Loading...
HomeMy WebLinkAboutFCS-13-092 - E13-033 - Consultant Serv - King Edward Nei Rd Reconstruction REPORT TO:Committee of the Whole DATE OF MEETING: 2013-06-10 SUBMITTED BY: Larry Gordon, Director of Supply Services, 519-741-2200 ext. 7214 PREPARED BY: Larry Gordon, Director of Supply Services, 519-741-2200 ext. 7214 WARD(S) INVOLVED: 9 DATE OF REPORT: 2013-05-28 REPORT NO.: FCS-13-092 SUBJECT: E13-033 – Consultant Services – King Edward Neighbourhood Road Reconstruction RECOMMENDATION: That Expression of Interest E13-033 – Consultant Services – King Edward Neighbourhood Conestoga-Rovers & Associates, Waterloo, Ontario Road Reconstruction be awarded to at their estimated fee of $449,350., including contingencies of $40,850. plus H.S.T. of $58,415.50, for a total of $507,765.50, based on a satisfactory contract being negotiated and an upset fee being established. BACKGROUND: The King Edward Neighbourhood (Glasgow Street from Walter Street to Park Street; Gruhn Street from Agnes Street to Glasgow Street; Wellington Street South from Walter Street to King Street West; Walter Street from Glasgow Street to Wellington Street South; Dominion Street from Strange Street to Agnes Street; and Agnes Street from King Street West to Dominion Street) reconstruction project has been initiated to address the infrastructure issues which currently exist. The infrastructure on these streets has generally reached the end of its useful life and requires full replacement. The project scope includes the design and reconstruction of all underground services (sanitary sewer, storm sewer and watermain) as well as sanitary and water services connections to the property line. The asphalt roadway will be reconstructed as well as sidewalks and curbs. Construction is expected to occur in two phases in 2014 and 2015. REPORT: In accordance with Chapter 170 of the Municipal Code pertaining to the Selection of Professional Services/Consultants, a Consultant’s Review Committee was established consisting of D. Lupsa, Design and Construction Project Manager, Engineering Services, B. Bishop, Design and Construction Project Manager, Engineering Services, S. Daniel, Design and Construction Project Manager, Engineering Services and L. Gordon, Director of Supply Services. 1 iii) - 1 Expressions of interest were advertised publicly on the City of Kitchener website and on the internet through the Ontario Public Buyers Association Electronic Tendering Information System relative to this project. Documents were downloaded by twenty-five (25) interested parties, and by the closing date of Monday April 22, 2013, eleven (11) responses had been received. nd The review committee met on Thursday, May, 2, 2013, to review the submissions and a shortlist of four (4) candidates was selected for further interviews. The Committee met on th Tuesday, May 14, 2013 to interview the shortlisted candidates. The Committee elected to award the project to Conestoga-Rovers & Associates, Waterloo, Ontario. The Committee rated consultants on the following criteria: Evaluation of Proposed Project Manager Completeness of the Proposal Qualifications/Expertise Variety & Quality of Disciplines In House/In Consortium Past Performance Knowledge of the City (re: this area) Permanent Local Office Amount of City Work Completed in the Past Proposed Project Team Effect of Interview Cost of Consultant's Fees Effectiveness of work plan A listing of the responding parties follows for your reference: AECOM Kitchener ON Amec Environmental & Infrastructure Burlington ON Associated Engineering Ltd Kitchener ON Conestoga-Rovers & Associates Waterloo ON Genivar Guelph ON Hatch Mott MacDonald Kitchener ON IBI Group Waterloo ON McCormick Rankin Kitchener ON Meritech Engineering Cambridge ON MTE Consultants Inc. Kitchener ON WalterFedy Kitchener ON ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: Theme: Financial Management Strategic Direction: Ensure responsible use of public funds within a supportive policy framework. The City of Kitchener’s purchasing policies and practices ensure openness, fairness and transparency in the procurement of goods and services. 1 iii) - 2 FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this expression of interest, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time/Permitting/Material testing". Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in-house staff will include costs for inspection during construction and contract administration. The net cost for this expression of interest (A), is fair and reasonable for a purchase of this scope and the upset limit is within the budget allowance (B) provided within the budget. Funding for this purchase is included within the approved capital budget. The estimated surplus (E) will remain within the project to fund 2014 and 2015 construction. The budget request for 2014 and 2015 construction will be reduced accordingly. Expression of Interest E13-033 King Edward Neighbourhood Reconstruction The total budget for all phases of this project is $ 7,430,025.00 Estimated Cost for this Phase of Work Expression of Interest E13-033 costs, including HST 507,765.50 less: HST rebate (50,506.92) Net Cost Being Awarded 457,258.58 A Costs Incurred to Date 25,081.80 Projected Costs: Staff Time/Permitting/Material Testing 222,996.00 Total Estimated Cost for this Phase of Work 705,336.38 C Budget for this Phase of Work Sanitary Utility 544,513.00 Storm Water Utility 252,707.00 Water Utility 366,954.00 Intensification Allowance (DC) 20,060.00 Revenue 19,551.00 Total Budget for this Phase of Work 1,203,785.00 B Estimated Surplus/(Deficit) for this Phase of Work (B - C) 498,448.62 D Estimated Surplus/(Deficit) from previous phases - Total Estimated Surplus/(Deficit) 498,448.62 E 1 iii) - 3 COMMUNITY ENGAGEMENT: Potential vendors are informed of bid opportunities through the public posting of bid documents as outlined in the City’s Purchasing By-Law. Vendors, local media and the general public are informed of purchasing recommendations to Council through the public reports which are included with the Council agenda the week prior to the Council meeting. ACKNOWLEDGED BY: Michael Goldrup, Acting Deputy CAO, Finance and Corporate Services 1 iii) - 4