HomeMy WebLinkAboutFCS-13-079 - E13-028 - Consultant Services - Queens Blvd Reconstruction REPORT TO:Committee of the Whole DATE OF MEETING: 2013-05-13 SUBMITTED BY: Larry Gordon, Director of Supply Services, 519-741-2200 ext. 7214 PREPARED BY: Larry Gordon, Director of Supply Services, 519-741-2200 ext. 7214 WARD(S) INVOLVED: 9 DATE OF REPORT: 2013-05-03 REPORT NO.: FCS-13-079 SUBJECT: E13-028 – Consultant Services – Queens Boulevard (Rex Street to Belmont Avenue) Reconstruction RECOMMENDATION: That Expression of Interest E13-028 – Consultant Services – Queens Boulevard (Rex Street to IBI Group, Waterloo, Ontario Belmont Avenue) Reconstruction, be awarded to at their estimated fee of $265,405.80, including contingencies of $24,127.80 plus H.S.T. of $34,502.75, for a total of $299,908.55, based on a satisfactory contract being negotiated and an upset fee being established. BACKGROUND: The infrastructure for Queen’s Boulevard has generally reached the end of its’ useful life and requires full replacement. Queens Boulevard between Rex Drive and Belmont Avenue splits at approximately Rex Drive into a one way only circular road which surrounds a piece of land occupied by St. Mary’s Hospital and then the road joins again at the south end of the circle into a four lane road up to Belmont Avenue The entire length of road to be reconstructed including each side of the circular road is approximately 720 m. The outer limit of the roadway is bordered by residential properties and parking lots, while the inner limit is occupied by the St. Mary’s General Hospital. The section of roadway around St. Mary’s Hospital is one way and the pavement width is approximately 8.5 m. The section of roadway between the hospital and Belmont Ave has four lanes and the pavement width is approximately 14m. All sections have concrete curbs, sidewalks and gutters on both sides of the roadway. The project involves the proposed replacement of underground sewers, watermains, curbs, sidewalk and services to the property line along Queens Boulevard from Rex Drive to Belmont Avenue. The pavement will be reconstructed for the full width of Queens Boulevard. It is expected that the construction component will begin in Spring 2014, utilizing one construction tender and will be completed by the Fall of 2014. 1 iii) - 1 REPORT: In accordance with Chapter 170 of the Municipal Code pertaining to the Selection of Professional Services/Consultants, a Consultant’s Review Committee was established consisting of S. Daniel, Design and Construction Project Manager, Engineering Services, D. Lupsa, Design and Construction Project Manager, Engineering Services, R. Trussler, Engineering Construction Project Manager, Engineering Services, and L. Gordon, Director of Supply Services. Expressions of interest were advertised publicly on the City of Kitchener website and on the internet through the Ontario Public Buyers Association Electronic Tendering Information System relative to this project. Documents were downloaded by twenty-six (26) interested parties, and th by the closing date of Wednesday March 27, 2013, seven (7) responses had been received. th The review committee met on Wednesday, April 10, 2013, to review the submissions and a shortlist of three (3) candidates was selected for further interviews. The Committee met on th Thursday April 25, to interview the shortlisted candidates. The Committee elected to award the project to IBI Group, Waterloo, Ontario. The Committee rated consultants on the following criteria: Evaluation of Proposed Project Manager Completeness of the Proposal Qualifications/Expertise Variety & Quality of Disciplines In House/In Consortium Past Performance Knowledge of the City (re: this area) Permanent Local Office Amount of City Work Completed in the Past Proposed Project Team Effect of Interview Cost of Consultant's Fees Effectiveness of work plan A listing of the responding parties follows for your reference: AMEC Environment & Infrastructure Kitchener ON Delcan Corporation Kitchener ON Gamsby and Mannerow Limited Kitchener ON Genivar Guelph ON IBI Group Waterloo ON MTE Kitchener ON WalterFedy Kitchener ON ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: Theme: Financial Management 1 iii) - 2 Strategic Direction: Ensure responsible use of public funds within a supportive policy framework. The City of Kitchener’s purchasing policies and practices ensure openness, fairness and transparency in the procurement of goods and services. FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this expression of interest, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time/Permitting/Material testing". Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in-house staff will include costs for inspection during construction and contract administration. The net cost for this expression of interest (A), is fair and reasonable for a purchase of this scope and the upset limit is within the budget allowance (B) provided within the budget. Funding for this purchase is included within the approved capital budget. The estimated surplus (E) will remain within the project, to fund future work and the 2014 budget request will be reduced. Expression of Interest E13-028 Queen's Blvd - Rex to Belmont Reconstruction The total budget for all phases of this project is $3,530,821.00 Estimated Cost for this Phase of Work Expression of Interest E13-028 costs, including HST 299,908.55 less: HST rebate on tender (29,831.60) Net Cost Being Awarded 270,076.95 A Costs Incurred to Date 12,694.66 Projected Costs: Staff Time/Permitting/Material Testing 116,780.78 Total Estimated Cost for this Phase of Work 399,552.39 C Budget for this Phase of Work Sanitary Utility 252,465.00 Storm Water Utility 102,232.00 Water Utility 170,140.00 Intensification Allowance (DC) 9,984.00 Federal Gas Tax 24,000.00 Total Budget for this Phase of Work 558,821.00 B Estimated Surplus/(Deficit) for this Phase of Work (B - C) 159,268.61 D Estimated Surplus/(Deficit) from previous phases - Total Estimated Surplus/(Deficit) 159,268.61 E 1 iii) - 3 COMMUNITY ENGAGEMENT: Potential vendors are informed of bid opportunities through the public posting of bid documents as outlined in the City’s Purchasing By-Law. Vendors, local media and the general public are informed of purchasing recommendations to Council through the public reports which are included with the Council agenda the week prior to the Council meeting. ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services 1 iii) - 4