Loading...
HomeMy WebLinkAboutFCS-11-107 - T11-032 - Lateral Sewer Pipe Bursting REPORT TO: Committee of the Whole DATE OF MEETING: 2011-05-09 SUBMITTED BY: Larry Gordon, Director of Supply Services, 2214 PREPARED BY: Larry Gordon, Director of Supply Services WARD(S) INVOLVED: All DATE OF REPORT: 2011-05-03 REPORT NO.: FCS-11-107 SUBJECT: T11-032 -Lateral Sewer Pipe Bursting www.kitchenerca RECOMMENDATION: That Tender T11-032 -Lateral Sewer Pipe Bursting, be awarded to McGillivray & Sons Contractors Limited, St. Agatha, Ontario, at their tendered price of $265,000.00, plus H.S.T. of $34,450.00, for a total of $299,450.00. BACKGROUND: Every year, the City of Kitchener runs a program to improve the sanitary sewer service to local properties. The list of locations is derived from the Operations Department, in which they have received numerous complaints about sewer lateral back ups. The sewer lateral is then videoed by Operations to determine the cause of the back up. Where it is determined that the back up is caused by a City related issue, such as tree root intrusion or deteriorated existing pipe, the property is then put on a list for sewer lateral repairs. Engineering determines which type of sewer lateral rehabilitation will be done based on the type of structural defect, the location and accessibility of the repair. If the lateral is in fact a trenchless candidate based on the criteria, it will be put on the trenchless lateral repair list. The City uses the Pipe Bursting trenchless method to complete these deficient laterals as it is a very cost effective and environmentally friendly method of rehabilitation. Through the tendered process we will retain a contractor to complete this trenchless work using a method called Pipe Bursting. Typically, there is very little excavation/digging required to complete this work. Two access pits will be opened up, one at the main sewer line in the roadway and the second at the property line where the existing sanitary lateral is located. If the problem extends past the property line due to City tree root intrusions, the sanitary sewer lateral will be replaced to either the house foundation or to the inside sewer cleanout of the house, if accessible, at no additional charge. A new continuous sewer service lateral pipe will then be pulled through the old sewer service and a permanent connection will be made at each end. The intent is to restore the structural integrity by installing one continuous pipe and eliminating further sewer back ups caused by root intrusions and structural defects. S~a~'Re~port finance and Corporate Services department 1 iv) - 1 Staff Re~p~r~ I~~rc~~nT~~ Finance and Corporate Services 1~eparfinent w~+w.kitthenerca The pipe that is recommended and used with the trenchless Pipe Bursting method is a pipe material called High Density Polyethylene Pipe (HDPE). This pipe is an approved and proven cost effective pipe that is extremely tough and durable for sewer lateral rehabilitation using the Pipe Bursting method. This pipe once installed gives the sewer lateral a new life expectancy of 50 plus years. REPORT: Tenders were advertised publicly in The Record, on the City of Kitchener website and the Internet through the Ontario Public Buyers Electronic Tendering Information System. Seven (7) potential bidders downloaded tender documents, and by the closing date of Thursday April 21, 2011, two (2) tenders had been received. The following tenders were received: McGillivray & Sons Contractors Limited St. Agatha ON $ 299,450.00 Verly Construction Group Inc. Mississauga ON $ 753,710.00 The price has increased 7 % from the previous contract. Tenders were reviewed by R. Trussler, Construction Project Manager, R. Langver, Construction Inspector, who concur with the above recommendation. ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: Theme: Financial Management Strategic Direction: Ensure responsible use of public funds within a supportive policy framework. The City of Kitchener's purchasing policies and practices ensure openness, fairness and transparency in the procurement of goods and services. FINANCIAL IMPLICATIONS: Funding will be provided from Work Order 228 and 11288, 22050 Financial report is attached. Budget estimate is $356,000. Any surplus funds will remain in this account to be used for a Trenchless Sewer Lining Contract. COMMUNITY ENGAGEMENT: Not applicable 1 iv) - 2 Staff Re~p~r~ I~~rc~~nT~~ Finance and Corporate Services 1~eparfinent w~+w.kitthenerca Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate ACKNOWLEDGED BY: Services 1 iv)-3 TRENCHLESS REHABILITATION WORK ORDER #228 AND 11288, 22050 As at April 26, 2011 Funding Sources Current Balance 586,441.69 Total Revenue Projected 586,441.69 Projected Expenditures Tender Request T11-032 265,000.00 HST -Net of Rebate 4,664.00 Existing Encumbrances - Projected Expenses (Unencumbered) 40,000.00 Total Expenditures Projected 309,664.00 Projected Surplus 276,777.69 Any surplus funds will remain in this account to be used for a trenchless sewer lining project. 1 iv) - 4