Loading...
HomeMy WebLinkAboutFCS-13-096 - E13-096 - Consultant Serv - 2013 Bridge Investigations REPORT TO:Committee of the Whole DATE OF MEETING: 2013-06-10 SUBMITTED BY: Larry Gordon, Director of Supply Services, 519-741-2200 ext. 7214 PREPARED BY: Larry Gordon, Director of Supply Services, 519-741-2200 ext. 7214 WARD(S) INVOLVED: 4,8 DATE OF REPORT: 2013-05-30 REPORT NO.: FCS-13-096 SUBJECT: E13-049 Consultant Services – 2013 Bridge Investigations RECOMMENDATION: That Expression of Interest E13-049 Consultant Services – 2013 Bridge Investigations, be K. Smart Associates Limited, Kitchener, Ontario awarded to at their estimated fee of $39,693.50, including contingencies of $3,608.50 plus H.S.T. of $5,160.15, for a total of $44,853.65, based on a satisfactory contract being negotiated and an upset fee being established. BACKGROUND: The City wishes to retain a consultant with experience for a two part assignment related to the detailed evaluation of bridges in order to meet its legislated responsibility for ensuring the structural integrity of City owned bridges. The two parts are as follows: Part 1: In 2012, the City completed its cyclical biennial bridge structure inspection. Part of the results of this inspection was that three structures that are the City’s responsibility to maintain were recommended for more detailed investigation. The three bridges are: Pioneer Dr Bridge (#804), Greenbrook Plaza Culvert (#854), and the Belmont Ave Bridge (#830). This part of the assignment requires the consultant to conduct a detailed examination and investigation of these three structures in accordance with the MTO Structure Rehabilitation Manual and the Canadian Highway Bridge Design Code, produce a report of findings and analysis, and if necessary provide recommendations for any necessary remediation if required. If recommendations for work are produced, Class C cost estimates for the recommended works are to be provided. This work is expected to occur from June to August of 2013. Part 2: In addition to the work outlined in part (1), the City will keep this consultant on retainer until September 2014 on an as-needed basis for the purpose of unforeseen but necessary emergency site visits to any bridge structures that are the City of Kitchener’s responsibility to maintain that have incurred damage from incidents such as traffic accidents or acts of nature, or signs of sudden or unforeseen structural changes to a bridge that appear to have the potential to pose a risk to its continued safe operation. The purposes of any such visit will be to conduct a 1 vi) - 1 preliminary assessment of the overall situation as it relates to the condition and safety of the structure, and make short-term recommendations as a response to the situation (i.e. - close the bridge, specify short-term repairs, restricted use of the bridge, all clear, etc.). Since such circumstances are rare, it is very possible that this service will not be required over the 15 months of the retention period, and if so will require no costs to the City for this part of the assignment. REPORT: In accordance with Chapter 170 of the Municipal Code pertaining to the Selection of Professional Services/Consultants, a Consultant’s Review Committee was established consisting of R. Wheatley, Asset Management Technician, Engineering Services, G. McTaggart, Manager of Infrastructure Asset Planning, S. Allen, Manager of Engineering Design and Approvals, Engineering Services and L. Gordon, Director of Supply Services. Expressions of interest were advertised publicly on the City of Kitchener website and on the internet through the Ontario Public Buyers Association Electronic Tendering Information System relative to this project. Documents were downloaded by twenty-nine (29) interested parties, and th by the closing date of Wednesday May 15, 2013, five (5) responses had been received. th The review committee met on Tuesday May 28, 2013, to review the submissions. The Committee elected to award the project to K. Smart Associates Limited, Kitchener, Ontario. The Committee rated consultants on the following criteria: Evaluation of Proposed Project Manager Completeness of the Proposal Qualifications/Expertise Variety & Quality of Disciplines In House/In Consortium Past Performance Knowledge of the City (re: this area) Permanent Local Office Amount of City Work Completed in the Past Cost of Consultant Fees A listing of the responding parties follows for your reference: Chisholm, Fleming & Associates Markham ON GHD Mississauga ON K. Smart Associates Limited Kitchener ON MuirTec Inc. Waterloo ON Peto MacCallum Consulting Engineers Hamilton ON ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: Theme: Financial Management Strategic Direction: Ensure responsible use of public funds within a supportive policy framework. 1 vi) - 2 The City of Kitchener’s purchasing policies and practices ensure openness, fairness and transparency in the procurement of goods and services. FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this expression of interest, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time/Permitting/Material testing". Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in-house staff will include costs for inspection during construction and contract administration. The net cost for this expression of interest (A), is fair and reasonable for a purchase of this scope and the upset limit is within the budget allowance (B) provided within the budget. Funding for this purchase is included within the approved capital budget. The estimated surplus (E) will remain within the project to fund future work. Expression of Interest E13-049 Bridge Investigations The total budget for all phases of this project is $ 31,000.00 Estimated Cost for this Phase of Work Expression of Interest E13-049 costs, including HST 44,853.66 less: HST rebate on tender (4,461.55) Net Cost Being Awarded 40,392.11 A Costs Incurred to Date Projected Costs: Staff Time/Permitting/Material Testing 3,346.00 Total Estimated Cost for this Phase of Work 43,738.11 C Budget for this Phase of Work Contribution from Revenue 31,000.00 Total Budget for this Phase of Work 31,000.00 B Estimated Surplus/(Deficit) for this Phase of Work (B - C) (12,738.11) D Estimated Surplus/(Deficit) from previous phases 57,603.56 Total Estimated Surplus/(Deficit) 44,865.45 E COMMUNITY ENGAGEMENT: Potential vendors are informed of bid opportunities through the public posting of bid documents as outlined in the City’s Purchasing By-Law. Vendors, local media and the general public are informed of purchasing recommendations to Council through the public reports which are included with the Council agenda the week prior to the Council meeting. ACKNOWLEDGED BY: Michael Goldrup, Acting Deputy CAO, Finance and Corporate Services 1 vi) - 3