REPORT TO:Committee of the Whole
DATE OF MEETING:
2013-03-04
SUBMITTED BY: Larry Gordon, Director of Supply Services, 7214
PREPARED BY:
Larry Gordon, Director of Supply Services, 7214
WARD(S) INVOLVED: 6
DATE OF REPORT: 2013-02-12
REPORT NO.:
FCS-13-021
SUBJECT:
E13-010 – Consultant Services – Block Line Road
Improvements (Strasburg Road to Homer Watson
Boulevard)
RECOMMENDATION:
That Expression of Interest E13-010 – Consultant Services – Block Line Road Improvements
McCormick Rankin, Kitchener,
(Strasburg Road to Homer Watson Boulevard), be awarded to
Ontario
at their estimated fee of $82,383., including contingencies of $7,489. plus H.S.T. of
$10,710., for a total of $93,093., based on a satisfactory contract being negotiated and an upset
fee being established.
BACKGROUND:
Block Line Road, between Strasburg Road and Homer Watson Boulevard, is approximately 0.8
km long. The roadway is designated as a secondary arterial road in the City’s Official Plan.
The roadway is approximately 15 meters wide and has two traffic lanes plus a left turn lane at
intersections and concrete curb and gutter. The road presently has two marked on-street
bicycle lanes. This road requires improvements in order to be able to adequately address the
increase in traffic that is anticipated as a result of the extension of Block Line to Courtland
Avenue. Further, Block Line Road is identified as a core cycling facility within the Cycling
Master Plan and the inclusion of cycling facilities are required to maintain the integrity of the
City’s cycling infrastructure. Off-road multi-use trails will be installed on both sides of road to
address the need to accommodate all users (cyclists and pedestrians) in addition to vehicular
traffic.
This assignment includes detailed design and tendering of Block Line Road from 200m south of
Strasburg Road to Homer Watson Boulevard (approximately 800m long stretch) in keeping with
the recommendations of Traffic Operations Analysis Report, May 2012 – Block Line Road from
Homer Watson Boulevard to Westmount Road.
1 i) - 1
REPORT:
In accordance with Chapter 170 of the Municipal Code pertaining to the Selection of
Professional Services/Consultants, a Consultant’s Review Committee was established
consisting of S. Shah, Design Engineer, Engineering Services, B. Cronkite, Transportation
Planning Project Manager, Transportation Services, B. Robinson, Director of Engineering
Services, Engineering Services and L. Gordon, Director of Supply Services.
Documents were forwarded to three (3) qualified parties, and by the closing date of Friday
th
January 18, 2013, three (3) responses had been received.
th
The review committee met on Wednesday, January, 30, 2013, to review the submissions. The
Committee elected to award the project to McCormick Rankin, Kitchener, Ontario.
The Committee rated consultants on the following criteria:
Evaluation of Proposed Project Manager
Completeness of the Proposal
Qualifications/Expertise
Variety & Quality of Disciplines In House/In Consortium
Past Performance
Knowledge of the City (re: this area)
Permanent Local Office
Amount of City Work Completed in the Past
Cost of Consultant Fees
A listing of the responding parties follows for your reference:
Hatch Mott MacDonald Kitchener ON
HDR Corporation Cambridge ON
McCormick Rankin Kitchener ON
ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN:
Theme: Financial Management
Strategic Direction: Ensure responsible use of public funds within a supportive policy
framework.
The City of Kitchener’s purchasing policies and practices ensure openness, fairness and
transparency in the procurement of goods and services.
1 i) - 2
FINANCIAL IMPLICATIONS:
Tender E13-010
Block Line Road Improvements (Widening)
The total budget for all phases of this project is $1,440,000.00
Estimated Cost for this Phase of Work
Tender E13-010 costs, including HST 93,092.79
less: HST rebate on tender (9,259.85)
Net Cost Being Awarded 83,832.94 A
Costs Incurred to Date 1,727.32
Projected Costs: Staff Time/Permitting/Material Testing 88,982.00
Total Estimated Cost for this Phase of Work 174,542.26 C
Budget for this Phase of Work
Federal Gas Tax 72,300.00
Development Charges 89,200.00
Cycling Master Plan (59500560) 18,500.00
Total Budget for this Phase of Work 180,000.00 B
Estimated Surplus/(Deficit) for this Phase of Work (B - C) 5,457.74 D
The surplus will be retained in the account for use towards the construction phase.
COMMUNITY ENGAGEMENT:
Not applicable.
ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate
Services
1 i) - 3