Loading...
HomeMy WebLinkAboutHK - 2013-02-05 - Proposal to Locate New Public Washrooms in Victoria ParkVictoria Park Public Washrooms Project Plan 1. Project Outline The existing washrooms at the boathouse in Victoria Park will not be available for public use under the terms of the new lease agreement with the tenant of that facility. Replacement of these washroom facilities to service the needs of park patrons in this area of the park is the objective of this project Infrastructure Services Department Staff Report INS -043 provided Council with the background on this issue and presented several options. All of these options are to be reviewed by the public and a recommendation made to Council prior to proceeding with implementation of the preferred option. 2. Public Consultation The Planning and Strategic Services Committee of Kitchener Council, at their meeting May 7, 2012, resolved: "... that Options 2,3 and 4 as outlined in INS Department Report # INS -034, be the options tabled for public input as to location only of additional permanent washrooms in Victoria Park; and that staff report back to the September 10, 2012 Planning and Strategic Services Committee meeting on the findings of the public engagement process with recommendation(s)." Option 2: Public washrooms at a renovated 79 Joseph St Option 3: New washroom building near the parking lot at David St /Jubilee Dr. intersection Option 4: Public washrooms installed in the 'Front Garage' near the Water St. entrance to the park A public meeting is proposed for January 30, 2013, 6:30 to 8:00 p.m. at the Victoria Park pavilion. A staff recommendation for the preferred location /option will be presented to Planning and Strategic Initiatives Committee at their regularly scheduled meeting February 25, 2013 which includes a summary of the public consultation A second public meeting may be held prior to construction to advise resident s of the final design and the construction staging. 3 -1 3. Heritage Issues As Victoria Park and the surrounding area are located within a heritage conservation district, the implementation of any of these options will require formal heritage approval under the Ontario Heritage Act. Further, the option to construct a new washroom building (Option 4) may require additional study through the submission of a scoped Heritage Impact Assessment, to address potential impacts on Victoria Park as a cultural heritage landscape. 4. Timing January 2013 A public meeting to review possible washroom location options only to be held at Victoria Park Pavilion on January 30th. February 2013 Staff to attend Heritage Kitchener meeting on February 5, 2013 to present washroom location options for their information only and comments or suggestions. Staff report to Community and Infrastructure Services Committee February 25, 2013. This report will present a staff recommendation for a preferred location for new public washrooms, based on input from the public meeting and Heritage Kitchener. Deadline for report submission to Director is February 11, 2013 March 2013 Following Council approval of the recommended option and location the project will be managed by the Facilities Management Division as a design and construction project. This will begin with the preparation of terms of reference and request for proposals for an architectural consultant for design services related to building renovation or new building as approved by Council. If a new building is the approved option, Staff will need to confirm whether a scoped Heritage Impact Assessment is required as a condition of the processing of a Heritage Permit Application, and proceed immediately with engaging a professional consultant if such study is required, to ensure timely completion of the study and review by Heritage Kitchener. April 2013 A Heritage Permit Application for building renovations or new building shall be submitted to Heritage Planning Staff by April 26, 2013. This shall include all requirements of this application. Should a new building be approved by Council as the preferred option, a Heritage Impact Assessment for a new building may be required as part of this application. 3 -2 June 2013 Presentation of final building renovations or new building design to Heritage Kitchener at their meeting June 4, 2013. Preparation of final tender drawings and construction contract for tendering. July 2013 Tender period for washroom building contract. August 2013 Construction tender award at Council meeting of August 26, 2013 March 2014 To qualify for 50% funding as provided through the federal grant program, all invoices for construction work shall be submitted prior to March 31, 2014. April 2014 New washrooms available for public use S. Divisional Responsibilities Parks Operations Staff of Parks Operations, Design and Development will organize the public meeting and initial discussions with Heritage Kitchener. These consultations will form the basis of the staff recommendation and report to Community and Infrastructure Services Committee and Council proposing a preferred washroom location and option. Facilities Management Following Council approval of the washroom location and preferred option, Facilities Management will assume responsibility for implementation of the preferred option as a design and construction project. 6. Summary This project includes the following key requirements: • Public consultation for location within Victoria Park • Heritage Kitchener review of preferred option • Council review and approval • Heritage Permit Application approval (a scoped Heritage Impact Assessment may be required for a new washroom building) • Architectural consulting for building design 3 -3 • Site Plan Application and Building Permit processes • Construction tender award by the summer of 2013 • Deadline for construction completion and invoicing by March 31, 2014 to qualify for federal grant program WS 2013 -01 -15 3 -4 LM M �o u" w� = z w z s � F z 0 m 0 z z r� m U o z 0 aQo L 5 C) 0 0y U . • Y Q: I 10 3 �a O� 0 Y 0~ UD <0 v wo O d V 0 s#- ` 00 z - V b p +� m o y , 0 � P 1 Q s 0 0 d z O0 w0 - o Z~ w a r� e r y s� o ¢ .0 o� o a a L /� �a �� zo w� ap Sao 0 w >M O� .. -.r. ' .. 00NO rnQ Kw G� w 0011 x S> K 0O KSm o �d� Oo 'o �¢� o iiz�� d N 00O�00< O x �zW F-¢ 3Z3 Om 3 OHS mx WN ¢wZp N ¢¢m 0(� lo wQ x� -F ° 3:<M ¢rZ ° Zno �� c�¢z zw¢ O$ Up z0 j�0 x m..m..3w 00 1 myxjw m> pZW ZW QH(AUmw ` HV1I�NZHZ NK vw¢i =v' za mJ� zo wa c~/1°mJ000N °m J000QwZo cn Z p~J =0 zl¢ x� UN w�p ��Uwwwa o�cn cn cn+H MUw dw Zw Ow.. oL c 0 �rcnv z >z0 O O O Z OHww X Z> N z w K z W N Y j a M¢ p ¢p w Z w K N v w 0, Z Q Z z Y w O U O¢¢¢ U W O O O O E O K O o U O¢ N¢ J> w¢ a O a Z �_ m �_ O F p w 0¢ x¢ 0 0 e J Q= m m m LL < x m 11 m m o Z m \ dd000 dwOQ �OO FLl o��w dKQ�w o03s? dw� aKm QVIQ X03.. VIQ LM M