REPORT TO: Environment Committee
DATE OF MEETING: September 19, 2013
SUBMITTED BY: Steve Allen, P.Eng., Manager Engineering Design and
Approvals (519-741-2200 x7584)
PREPARED BY: Steve Allen, P.Eng., Manager Engineering Design and
Approvals (519-741-2200 x7584)
WARD(S) INVOLVED: Ward # 1
DATE OF REPORT: September 5, 2013
REPORT NO.: INS-13-085
SUBJECT: KOLB CREEK—CLASS ENVIRONMENTAL ASSESSMENT
RECOMMENDATION:
For Information
BACKGROUND:
The Kolb Creek watershed is located in the north eastern part of the City of Kitchener. The Kolb
Drain lies within a predominantly urban watershed with an area of approximately 455 hectares.
The creek was originally constructed as a drain in 1944 when the watershed was mostly rural.
Kolb Creek has been identified as cold water fish habitat.
A drainage study was completed in 1977 and updated in 1991 to define the effect that existing
and continued urbanization will have on the Kolb Drain. These studies concluded that
increased urbanization has created the potential for flooding on adjacent properties. The studies
also identified potential channel erosion. Improvements to the creek over the past 15 years
have included channel naturalization downstream of Smetana Drive.
In 2001, the City of Kitchener developed a Stormwater Management (SWM) Policy in order to
ensure that the most effective approach to SWM will be provided across the City. The 2001
Policy identified Kolb Creek as first priority for stormwater management and stream restoration
within the City of Kitchener due to the effects of urbanization impacting the watercourse.
The increased urbanization within the Kolb Creek drainage area and presences of undersized
culverts and crossings along the watercourse has created a potential for flooding on adjacent
properties and the potential for erosion. The downstream portion of the channel is tightly
confined between private properties, and contains a series of abrupt alignment changes with
hardened bed and banks. A portion of the study reach is channelized and even flows beneath a
parking lot and building upstream of the Natchez Rd. crossing. The purpose of this Class EA
and preliminary design is to generate and evaluate a series of alternatives to improve the
flooding issues found within the Kolb creek system while considering environmental and aquatic
improvements.
2 - 1
Staff Re r
InfrastructureServrresC9epartment wwkitchenera
Portions of Kolb Creek are confined to a narrow right of way, while other portions are contained
in a closed pipe system, a portion of which is located on private property.
The primary objective of the study is to determine a preferred alternative to alleviate local
flooding issues on the portion of Kolb Creek extending from Matthew St. to the existing SWM
facility east of Manchester Rd. The study will also evaluate the opportunities to retrofit an
existing stormwater management (SWM) facility within Forfar Park to improve water quality
within Kolb Creek. The study area is depicted in Figure 1.
tr...........
Figure 1 — Kolb Creek Study Area
REPORT:
The objective of the study is to determine a preferred alternative to alleviate local flooding
issues on the portion of Kolb Creek extending from Matthew St. to the existing SWM facility east
of Manchester Rd. The study will also evaluate the opportunities to retrofit the existing
stormwater management (SWM) facility within Forfar Park to improve water quality within Kolb
Creek.
Six alternatives to address the flooding problem along Kolb Creek were identified and are
described as follows:
Alternative 1 — Do Nothing
Kolb Creek remains in its current state and alignment.
2 - 2
Staff Re r
InfrastructureServrresC9epartment www.kitrhenerra
Alternative 2 — Overflow Sewer along Rothsay Avenue
This option involves the diversion of flows above approximately 7.5 cros* (1-in-5 year event) to
be conveyed along the North side of Rothsay Avenue within a subsurface circular pipe or box
culvert (approx.. 300m length). A new outlet would be required upstream of the existing
pedestrian bridge. All works are to be completed within City lands.
0, ------------- __________
OVERFLOWSEWER
,rig, �c,��^�� m� ��°w�u� �E¢� �u���:��;;���ua�o-• .w��.��::
00.
rw,... a;
a d r, dr
user
1s
� r
h.nllhU-1, hi l ristruutures Sure-ary.
rcCs 1 IY A l l V Y y
-,
�I )I.:ldv oo,, tr.r Llihlr
-
J y� w I 1a,6 n W a�ru r a,/'r Pn .
Mi'd ,iW .. r.
Y e
i6 0-11 wSv r.1 o€Gic Ul vu,A, }aag uvWl - �u�+) y �qq�$ I • yi.
W u
Intl .RBI i uatun tlni v r11i �.. y 1ti P
drJ
i a,i,r�IL",
l rc rl I v
c
a N ru IL { P al oar In idp, `r tlnf
n uumtrcr u..�,.
SCALE 1 1
79 0 49 W 15 A 76 15R 'S'SB 'p' � � r�u v Y'•.
METRES
1
2 - 3
Staff Re r
InfrastructureServrresC9epartment wwkitchenera
Alternative 3 — Increase Existing Capacity
This option involves increasing the existing stream capacity through replacement of the Rothsay
Avenue culvert, 'boring and jacking' beneath 1263-1271 Victoria St. N building to widen the
culvert (approximately 8 times the existing width of 2.6m to ultimate width of 20.8m),
construction of a new wider crossing along Natchez Road and increasing channel width east of
the Natchez Road crossing to upstream of the existing pedestrian bridge. Acquisition of one
private property and removal of one existing building is required. Works required on private
property and City lands.
�Oe�,
rY
R
MMENE
ALTERNATI VE NO- 3-
1N0,kEAS11,1, .NC S'11 ING S FREAM
KO LB(RJTK
00 GRANDWWR MHMARY
rmrlk -1-1 All
00,
K,Ah C—k Cr s,fi,g
R,M (0—( )u).a u,,noil
Wxdk,Put 0- ,PWI S�Ilfilll, 1,pn
Q hw—1 widfl,If,,
SCALE 1:1500
.... ......
76 90 OS 20 16 0 76 ISO 22fi
�ITSI,S
2 - 4
Staff Re r
InfrastructureServrresC9epartment wwkitchenera
Alternative 4— Reroute Stream along Rothsay Avenue
This option involves the realignment of Kolb Creek adjacent to Rothsay Avenue by extending
the downstream easement along Rothsay Avenue up to and including the replacement of the
Rothsay Avenue culvert. Portions of existing channel would be filled-in and the box culvert
beneath 1263-1271 Victoria St. N building and Natchez Road crossing would be
decommissioned. Works are required on private property and City lands. Acquisition of two
private properties and a portion of one property which fronts Rothsay Avenue would be
required. The removal of three existing buildings and establishment of a new outlet to the
existing 600mmstorm sewer would be required.
71 ..........................
Reclaim
(Ffll•m channell
Abandon�
claim decornaIission Al,'FERNAWIVE NOA
ill4nCharmal) REROUTE SHMEAM ALONG
ROTHSAY AVE
KLB C R U
(iRAND R OIVH� K FARY
M K11h C-1-9 R,All.
4%
Y-4-�,P-
"'Z Kolb Ceeh ing S Iry
A-1-d"IL lh,ihlhr,g
4
ki,fl"g 1014,
R
'J(�J , Abk & h
i,. � k md,,:u
pit,
Nold—Rd lJ n.......r S,-,-h1k,,
1 A
TK M,Ck R W-V Hoh, A-
M 3,0 al p,y,r,1 2,
A
&
" (1
SCALE 1160C
✓5 60 45 30 15 0 76 1S0 225
MEIRES ..........................:::..1 _ .....................
2 - 5
Staff Re r
InfrastructureServrresC9epartment wwkitchenera
Alternative 5— Reroute Stream between buildings
This option involves the realignment of Kolb Creek along Rothsay Avenue between existing
buildings. Portions of the existing channel would be filled-in and the box culvert beneath 1263-
1271 Victoria St. N and Natchez Road crossing would be decommissioned. Works required
would be conducted on private property and City lands. Acquisition of one private property and
a portion of one property which fronts Rothsay Avenue would be required as well as the removal
of two existing buildings and establishment of a new outlet to the existing 600mm storm sewer.
,
VOA
Re6airn
(Fill-in channeit)
TMT_ Tr-
Ab,andord NL.
decminiission A I I EANATWE'NM5-
RERO tiTE STREAN111 BEMEFN
(FllH6C4ann0) 4, r^ BUILDINGS
KOLB CREEK
"0 CRAND R NERTI�]J'w Tma
pS
Kolb(".k h'fi'a�wueh�S mu-
5.
NC Mohlo 'P6
NzICJRd C)ih oj Alxiildd)o Do,11,o1il,i-I
NWn ho,Hd
Sdw-141-im
tilt.
d
bho 6
MAI,c 1.1-RIT111111 Ift—D 11611�hAIN111
M h—h— f I AhA 2
lit it,im,11
,,k1h,p 60(M,,i pip,
SCALE 1AGOO
75 M 45 30 15 0 75 11" M
METRE 4
2 - 6
Staff Re r
InfrastructureServrresC9eplartment wwkitchenera
Alternative 6 - Reroute Entire Stream within Sub-surface Sewer along Rothsay Ave.
This option involves the diversion of all flows along the North side of Rothsay Avenue
subsurface within circular pipe or box culvert (approx.. 300m in length). A new outlet would be
required upstream of the existing pedestrian bridge. All works would be completed within City
lands. Conflict with an existing 600mm o storm pipe would require it's relocation. Conservation
Authority and Department of Fisheries and Oceans (DFO) approvals may be difficult due to the
loss of open channel.
(FUlAn channel
Ah..d mn1 KdCHL_�ER
ALTERNATIVE NO.6-
Rec, m Ilp'Ito1jrj�,j�EN H RF�SYSr FEM
Fill-In cha nnell
WITHIN SUR-SURFACE SEWER
"SDI ON ROTHSAY AVE
KO Id(REEK
GRAN 1)RIVER I 12.1811 J LA RY
1000
"00
Kolb(,.ek h1fia,0-tices Sur nwuy:
VX 1,
4
;�
7 W dg,N
'
SCALE 11W
7S 60 46 M 15 0 T5 ISO 3Z5
METRE S I
Feasibility Screening
The Alternatives were assessed using a two (2) phase process:
1. Feasibility Screening - used to evaluate the "pros and cons" and identify alternatives to
be carried forward
2. Detailed evaluation using twenty-three (23) criteria within the four (4) main
environmental assessment categories including Physical/Natural Environment, Social,
Economic and Technical/Engineering considerations.
The feasibility screening is used to identify alternatives that are more likely to be implementable
and only carry those through to the second phase, detailed assessment, and to eliminate
2 - 7
Staff Re r
InfrastructureServrresC9epartment wwkitchenera
alternatives that for various reasons would not be feasible to implement. The feasibility of each
alternative was reviewed in terms of:
• Ability to meet study objectives
• Technical & Physical Feasibility
• Estimated Costs
• Landowner Acceptance
• Municipal/Agency Acceptance
• Environmental Impacts
• Social Impacts
As a result of the Feasibility Screening the following alternatives were removed from the
detailed evaluation.
Alternative 3 — Increase Existing Capacity - not carried forward due to high risk
and lack of feasibility.
Alternative 6 - Reroute Entire Stream within Sub-surface Sewer along Rothsay Ave. - not
carried forward due to anticipated lack of agency support and feasibility.
The remaining alternatives were evaluated with a consistent methodology. The four evaluation
criteria (technical, economic, environmental and social) have been used to allow an alternative-
to-alternative comparison
Preferred Alternative — Kolb Creek Flooding and Erosion
To select a preferred alternative, alternatives 1, 2, 4 and 5 were evaluated using the criteria
listed in the table below.
Environmental Criteria 0 Ease of Implementation
Technical/Engineering 0 Agency and Municipality Acceptance
Considerations 0 Policy/Bylaw Requirements
• Technical Feasibility
Natural/Physical 0 Potential Aquatic Habitat Benefit
Environment ((a).water temperature, (b). fish
Considerations passage)
• Potential to reduce erosion ((a).public
lands, (b). private lands)
• Potential to Reduce Streambank & Bed
Erosion
• Potential to Reduce Flooding
• Potential to Enhance Groundwater
• Potential to Improve Terrestrial Habitat
• Integration with Existing Environment
• Integration with Existing Environment
2 - 8
J
�
Staff Re r
Social/ Cultural 0 Aesthetic/ Recreation
Considerations 0 Landowner Acceptance
0 Potential Increase in Property Value
0 Compatibility with Adjacent Land Use
0 Community Disruption
Economic Considerations 0 Construction Costs
0 Long-term Operation & Maintenance
0 Infrastructure Protection
Through the evaluation of the alternatives using these orbeha, the preferred alternative is
Alternative 2 — Overflow sewer along Rothsay Avenue
Pond 6 Retrofit— Preferred Alternative
Following the Municipal Class Environmental Assessment process, the alternative solutions
developed tD fulfill the study objectives and identified problem are evaluated using a set Df
evaluation criteria. The Pond 8 Retrofit Alternatives were assessed using a detailed evaluation
process made upDf eighteen (18) criteria within the four (4) main environmental assessment
categories including Physical/Natural Envi[Dn08nt,SDCia|, Economic and Tech niCa|/EnAin8e[inA
considerations.
Kdb ClLA
Ja 2013
2 - 9
Staff Re r
InfrastructureServrresC9epartment www.kitrhenerra
IMPLEMENTATION:
It is anticipated that the implementation of the recommended alternatives will be completed
during the 2015 construction season, subject to funding and council approval
COMMUNICATIONS:
Two Public Information Centres (PIC) were held (February 5th, 2013 and July 12th, 2013). The
public, agencies, stakeholders, interested and affected parties were provided with an
opportunity to review and comment on the study findings including preferred alternative, along
with the other alternatives considered. The direct mail-outs, along with the newspaper
advertisement advising the public and property owners of the project and the Public Information
Centre, provided a project overview, as well as contact names and information for those
interested. Furthermore there were many project meetings with Grand River Conservation
Authority (GRCA) to co-operatively select the preferred alternatives. The Preferred Alternatives
will be presented to INS committee on September 30, 2013.
FINANCIAL IMPLICATIONS:
The anticipated cost for implementing the preferred alternatives are:
Kolb Creek—Alternative 2 —Overflow sewer along Rothsay: $4,000,000 est.
Pond 6 Retrofit: $500,000