Loading...
HomeMy WebLinkAboutFCS-12-080 - E12-036 Consultant Services - Building Vibration MREPORT TO: Committee of the Whole DATE OF MEETING: 2012-04-23 SUBMITTED BY:Larry Gordon, Director of Supply Services, 2214 PREPARED BY: Larry Gordon, Director of Supply Services WARD(S) INVOLVED:9 DATE OF REPORT:2012-04-13 REPORT NO.: FCS-12-080 SUBJECT: E12-036 – Consultant Services, Building Vibration Monitoring, Halls Lane Reconstruction Phases 2 & 3 RECOMMENDATION: That Expression of Interest E12-036 – Consultant Services, Building Vibration Monitoring, Halls OZA Inspections Ltd., Grimsby, Ontario Lane Reconstruction Phase 2 & 3, be awarded to at their estimated fee of $40,353.50, including contingencies of $3,668.50 plus H.S.T. of $5,245.96, for a total of $45,599.46. BACKGROUND: The Halls Lane reconstruction project has been initiated to address the infrastructure issues which currently exist. The infrastructure along Halls Lane has generally reached the end of its useful life and requires full replacement. The project scope includes the reconstruction of all underground services (sanitary sewer, storm sewer and watermain) as well as sanitary and water service connections to the property line. The asphalt roadway will also be reconstructed. Many of the existing buildings along Halls Lane are situated on the property line and date back to the late 1800’s. In order to assess the effectiveness of the Contractor’s building support method and to reduce the risk of building damage, the City wishes to monitor vibration generated by construction equipment caused by working in proximity to foundations. The scope of these services includes vibration monitoring of construction operations that may cause excessive vibration including commentary on the impact of vibration levels. Construction of Phase 2 from Victoria Street to Gaukel Street is expected to occur from April to October of 2012 and construction of Phase 3 from Benton Street to Eby Street is expected to occur from April to October of 2013. ï ¨ ÷ ó ï REPORT: In accordance with Chapter 170 of the Municipal Code pertaining to the Selection of Professional Services/Consultants, a Consultant’s Review Committee was established consisting of K. Mick, Design and Approvals Engineer, S. Allen, Manager, Engineering Design and Approvals, J. Stevenson, Engineering Construction Project Manager and L. Gordon, Director of Supply Services. Documents were forwarded to four (4) qualified parties, and by the closing date of Wednesday th March 14, 2012, one (1) response had been received. th The review committee met on Thursday, March, 15, 2012, to review the submissions. The Committee elected to award the project to OZA Inspections Ltd., Grimsby, Ontario. A listing of the responding parties follows for your reference: OZA Inspections Ltd. Grimsby ON ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: Theme: Financial Management Strategic Direction: Ensure responsible use of public funds within a supportive policy framework. The City of Kitchener’s purchasing policies and practices ensure openness, fairness and transparency in the procurement of goods and services. ï ¨ ÷ ó î FINANCIAL IMPLICATIONS: Tender E12-036 Halls Lane Reconstruction - Phases 2 & 3 Vibration Monitoring The total budget for all phases of this project is $ 12,593,537 Estimated Cost for this Phase of Work Tender E12-036 costs, including HST $ 45,600 less: HST rebate on tender $ (4,536) Net Cost Being Awarded $ 41,064 A Costs Incurred to Date $ - Projected Costs: E12-037 Building Displacement $ 68,757 Projected Costs: T12-019 Construction Tender $ 7,190,054 Projected Costs: City Share of Hydro Relocation Costs $ 955,000 Projected Costs: Staff Time / Misc $ 142,218 Total Estimated Cost for this Phase of Work $ 8,397,093 C Budget for this Phase of Work Storm Water Utility $ 1,508,000 Water Utility $ 2,033,000 Sanitary Utility $ 3,017,000 External Billings(Hydro, Rogers, Bell and Private Works) $ 1,006,245 Total Budget for this Phase of Work $ 7,564,245 B Estimated Surplus/(Deficit) for this Phase of Work (B - C) $ (832,848) D Transfer from Uncommitted Infrastructure $ 735,195 Estimated Surplus/(Deficit) from previous phases $ 97,653 E Total Estimated Surplus/(Deficit) $ 0 ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services ï ¨ ÷ ó í