ 216,112.50 $ 237,723.75
S#aff Re orb
KITCHENER ftr~anre and ~Orpor~te Services Deparrme~t wwavkitchenercn
The tender received from Fencor Hydro Excavation Ltd., included a mathematical error that has
been subsequently corrected.
The price for excavation services has decreased 5.5% from the previous contract.
Tenders were reviewed by J. Edmondson, Manager of Utility Operations, and S. Rudak, Buyer,
who concur with the above recommendation.
ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN:
Theme: Financial Management
Strategic Direction: Ensure responsible use of public funds within a supportive policy
framework.
The City of Kitchener's purchasing policies and practices ensure openness, fairness and
transparency in the procurement of goods and services.
FINANCIAL IMPLICATIONS:
Funding will be provided from various operating accounts as required.
COMMUNITY ENGAGEMENT:
Not applicable
Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate
ACKNOWLEDGED BY: Services