HomeMy WebLinkAboutFCS-13-110 - E13-046 - Consultant Serv - Rehabilitation of Watermains - Trenchless Technology
REPORT TO:Committee of the Whole
DATE OF MEETING:
2013-06-24
SUBMITTED BY: Larry Gordon, Director of Supply Services, 519-741-2200
ext. 7214
PREPARED BY:
Larry Gordon, Director of Supply Services, 519-741-2200
ext. 7214
WARD(S) INVOLVED: 1, 8, 9
DATE OF REPORT: 2013-06-14
REPORT NO.: FCS-13-110
SUBJECT:
E13-046 Consultant Services – Rehabilitation of
Watermains on Selected Streets using Trenchless
Technology (Structural Reline)
RECOMMENDATION:
That Expression of Interest E13-046 – Consultant Services – Rehabilitaiton of Watermains on
Conestoga-
Selected Streets using Trenchless Technology (Structural Reline), be awarded to
Rovers & Associates, Waterloo, Ontario
at their estimated fee of $103,400., including
contingencies of $9,400., plus H.S.T. of $13,442., for a total of $116,842., based on a
satisfactory contract being negotiated and an upset fee being established.
BACKGROUND:
The Expression of Interest was to provide engineering services for the design, contract
administration and inspection for the watermain relining of approximately 1.7km of watermain
using structural cured-in-place pipe relining. Candidates for relining are roads where the
watermain is in poor condition, however the other infrastructure (storm and sewer) are in good
condition. The streets are not candidates for triple-funded full reconstruction. The following
preliminary streets have been identified but are to be confirmed based on the consultant cost
estimate, available budget and other factors which may arise during the design phase:
StreetLimitsInstalledDiameterMaterialLength (m)
Westmount to easement near
GREENBROOK DR
Farmbrook1957200CI248
GREENBROOK DR
Easement To Farmbrook1957200CI30
HOFFMAN ST Ottawa St to cul-de-sac1956150CI244
HOFFMAN ST Ottawa St to Donley St1956150CI108
HOFFMAN ST Donley to Olympic1956150CI33
LYNDHURST DRArcher Pl to Nottingham1958150CI141
LYNDHURST DRNottingham Ave to Deerfield ave1958150CI219
LYNDHURST DRDeerfield Ave to Burbank1958150CI96
ARCHEROttawa to Lyndhurst1962150CI223
RUSKVIEW DRSweetbriar to Greenbrook1963150CI372
1 v) - 1
REPORT:
In accordance with Chapter 170 of the Municipal Code pertaining to the Selection of
Professional Services/Consultants, a Consultant’s Review Committee was established
consisting of A. Mick, Utilities Water Engineer, B. Bishop, Design and Construction Project
Manager, Engineering Services, and L. Gordon, Director of Supply Services.
Three (3) consulting firms were invited to provide Expression of Interests, and by the closing
date of May 14, 2013, three (3) responses had been received.
The review committee met on Friday, May 31, 2013 to review the submissions. The Committee
elected to award the project to Conestoga-Rovers & Associates, Waterloo, Ontario.
The Committee rated consultants on the following criteria:
Qualifications/Expertise
Proposed Project Team
Cost of Consultant’s Fees
Variety & Quality of Disciplines In House/In Consortium
Effectiveness of Work Plan
A listing of the responding parties follows for your reference:
Conestoga-Rovers & Associates Waterloo ON
MTE Consultants Inc. Kitchener ON
Walter Fedy Kitchener ON
ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN:
Theme: Financial Management
Strategic Direction: Ensure responsible use of public funds within a supportive policy
framework.
The City of Kitchener’s purchasing policies and practices ensure openness, fairness and
transparency in the procurement of goods and services.
1 v) - 2
FINANCIAL IMPLICATIONS:
The net cost for this expression of interest (A), is fair and reasonable for a project of this scope and
the upset limit is within the budget allowance (B) provided within the budget. Funding for this
project is included within the approved capital budget. The estimated surplus (E) will remain within
the account to fund future phases of the project.
Financial Summary for Expression of Interest E13-046
Consultant Services – Rehabilitation of Watermains on Selected Streets Using Trenchless
Technology (Structural Reline)
The total budget for all phases of this project is 750,000.00
Estimated Cost for this Phase of Work
Expression of Interest E13-046 costs, including HST 116,842.00
less: HST rebate on tender (10,484.76)
Net Cost Being Awarded 106,357.24 A
Projected Costs -
Estimated Cost for this Phase of Work 106,357.24 C
Budget for this Phase of Work 125,000.00 B
Estimated Surplus/(Deficit) for this Phase of Work (B - C) 18,642.76 D
Estimated Surplus/(Deficit) from previous phases -
Total Estimated Surplus/(Deficit) 18,642.76 E
COMMUNITY ENGAGEMENT:
Potential vendors are informed of bid opportunities through the public posting of bid documents
as outlined in the City’s Purchasing By-Law. Vendors, local media and the general public are
informed of purchasing recommendations to Council through the public reports which are
included with the Council agenda the week prior to the Council meeting.
ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate
Services