Loading...
HomeMy WebLinkAboutFCS-12-051 - T12-019 Halls Lane Reconstruction1 Staff Report KI~rCx~.~T~R Finance and Corporate Services Department www.kifthenerca REPORT TO: Committee of the Whole DATE OF MEETING: 2012-03-26 SUBMITTED BY: Larry Gordon, Director of Supply Services, 2214 PREPARED BY: Larry Gordon, Director of Supply Services WARD(S) INVOLVED: 9 DATE OF REPORT: 2012-03-19 REPORT NO.: FCS-12-051 SUBJECT: T12-019 -Halls Lane (Victoria St to Gaukel St and Benton St to Eby St) Road Reconstruction RECOMMENDATION: That Tender T12-019 -Halls Lane (Victoria St to Gaukel St and Benton St to Eby St) Road Reconstruction, be awarded to Sierra Construction (Woodstock) Ltd., Woodstock, Ontario at their corrected tendered price of $7,065,697.08, including provisional items and contingencies of $1,158,406.25, plus H.S.T. of $918,540.62, for a total of $7,984,237.70; and further, That the Mayor and City Clerk be authorized to execute an agreement satisfactory to the City Solicitor. BACKGROUND: The Halls Lane reconstruction project has been initiated to address the infrastructure issues which currently exist. The infrastructure along Halls Lane has generally reached the end of its useful life and requires full replacement. The project scope includes the reconstruction of all underground services (sanitary sewer, storm sewer and watermain) as well as sanitary and water service connections to the property line. The asphalt roadway will also be reconstructed. Also included in the project scope is improved streetlighting. Construction of Phase 2 from Victoria Street to Gaukel Street is expected to occur from April to October of 2012 and construction of Phase 3 from Benton Street to Eby Street is expected to occur from April to October of 2013. In order to address a potential deficit in the project, additional funding will be transferred from the Uncommitted Account. The purpose of the Uncommitted Account is to collect surpluses from favorable bidding on other Accelerated Infrastructure projects, and use them to offset unfavorable pricing on others. The low bid price is higher than budgeted due in part to the addition of provisional items to the contract. These items were added as a result of experience gained from the 2011 phase of this project and include items such as additional building support iv)-1 measures and an increase in the quantity of removed contaminated soil. These items have been added to the contract as provisional, and as such, may not be required but are prudent given the complexity of the work area. The higher than anticipated bid prices may also partly be a result of the complexity of the work area. The average price of all three bids received was $9,140,011.46 (including contingencies and HST). REPORT: Tenders were advertised publicly in The Record, the Daily Commercial News, on the City of Kitchener website and the Internet through the Ontario Public Buyers Electronic Tendering Information System. Documents were picked up by nineteen (19) interested parties, and by the closing date of Thursday, March 1St. 2012, three (3) tenders had been received. The tenders were reviewed by M. Christensen, Walter Fedy, the City's Consultant for the project, and K. Mick, Design & Approvals Engineer who elected to award the project to Sierra Construction (Woodstock) Ltd., Woodstock, Ontario. The following tenders were received: Bid Price Adjusted Bid Price Sierra Construction (Woodstock) Ltd. Woodstock ON $ 7,984,689.69 $ 7,984,237.70 Network Sewer and Watermain Ltd. Cambridge ON $ 9,251,983.28 $ 9,253,387.47 Bel-Air Excavating & Grading Ltd. Cambridge ON $10,182,409.21 $10,182.409.21 ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: Theme: Financial Management Strategic Direction: Ensure responsible use of public funds within a supportive policy framework. The City of Kitchener's purchasing policies and practices ensure openness, fairness and transparency in the procurement of goods and services. iv)-2 FINANCIAL IMPLICATIONS: At the end of the construction phase, this project is not expected to have a surplus or a deficit (E) due to the Transfer from the Uncommitted Infrastructure account of $735,195, as well as the estimated surplus achieved in the design phase of the project. Tender T12-019 Halls Lane Reconstruction The total budget for all phases of this project is Estimated Cost for this Phase of Work Tender T12-019 costs, including HST less: HST rebate on tender Net Cost Being Awarded Costs Incurred to Date Projected Costs: Staff Time / Misc Projected Costs: City Share of Hydro Relocation Costs Projected Costs: Structural Monitoring Total Estimated Cost for this Phase of Work $ 12,593,537 $ $ 7,984,238 (794,184) $ 7,190,054 A $ - $ 152,040 $ 955,000 $ 100,000 $ 8,397,094 C Budget for this Phase of Work Storm Water Utility $ 1,508,000 Water Utility $ 2,033,000 Sanitary Utility $ 3,017,000 External Billings(Hydro, Rogers, Bell and Private Works) $ 1,006,245 Total Budget for this Phase of Work Estimated Surplus/(Deficit) for this Phase of Work (B - C) $ 7,564,245 B $ (832,849) D Transfer from Uncommitted Infrastructure Estimated Surplus/(Deficit) from previous phases Total Estimated Surplus/(Deficit) COMMUNITY ENGAGEMENT: Theme: Financial Management $ 735,195 $ 97,653 $ (0) E Strategic Direction: Ensure responsible use of public funds within a supportive policy framework. The City of Kitchener's purchasing policies and practices ensure openness, fairness and transparency in the procurement of goods and services. ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services iv)-3