HomeMy WebLinkAboutFCS-13-066 - E13-019 - Consultant Services - Water St S Road Reconstruction REPORT TO:Committee of the Whole DATE OF MEETING: 2013-04-29 SUBMITTED BY: Larry Gordon, Director of Supply Services, 519-741-2200 ext. 7214 PREPARED BY: Larry Gordon, Director of Supply Services, 519-741-2200 ext. 7214 WARD(S) INVOLVED: 9 DATE OF REPORT: 2013-04-18 REPORT NO.: FCS-13-066 SUBJECT: E13-019 – Consultant Services – Water Street South (King Street to Joseph Street) Road Reconstruction RECOMMENDATION: That Expression of Interest E13-019 – Consultant Services – Water Street South (King Street to IBI Group, Waterloo, Ontario Joseph Street) Road Reconstruction, be awarded to at their estimated fee of $113,448.50, including contingencies of $10,313.50, plus H.S.T. of $14,748.31, for a total of $128,196.81, based on a satisfactory contract being negotiated and an upset fee being established. BACKGROUND: The surface infrastructure on Water Street South between King Street and Joseph Street has generally reached the end of its useful life and requires replacement. The project involves the proposed replacement of road base, asphalt, curbs, and sidewalk. There is also a spot repair to the sanitary to be completed as part of this project. Streetscaping opportunities such as decorative lighting, sidewalk treatment and enhancements will be explored, subject to physical constraints and available funding. Consideration shall also be given to cycling opportunities. This project is intersected by Charles Street which is a planned Rapid Transit (RT) corridor. Timing of construction and physical limits of the City’s work may be subject to the Rapid Transit construction schedule in this area. It is anticipated that the construction component will begin in spring 2014. REPORT: In accordance with Chapter 170 of the Municipal Code pertaining to the Selection of Professional Services/Consultants, a Consultant’s Review Committee was established consisting of S. Allen, Manager, Engineering Design and Approvals, J. Seip, Engineering Technologist, Engineering Services, Bryan Bishop, Construction Project Manager, Engineering Services, and L. Gordon, Director of Supply Services. 1 iv) - 1 Documents were sent to three (3) parties, and by the closing date of March 12, 2013, three (3) responses had been received. nd The review committee met on Tuesday April 2, 2013, to review the submissions. The Committee elected to award the project to IBI Group, Waterloo, Ontario. The Committee rated consultants on the following criteria: Evaluation of Proposed Project Manager Completeness of the Proposal Qualifications/Expertise Cost of Consultant Fees Past Performance Knowledge of the City (re: this area) Permanent Local Office Amount of City Work Completed in the Past A listing of the responding parties follows for your reference: Conestoga Rovers & Associates Waterloo ON Hatch Mott MacDonald Kitchener ON IBI Group Waterloo ON ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: Theme: Financial Management Strategic Direction: Ensure responsible use of public funds within a supportive policy framework. The City of Kitchener’s purchasing policies and practices ensure openness, fairness and transparency in the procurement of goods and services. 1 iv) - 2 FINANCIAL IMPLICATIONS: The net cost for this tender (A), is fair and reasonable for a purchase of this scope and the upset limit is within the budget allowance (B) provided within the budget. Funding for this purchase is included within the approved capital budget. The estimated surplus (D) will remain within the project, to fund future work. Tender E13-019 Water St S Surface Reconstruction The total budget for all phases of this project is $ 894,313.00 Estimated Cost for this Phase of Work Tender E13-019 costs, including HST 128,196.81 less: HST rebate on tender (12,751.61) Net Cost Being Awarded 115,445.20 A Costs Incurred to Date - Projected Costs: Staff Time/Permitting/Material Testing 48,072.00 Total Estimated Cost for this Phase of Work 163,517.20 C Budget for this Phase of Work Capital out of Current 6,312.50 Federal Gas Tax Reserve 199,000.00 Total Budget for this Phase of Work 205,312.50 B Estimated Surplus/(Deficit) for this Phase of Work (B - C) 41,795.30 D COMMUNITY ENGAGEMENT: Not applicable. ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services 1 iv) - 3