HomeMy WebLinkAboutFCS-12-080 - E12-036 Consultant Services - Building Vibration MREPORT TO:
Committee of the Whole
DATE OF MEETING:
2012-04-23
SUBMITTED BY:Larry Gordon, Director of Supply Services, 2214
PREPARED BY:
Larry Gordon, Director of Supply Services
WARD(S) INVOLVED:9
DATE OF REPORT:2012-04-13
REPORT NO.:
FCS-12-080
SUBJECT:
E12-036 – Consultant Services, Building Vibration
Monitoring, Halls Lane Reconstruction Phases 2 & 3
RECOMMENDATION:
That Expression of Interest E12-036 – Consultant Services, Building Vibration Monitoring, Halls
OZA Inspections Ltd., Grimsby, Ontario
Lane Reconstruction Phase 2 & 3, be awarded to at
their estimated fee of $40,353.50, including contingencies of $3,668.50 plus H.S.T. of
$5,245.96, for a total of $45,599.46.
BACKGROUND:
The Halls Lane reconstruction project has been initiated to address the infrastructure issues
which currently exist. The infrastructure along Halls Lane has generally reached the end of its
useful life and requires full replacement. The project scope includes the reconstruction of all
underground services (sanitary sewer, storm sewer and watermain) as well as sanitary and
water service connections to the property line. The asphalt roadway will also be reconstructed.
Many of the existing buildings along Halls Lane are situated on the property line and date back
to the late 1800’s. In order to assess the effectiveness of the Contractor’s building support
method and to reduce the risk of building damage, the City wishes to monitor vibration
generated by construction equipment caused by working in proximity to foundations. The scope
of these services includes vibration monitoring of construction operations that may cause
excessive vibration including commentary on the impact of vibration levels.
Construction of Phase 2 from Victoria Street to Gaukel Street is expected to occur from April to
October of 2012 and construction of Phase 3 from Benton Street to Eby Street is expected to
occur from April to October of 2013.
ï ¨ ÷ ó ï
REPORT:
In accordance with Chapter 170 of the Municipal Code pertaining to the Selection of
Professional Services/Consultants, a Consultant’s Review Committee was established
consisting of K. Mick, Design and Approvals Engineer, S. Allen, Manager, Engineering Design
and Approvals, J. Stevenson, Engineering Construction Project Manager and L. Gordon,
Director of Supply Services.
Documents were forwarded to four (4) qualified parties, and by the closing date of Wednesday
th
March 14, 2012, one (1) response had been received.
th
The review committee met on Thursday, March, 15, 2012, to review the submissions. The
Committee elected to award the project to OZA Inspections Ltd., Grimsby, Ontario.
A listing of the responding parties follows for your reference:
OZA Inspections Ltd. Grimsby ON
ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN:
Theme: Financial Management
Strategic Direction: Ensure responsible use of public funds within a supportive policy
framework.
The City of Kitchener’s purchasing policies and practices ensure openness, fairness and
transparency in the procurement of goods and services.
ï ¨ ÷ ó î
FINANCIAL IMPLICATIONS:
Tender E12-036
Halls Lane Reconstruction - Phases 2 & 3 Vibration Monitoring
The total budget for all phases of this project is $ 12,593,537
Estimated Cost for this Phase of
Work
Tender E12-036 costs, including HST $ 45,600
less: HST rebate on tender $ (4,536)
Net Cost Being Awarded $ 41,064 A
Costs Incurred to Date $ -
Projected Costs: E12-037 Building Displacement $ 68,757
Projected Costs: T12-019 Construction Tender $ 7,190,054
Projected Costs: City Share of Hydro Relocation Costs $ 955,000
Projected Costs: Staff Time / Misc $ 142,218
Total Estimated Cost for this Phase of Work $ 8,397,093 C
Budget for this Phase of Work
Storm Water Utility $ 1,508,000
Water Utility $ 2,033,000
Sanitary Utility $ 3,017,000
External Billings(Hydro, Rogers, Bell and Private Works) $ 1,006,245
Total Budget for this Phase of Work $ 7,564,245 B
Estimated Surplus/(Deficit) for this Phase of Work (B - C) $ (832,848) D
Transfer from Uncommitted
Infrastructure $ 735,195
Estimated Surplus/(Deficit) from previous phases $ 97,653 E
Total Estimated Surplus/(Deficit) $ 0
ACKNOWLEDGED BY:
Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate
Services