HomeMy WebLinkAboutCSD-13-004 - Demolition Control Application - 317 Edwin StREPORT TO:Community & Infrastructure Services Committee
DATE OF MEETING:
January 28, 2013
SUBMITTED BY: Alain Pinard, Director of Planning
PREPARED BY:
Mat Vaughan, Planning Technician (519) 741-2200 x 7073
WARD(S) INVOLVED: Ward 10
DATE OF REPORT: January 4, 2013
REPORT NO.:
CSD-13-004
SUBJECT:
DEMOLITION CONTROL APPLICATION DC12/22/E/MV
317 EDWIN STREET
WILLIAM O’NEIL
Location Map: 317 Edwin Street
RECOMMENDATION:
That Demolition Control Application DC12/22/E/MV requesting permission to demolish
one (1) single detached dwelling located at 317 Edwin Street, owned by William O’Neil, be
approved with the following condition:
The Chief Building Official may authorize and issue a demolition permit under Section
33(6) of the Planning Act subject to the following condition:
ï ó ï
In the event that construction of the new dwelling unit is not substantially complete
within two years from the day demolition of the existing residential property is
commenced, the City Clerk may enter on the collector’s roll, to be collected in like
manner as municipal taxes, $20,000 for each dwelling unit contained in the residential
properties in respect of which the demolition permit is issued and such sum shall, until
the payment thereof, be a lien or charge upon the land in respect of which the permit to
demolish the residential property is issued.
REPORT:
The Community Services Department has received an application requesting the demolition of a
single detached dwelling located at 317 Edwin Street. The subject property is zoned Residential
Four Zone (R4) in the Zoning By-law and designated Low Rise Residential in the City’s Official
Plan.
The applicant plans to construct two new semi-detached dwelling units which are in conformity
with the existing zoning. In order to ensure that redevelopment of the site occurs in a timely
manner, staff are recommending a condition as permitted by the Planning Act. The demolition
permit would set out the condition imposing a fine of $20,000 for each dwelling unit if
redevelopment is not substantially complete within two years after the demolition has
commenced.
Photograph 1: Existing building proposed for demolition
Circulation Comments:
Planning staff circulated the application to internal departments. Their comments are attached
as Appendix “B”.
ï ó î
Planning Analysis:
Staff have taken all internal agency comments (see Appendix B) into consideration and have no
concerns with the proposed demolition. Staff are of the opinion that the proposed demolition will
have minimal impact on the adjacent lands and the overall neighbourhood. The proposed
demolition will permit the replacement of the demolished dwelling with two dwelling units
resulting in a net increase to Kitchener’s housing stock. The redevelopment of the site with the
new semi-detached dwellings is consistent with the intent of the Low Rise Residential
designation in the Official Plan and is a permitted use under the Residential Four (R-4) zone.
ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN:
The proposed demolition is required prior to the redevelopment of the subject site and will align
with the Kitchener Strategic Plan as it ensures the implementation of the community priority
Development with appropriate redevelopment that is consistent with Provincial, Regional and
City planning policies.
FINANCIAL IMPLICATIONS:
No new or additional capital budget requests are expected with this recommendation.
COMMUNITY ENGAGEMENT:
An information letter will be circulated to all property owners within 60 metres of the subject
property in advance of the Community and Infrastructure Services Committee Meeting dealing
with the subject application.
CONCLUSION:
Planning staff are satisfied that the proposed demolition is justified as the Owner intends to
rebuild two new semi-detached dwellings in the place of the existing dwelling unit. This will
increase the housing stock that is compatible with the neighbourhood in accordance with the
Official Plan and Zoning By-law. As such, staff recommends that Demolition Control Application
DC12/22/E/MV, requesting permission to demolish the existing single detached dwelling, be
approved subject to the condition outlined in the recommendation of this report.
REVIEWED BY:
Della Ross, Manager of Development Review
SUBMITTED AND
Michael May, Deputy CAO
ACKNOWLEDGED BY:
Community Services Department
List of Attachments:
Appendix A – Demolition Plan
Appendix B – Internal agency comments
ï ó í
ï ó ì
ï ó ë
ï ó ê