REPORT TO:
Community & Infrastructure Services Committee
DATE OF MEETING:
March 18, 2013
SUBMITTED BY:
Wally Malcolm, Director of Utilities, 4538
PREPARED BY: Angela Mick / Matt Ryan, Utilities Water Engineer, 4408
WARD(S) INVOLVED:
All
DATE OF REPORT:
March 12, 2013
REPORT NO.:INS 13-008
SUBJECT:Drinking Water Quality Management Standard (DWQMS)–
Management Review Summary for 2012
RECOMMENDATION:
For information
BACKGROUND:
One of recommendations from Justice O’Connor’s Part Two Report of the Walkerton Inquiry
was that “The Ministry of the Environment should require the owners of municipal water systems
to obtain an owner’s licence for the operation of their waterworks”. Justice O’Connor also
recommended that the Owners and Operating Authorities of these systems implement a quality
management approach to operations and management. As a result of these recommendations
a Drinking Water Quality Management Standard (DWQMS) under the Safe Drinking Water Act,
2002 was released in October 2006.
The Safe Drinking Water Act, 2002 andRegulation 188/07, requires the City of Kitchener to be
licensed to operate and maintain Kitchener’s Water Distribution System. Some of the licensing
requirements include the development and management of a Quality Management System
(QMS) and Operational Plan as well as communication to the Owner. The City of Kitchener
became licensed in August, 2009 with a Financial Plan submitted in July, 2010.
Section 19 of the Safe Drinking Water Act imposes a statutory standard of care on persons who
oversee the municipal drinking water system: “…every person who, on behalf of the
municipality, oversees the accredited operating authority of the system or exercises decision-
making authority over the system.” This standard of care includes Council since they have
decision-making authority. Part of the standard of care includes requiring system owners to
undertake financial planning and implement a QMS.
REPORT:
This report represents the fourth annual Management Review Summary prepared in
accordance with the DWQMS (summary of 2012). The DWQMS requires Top Management to
“report the results of the management review, the identified deficiencies, decisions and action
items to the Owner”.
7 - 1
Top Management is defined as “a person, persons or group of people at the highest
management level within an Operating Authority that makes decisions respecting the QMS and
recommendations to the Owner respecting the subject system or subjects systems”. The Owner
of the water utility is the Corporation of the City of Kitchener, represented by City Council.
A Management Review was completed by Wally Malcolm and Tammer Gaber (Top
Management) along with Angela Mick, Matt Ryan and Parmi Takk on March 8, 2013 in
accordance with the Standard. The following is a high-level summary of the minutes (a copy of
the Management Report is attached):
Accomplishments During 2012
Working with CityWorks team for direct data correction/entry for assets (hydrants
previously completed in early 2012 and water valves are now complete as well).
Relevant collected data entered by admin staff so follow-up work orders for repairs can
be completed
Working with GIS and Engineering to refine As-built process to allow for easier updating
of new/replacement infrastructure
Continuing data corrections in GIS have resulted in better data in the field and better
data for replacing infrastructure. To date over 900 record changes as well as numerous
attribute changes from field staff and engineering have been made. The data integrity of
the water system has improved as staff continues to use the data in the field and as data
is reviewed through a quality process.
All DWQMS related documents for the past five years have been organized in colour
coded binders
A temporary tool crib person has been hired for equipment control.
Summary
• CityWorks does not have all the inspection and data entry functionality required to
support the DWQMS maintenance programs; progress has been made with the manual
entry of hydrant inspection and valve turning data. Infrastructure information is not able
to be pulled out of the new version of CityWorks (team is working on this).
• Data entry relating to CityWorks and data integrity is a concern. The ability to correct
infrastructure data is essential. See end of the report for further details
• A bulk water fill location to replace 83 Elmsdale is required. A preliminary site (Battler
Yard) has been selected and will be part of a larger project to re-develop the site
• On-going high pressure issues are a concern. Regional Master Plan should address
these areas
• Backflow Prevention – In addition to administrative support, an additional full-time Cross
Connection Specialist is required to move the backflow prevention program forward. We
are currently only making very small gains in the properties with premise isolation.
Continuing with only one cross connection specialist will never allow us to ensure all
identified risks have proper premise isolation.
• Light Rapid Transit requirements may affect the Capital Forecast due to watermain
replacement requirements
7 - 2
ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN:
This reports relates to the community priority of “Being accountable for the work of creating the
best future for our city and its residents”.
FINANCIAL IMPLICATIONS:
N/A
COMMUNITY ENGAGEMENT:
Drinking Water Quality Management Policy is available on Kitchener Utilities Website.
ACKNOWLEDGED BY: Jim Witmer, Interim Deputy CAO, Infrastructure Services
7 - 3
Kitchener Utilities
2012 Management Review
Title: Management Review Control Number: 44
Revision: 5.0 Effective Date: March 8, 2013
DATE: March 8, 2013
TIME: 2:30pm Ï 4:00pm
LOCATION: RM B120
IN ATTENDANCE: Wally Malcolm, Tammer Gaber, Angela Mick, Matt Ryan, Parmi
Takk
Accomplishments During 2012
¤ Working with CityWorks team for direct data correction/entry f
previously completed in early 2012 and water valves are now comp
Relevant collected data entered by admin staff so follow-up work
can be completed Working with GIS and Engineering to refine As-b
allow for easier updating of new/replacement infrastructure
¤ Continuing data corrections in GIS have resulted in better dat
data for replacing infrastructure. To date over 900 record chang
numerous attribute changes from field staff and engineering have
data integrity of the water system has improved as staff continu
the field and as data is reviewed through a quality process.
¤ All DWQMS related documents for the past five years have been
coded binders.
¤ A temporary tool crib person has been hired for equipment cont
Summary
¤ CityWorks does not have all the inspection and data entry func
support the QMS maintenance programs; progress has been made wit
entry of hydrant inspection and valve turning data. Infrastruct
able to be pulled out of the new version of CityWorks (team is w
(See back of report for a list of outstanding items).
¤ Data entry relating to CityWorks and data integrity is a conce
correct infrastructure data is essential. See end of the report
¤ A bulk water fill location to replace 83 Elmsdale is required.
(Battler Yard) has been selected and will be part of a larger project to re-develop the
site
¤ On-going high pressure issues are a concern. Regional Master
these areas
¤ Backflow Prevention Ï In addition to administrative support, an additional full-time
Cross Connection Specialist is required to move the backflow pre
forward. We are currently only making very small gains in the p
premise isolation. Continuing with only one cross connection specialist will never
allow us to ensure all identified risks have proper premise isol
Page 1 of 21
7 - 4
¤ Light Rapid Transit requirements may affect the Capital Foreca
replacement requirements
Item Item Discussed Action ByTiming
#
1.
Incidents of Regulatory Non-Compliance
On January 31, 2013 the City of Kitchener received a MOE Inspect
Report of the water distribution system for the period of Septem
1, 2011 to December 31, 2012. There were two incidents of
Regulatory Non-Compliance stated in Inspection Report. They wer
The first non-compliance was in regards to a delay in reporting
chlorine residual due to confusion in regards to the ownership o
watermain by our Construction & Maintenance staff. The required
notification was provided to the MOE once the low chlorine adver
was identified to the Utilities Engineering staff. Subsequently
refresher training was provided to all water operators with resp
notification requirements for adverse water quality incidents.
refresher training was provided, the MOE indicated that no furth
No Further
action was required at this time.
Action
The second non-conformance was in regards to the lead sampling
Required Ï
program not being properly reported to the MOE. Within 30 days
Information
of the end of each lead sampling period an ÑEnd of Period ReportÒ
Only
summary is to be submitted to the MOE. Conversely, we had been
submitting the ÑCommunity Lead Testing Sampling and Action LogÒ
which is a more in depth report. Once this omission was noted,
ÑEnd of Period ReportsÒ were submitted and a new Drinking Water
Quality Management System (DWQMS) Work Instruction was
created to ensure that all requirements of the community Lead
sampling program are complied with in the future. As the End of
Period Reports were submitted and the DWQMS Work Instruction
was created, the MOE indicated that no further action was requir
at this time.
2.
Incidents of Adverse Drinking Water Tests
There were 25 Adverse Water Quality Incidents (AWQI) during 2012
the majority of which were low chlorine. Other noted AWQIÔs wer
No Further
due to the presence of Total Coliforms and Lead exceedances.
Action
Required Ï
There were 5 lead exceedances in the plumbing system, 3 in the
Information
distribution system in 2012. Therefore, we can continue to comp
Only
a reduced lead sampling program in 2013.
Graphs have been provided at the end of the report
7 - 5
Item Item Discussed Action ByTiming
#
3.
Deviations from Critical Control Points Limits and Response Acti
There have been 59 watermain breaks between January 1, 2012 and
December 31, 2012. Incident debriefs are completed for watermai
breaks. Watermain break information is available in GIS and is
No Further
updated at least annually. This information will help to determi
Action
priorities for replacement (see graphs at end of report Ï yearly
Required Ï
comparison of breaks by pipe material as well as monthly
Information
comparison of breaks)
Only
Watermain break costs for 2012 will not be fully processed until
fall after the restoration is complete. 2011 costs for 107 wate
breaks was $875,000, with an average cost of $8,700/break. The
Average cost is comparable to 2010 values.
4.
Efficacy of the Risk Assessment Process
A risk assessment was completed on June 18, 2012 with two
supervisors, temporary crew leader, QMS rep, Cross-Connection
Specialist, QMS Specialist and Wilmot rep in attendance. See att
updated risk assessment table.
The following is a summary of changes made to the risk assessmen
table in 2012:
The risk associated with inaccurate records or no access to
o
records has decreased due to ArcReader now being available
on laptops and the record change procedure.
Changes to Key Customer List to be conveyed to Dispatch by
o
No Further
QMS Specialist
Action
New Risk Ï only one watermain feed to Sportsworld/Deer
o
Required Ï
Ridge subdivision area Ï not a Critical Control Point, but a
Information
new WI was prepared to address a watermain break to this
Only
area.
Township of Wilmot in the process of obtaining a backflow
o
by-law, this is now in place.
New construction work in Mannheim/Shingletown not
o
always communicated to KU. Wilmot rep. to look into this.
Summary of Cross Connection Program (includes the Bulk Water Fil
as of December 31, 2012: 1451 services that are protected by
Backflow Prevention (BFP) devices (premise isolation) and a tota
2100 devices (includes internal devices). Approximately 4190
properties require premise isolation (see graph at end of Report
The Bulk Water Fill station that is currently located at Elmsdal
to be relocated Ï Battler Yards is most cost effective option an
currently undergoing a re-development design that would
incorporate the new Bulk Water Fill Station.
7 - 6
Item Item Discussed Action ByTiming
#
5.
Results of DWQMS Internal and External Audits
An External Audit was not completed in 2012. Going forward,
MOE is using an external contractor to conduct these audits; KU
has selected SAI Global to complete this work. It is anticipate
that the external audit will be completed in the summer of 2013
Elements of the standard are internally audited monthly from Jul
to March. Currently three elements remain to be audited for this
cycle. To date there have been 11 minor non-conformances and 1
No Further
major non-conformances. The major non-conformance was
Action
related to the Training Matrix which was found to be out of date
Required Ï
and with errors and omissions. The entire matrix was cross-
Information
checked with all the training records in the personnel files and
Only
been updated and corrected by Admin staff. Looking forward, i
is anticipated that the training of C&M personnel will be manage
through the PeopleSoft record management system.
6.
Results of Emergency Response Training/Testing
An Emergency Training program was developed and staff are to be
trained every two years. The last training was completed in
On Going
October/November 2011 and renewal training is scheduled for this
Training Ï
Fall
Information
Testing on watermain breaks are actual events and debriefs are
Only
completed for each event.
Training for Top Management and replacement Water Engineer
completed on January 27, 2012
Training for new Operations Manager completed on Dec 14, 2012
7.
Operational Performance
There needs to be an action plan regarding how we address pressu
that are >80psi and <100psi in the City e.g. individual Pressure
Reducing Valves (PRVs), Regional PRVs. This is an issue causing
Regional
Spring
damage and an action plan for affected residents is required. There is
Master Plan
2013
a Regional Master Plan where this issue has been brought forward
The Master Plan was expected to be complete in July 2012; howeve
it has been delayed until Spring 2013.
Static pressures continue to be mapped in GIS
7 - 7
Item Item Discussed Action ByTiming
#
8.
Follow-up Action Items from Previous Management Reviews
There needs to be an action plan regarding how we address pressu
Regional Spring
that are >80psi and <100psi in the City e.g. individual Pressure
Master Plan 2013
Reducing Valves (PRVs), Regional PRVs. New areas are captured b
individual PRVs. This is an issue causing damages. Ongoing
Data entry/inspection development continues. Ongoing Corporate Unknown
Implementati
Additional technological resources are required to support the Q
on
Significant resources have been spent to digitize records, howev
will only be a snapshot in time unless itÔs maintained. Laptops
Mobile Unknown
been provided to staff, however additional requirements need to
Strategic Plan
developed to increase functionality of the laptop. (e.g. Direct
of field data)
7 - 8
Item Item Discussed Action ByTiming
#
9.
Status of Action Items Identified Between Management Reviews
Corporate Unknown
Data entry from maintenance programs. Currently only hydrant
Implementati
inspections (spring and fall) and water valve maintenance have d
on
entry requirements. The issue is that the inspection data needs
entered in a short enough timeframe so that follow-up work can b
identified and completed. This is not currently occurring. For
example for fall dips, a list of second dips cannot be generated
because the information from the first dips has not been entered
Data entry in the field would resolve this issue (see below).
Inspection/maintenance screen development continues in CityWorks
Corporate Unknown
Implementati
City Works Asset Inspection Strategy Development draft report wa
on
completed in November 15, 2011. The report summarized inspectio
requirements for water as well as options for implementation. T
was a significant gap between the current state and the future s
(end goal of mobile digital entry). Various software solutions e
however they will still need to be customized. The CityWorks pro
will require Corporate implementation
Data integrity - the ability to correct data directly in CityWor
CityWorks Unknown
currently available. This will improve the data integrity since
Team/AM
in the data can be corrected easily. Corporate Assets has been
decommissioned. Although the intent of Corporate Assets was to b
able to modify the data, it did not work properly and the
functionality did not exist.
On-going meeting with the Region to discuss Operational Issues a
All Ongoing
keep communication channels open
The As-built/digital submission process for drawings was rolled
GIS/ Complete
for new subdivisions in 2011 and anticipated for reconstruction
Engineering
projects in 2012. The process/requirements were revised over 20
and were communicated in early 2012. This will allow for better
information in the field as well as less time for GIS to process
built drawings
AM Spring
Backflow Prevention Ï a memo was provided in 2011 outlining data
2013
entry requirements relating to the BFP program. Part time
administrative support has been allocated to maintain the
administrative side of the program. The By-Law is in the proce
being updated.
Top
Backflow Prevention Ï In addition to the required administrative
Management Unknown
requirement, an additional full-time Cross Connection Specialist
required to move the backflow prevention program forward. We
are currently only making very small gains in the properties wit
premise isolation. Continuing with only one cross connection
specialist will never allow us to ensure all identified risks ha
premise isolation.
7 - 9
Item Item Discussed Action ByTiming
#
10.
Regulatory Changes
No Further
Anticipated Backflow Prevention Regulation has still not materia
Action
however, it is still expected to be forthcoming. Changes to our
Required Ï
current by-law are required and are currently in progress. The
Information
changes will need to go to council for approval
Only
11.
Changes that May Affect DWQMS
CityWorks Ï the functionality is still not available to provide
maintenance activities however the new version is supposed to as
No Further
with thisÏ please see Resources Needed to Maintain the QMS
Action
RegionÔs Water Distribution Master Plan
Required Ï
Corporate Asset Management Project
Information
MOE looking into making changes to DWQMS Program. Staff are
Only
attending a two-day training session and will be provided an
opportunity to become aware and comment on the proposed
changes.
12.
Consumer Feedback No Further
Action
A process has been developed in CityWorks to capture customer
Required Ï
complaints (see chart at back of report). This consists of Probl
Information
Cause and Remedy and is working well
Only
13.
Resources Needed to Maintain the QMS
Data entry for CityWorks is also required to provide proof of wo
completed, particularly for maintenance. This is currently not
Information
done in a timely manner where it can be done and for most
Only
maintenance activities there is not a place to enter data. For e
data entry needs to be in real time so that follow-up work order
be generated in a timely manner (follow-up hydrant work must occ
before the winter). Alternatively a mobile solution would be bet
7 - 10
Item Item Discussed Action ByTiming
#
14.
Results of Infrastructure Review
Held meetings to finalize the 2013 reconstruction projects
Planning a Trenchless Watermain Program in 2013 to structurally
problem watermains who are not candidates for triple funded
projects.
Kitchener Zone 2 and 4 Optimization Study identifies the Regiona
trunk watermains for the newly developing area in southern
Kitchener. On-going meetings with the Region and CityÔs
Development group to ensure these recommendations are
incorporated in the development (both Regional and Municipal
watermain requirements)
Light Rapid Transit (LRT) Ï this project may impact the 10 year
capital forecast due to required watermain replacement/relocatio
Upsizing may also be needed since the route is anticipated to fu
development in the area. Resources may be an issue
No Further
Action
Region has commenced an Environmental Assessment to install a
Required Ï
750mm trunk zone 4 watermain from Mannheim Water Treatment
Information
Plant to Strasburg Road. The main was recommended through the
Only
Pressure Zone 2 and 4 Optimization Study to provide another much
needed source into Zone 4. They plan to have the study filed in
Summer 2013.
The Development Charges study will be updated in 2014 Ï report
includes identification of any major watermains required for
development.
Corporate Asset Management Project Ï unknown how this will
impact the way projects are prioritized for replacement in the c
forecast
RegionÔs Water Supply and Distribution Operations Master Plan ma
impact infrastructure requirements
Mannheim/Shingletown
There are no plans for new/replacement infrastructure in
Mannheim/Shingletown. There needs to be an agreement in place
for future replacement requirements of the infrastructure (see O
7 - 11
Item Item Discussed Action ByTiming
#
15.
Summary of Maintenance
Corporate Unknown
CityWorks does not have the functionality to determine operation
Implementati
performance. As of December, the only maintenance programs
on
developed with supplemental sheets and data entry was the spring
and fall hydrant inspections and valves. Supplemental sheets an
data entry need to be developed for the remaining maintenance
programs
Hydrant maintenance - spring and fall for all hydrants (includes
Mannheim/Shingletown)
Hydrant painting (includes Mannheim/Shingletown within rotation)
Dead end main flushing (includes Mannheim/Shingletown).
Valve turning (1/2 the city) (includes Mannheim/Shingletown ever
years)
Leak detection survey Ï 1/3 of city completed each year (include
Mannheim/Shingletown every 3 years). Follow-up is completed with
any identified leaks (in 2012, 373km of mains were surveyed
resulting in the identification of 1 service leak as well as thi
confirmed hydrant leaks)
Watermain cleaning was not completed in 2012. In the past there
had been routine watermain cleaning in response to numerous
discoloured water calls. There have been minimal discolured wat
calls in the last few years.
Anodes are installed on the existing watermain whenever it is
exposed (e.g. watermain breaks, valve repairs, hydrant repairs)
16.
Effectiveness of Maintenance
The effectiveness of the maintenance program is determined by th
following factors (see graphs at end of report):
Number of Adverse Water Quality Incidents
Water quality complaints
No Further
Number of watermain breaks
Action
Water purchases/water sales are presented in a graph at the end
Required Ï
the report. The target is to have a water loss of less than 10%.
Information
water loss values is approximately 8.5% (includes other water us
Only
that are accounted for but not billed Ï see graph at end of repo
Mannheim/Shingletown
There was one watermain break in Shingletown in 2012 on a
Regional watermain.
Kitchener is not responsible for reporting AWQIs
17.
Operational Plan
There were no significant changes to the Operational Plan, howev
No Further
there have been new work instructions and forms developed as par
Action
of the continuous improvement, watermain ownership has been
Required Ï
Information
summarized in the Operational Plan
Only
There were no significant changes to the Mannheim/Shingletown
Operational Plan, however responsibilities were clarified.
7 - 12
Item Item Discussed Action ByTiming
#
18.
Staff Suggestions
New position 2013
Refresher of water quality related information as well as genera
will review
information Ï 2 new refresher training programs have been
developed and will been incorporated as part of the training
program
QMS
Changes to the DWQMS are communicated quarterly to the staff and
Specialist Ongoing
these are posted on the screen for reference
New position
Paperwork Training Ï CityWorks new forms are being developed and
will review 2013
revised. Training cannot be completed until this is complete (s
CityWorks Inspection Strategy). Training has been complete on o
paperwork such as record changes.
19.
Other
Top Mgt 2013
Mannheim Agreement Ï discussion of agreement to operate the
Mannheim/Shingletown system Ï An operational level agreement
was developed in October 2011, however there need to be higher
level discussions - ongoing
Top Mgt 2013
Regional Agreement Ï discussion of agreement to operate the
Regional watermains Ï ongoing
Top Mgt 2013
Discussion of alternative of City-owned data loggers in 2013
A copy of this Management Review is to be provided to the
Angela Mick March
Township of Wilmot via Gary Charbonneau.
2013
20.
Summary of Infrastructure (end of 2012)
4068 hydrants Ï 4023 Kitchener owned, 45 Mannheim/Shingletown
884 km of watermain Ï 734km Kitchener owned, 28km Dual
No Further
owned, 114km Regional owned (22 km is supply), 6km
Action
Mannheim/Shingletown owned
Required Ï
7225 valves Ï 6571 Kitchener owned, 145 Dual and 450 Regional
Information
and 58 Mannheim/Shingletown owned.
Only
61388 service connections - 61120 Kitchener and 268 for
Mannheim/Shingletown.
A breakdown of watermain infrastructure by age and material are
included at the back of the report.
21.
Next Meeting
Tammer March
Council date for Summary of Management Review Ï March 18, 2013
Gaber & 2013
Quarterly Management Review Ï June 12, 2013
Angela Mick
Please report any errors or omissions.
Report prepared by: Angela Mick, Matt Ryan & Parmi Takk
7 - 13
CityWorks Ï Data Entry Requirements
Asset Requirement Complete Outstanding Comments
Hydrants Add hydrant X
statics
Ability to X Current
generate method
follow-up requires data
work orders entry and is
based on labour
inspection intensive and
(spring and time sensitive.
fall) Increased risk
of a missed
follow-up
Valves Add number X Ïnot yet Back log of
of turns entered turns requiring
entry
Ability to X
generate
follow-up
work orders
based on
inspections
Watermains Ability to X Currently a
directly alter work around
asset attributes with GIS
(data
correction)
Water Quality Method to X Working Well
Complaints record
problem,
cause and
remedy
7 - 14
7 - 15
7 - 16
7 - 17
7 - 18
7 - 19
7 - 20
7 - 21
7 - 22
7 - 23
7 - 24