Loading...
HomeMy WebLinkAboutFCS-13-080 - E13-029 - Consultant Services - David St and Ontario St Reconstruction REPORT TO:Committee of the Whole DATE OF MEETING: 2013-05-13 SUBMITTED BY: Larry Gordon, Director of Supply Services, 519-741-2200 ext. 7214 PREPARED BY: Larry Gordon, Director of Supply Services, 519-741-2200 ext. 7214 WARD(S) INVOLVED: 9 DATE OF REPORT: 2013-05-06 REPORT NO.: FCS-13-080 SUBJECT: E13-029 – Consultant Services – David Street (Joseph Street to Courtland Avenue West/Jubilee Drive) and Ontario Street South (Charles Street West to Joseph Street) Reconstruction RECOMMENDATION: That Expression of Interest E13-029 – Consultant Services – David Street (Joseph Street to Courtland Avenue West/Jubilee Drive) and Ontario Street South (Charles Street West to Joseph MTE Consultants Inc., Kitchener, Ontario Street) Reconstruction, be awarded to at their estimated fee of $181,194.70, including contingencies of $16,472.24 plus H.S.T. of $23,555.31, for a total of $204,750.01, based on a satisfactory contract being negotiated and an upset fee being established. BACKGROUND: The infrastructure for David Street (Joseph Street to Courtland Ave West/ Jubilee Drive) and Ontario Street South (Charles St W to Joseph St.) has generally reached the end of its’ useful life and requires full replacement. The portion of David Street is approximately 270 m long, while the portion of Ontario street south is approximately 120 m long. The project involves the proposed replacement of underground sanitary and storm sewers, watermains, curb and gutters, sidewalk, boulevards, driveway ramps, services to the property line and the entire pavement along both David Street and Ontario Street South. It is expected that the construction component will begin in Spring 2014, utilizing one construction tender and will be completed by the Fall 2014. REPORT: In accordance with Chapter 170 of the Municipal Code pertaining to the Selection of Professional Services/Consultants, a Consultant’s Review Committee was established consisting of S. Daniel, Design/Construction Project Manager, Engineering Services, J. Mishko, 1 iv) - 1 Traffic Technologist, Transportation Services, J. Stevenson, Engineering Construction Project Manager, Engineering Services, and L. Gordon, Director of Supply Services. Expressions of interest were advertised publicly on the City of Kitchener website and on the internet through the Ontario Public Buyers Association Electronic Tendering Information System relative to this project. Documents were downloaded by twenty-six (26) interested parties, and nd by the closing date of Tuesday April 2, 2013, nine (9) responses had been received. th The review committee met on Friday April 12, 2013, to review the submissions and a shortlist of three (3) candidates was selected for further interviews. The Committee met on Monday, th April 29, 2013 to interview the shortlisted candidates. The Committee elected to award the project to MTE Consultants Inc., Kitchener, Ontario. The Committee rated consultants on the following criteria: Evaluation of Proposed Project Manager Completeness of the Proposal Qualifications/Expertise Variety & Quality of Disciplines In House/In Consortium Past Performance Knowledge of the City (re: this area) Permanent Local Office Amount of City Work Completed in the Past Proposed Project Team Effect of Interview Cost of Consultant's Fees Effectiveness of work plan A listing of the responding parties follows for your reference: AECOM Kitchener ON AMEC Environment & Infrastructure Burlington ON Associated Engineering (Ont.) Ltd. Kitchener ON Conestoga Rovers & Associates Waterloo ON Gamsby and Mannerow Limited Kitchener ON Genivar Guelph ON IBI Group Waterloo ON MTE Consultants Inc. Kitchener ON WalterFedy Kitchener ON ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: Theme: Financial Management Strategic Direction: Ensure responsible use of public funds within a supportive policy framework. 1 iv) - 2 The City of Kitchener’s purchasing policies and practices ensure openness, fairness and transparency in the procurement of goods and services. FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this expression of interest, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time/Permitting/Material testing". Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in-house staff will include costs for inspection during construction and contract administration. The net cost for this expression of interest (A), is fair and reasonable for a purchase of this scope and the upset limit is within the budget allowance (B) provided within the budget. Funding for this purchase is included within the approved capital budget. Funding for this purchase is included within the approved capital budget. The estimated surplus (E) will remain within the project, to fund future work and the 2014 budget request will be reduced. Expression of Interest E13-029 David St / Ontario St Reconstruction The total budget for all phases of this project is $1,796,868.00 Estimated Cost for this Phase of Work Expression of Interest E13-029 costs, including HST 204,750.01 less: HST rebate on tender (20,366.28) Net Cost Being Awarded 184,383.73 A Costs Incurred to Date 18,010.14 Projected Costs: Staff Time/Permitting/Material Testing 87,743.00 Total Estimated Cost for this Phase of Work 290,136.87 C Budget for this Phase of Work Sanitary Utility 154,613.00 Storm Water Utility 62,306.00 Water Utility 103,978.00 Intensification Allowance (DC) 2,971.00 Federal Gas Tax 15,000.00 Total Budget for this Phase of Work 338,868.00 B Estimated Surplus/(Deficit) for this Phase of Work (B - C) 48,731.13 D Estimated Surplus/(Deficit) from previous phases - Total Estimated Surplus/(Deficit) 48,731.13 E 1 iv) - 3 COMMUNITY ENGAGEMENT: Potential vendors are informed of bid opportunities through the public posting of bid documents as outlined in the City’s Purchasing By-Law. Vendors, local media and the general public are informed of purchasing recommendations to Council through the public reports which are included with the Council agenda the week prior to the Council meeting. ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services 1 iv) - 4