HomeMy WebLinkAboutINS-13-101 - Block Line Road Extension - Opening
REPORT TO:
Community and Infrastructure Services Committee
DATE OF MEETING:
November 18, 2013
SUBMITTED BY:
Justin Readman, Director of Transportation Services
PREPARED BY:
Justin Mishko, Traffic Technologist,
519-741-2200, extension 7153
WARD(S) INVOLVED:
Wards 3, 6
DATE OF REPORT:
October 21, 2013
REPORT NO.:
INS-13-101
SUBJECT:BLOCK LINE ROAD EXTENSION - OPENING
RECOMMENDATIONS:
That “Schedule 25 – Bicycle Lanes” of the Uniform Traffic By-law be amended as
outlined in Appendix ‘A’ of Infrastructure Services Department report INS-12-101 to
reflect the current on-street bicycle lanes on Block Line Road between Westmount
Road East and Courtland Avenue East as well as on Lennox Lewis Way from Homer
Watson Boulevard to Block Line Road; and,
That “Schedule 26 - Roundabouts” of the Uniform Traffic By-law be amended as
outlined in Appendix ‘A’ of Infrastructure Services Department report INS-12-101 to
reflect the roundabout at Block Line Road and Fallowfield Drive / Hanover Street; and,
That “Schedule 12 – Through Highways” of the Uniform Traffic By-law be amended as
outlined in Appendix ‘A’ of Infrastructure Services Department report INS-12-101 to
reflect the construction of the Block Line Road extension from Lennox Lewis Way to
Courtland Avenue East; and,
That “Schedule 24 – School Bus Loading Zones” of the Uniform Traffic By-law be
amended as outlined in Appendix ‘A’ of Infrastructure Services Department report INS-
12-101 to reflect the school bus loading zones on Lennox Lewis Way and Block Line
Road; and,
That “Schedule 1 – No Parking” of the Uniform Traffic By-law be amended as outlined
in Appendix ‘A’ of Infrastructure Services Department report INS-12-101 to reflect the
on-street parking regulations on Block Line Road from Westmount Road East to Homer
Watson Boulevard; and further,
That the Uniform Traffic By-law be amended accordingly.
2 - 1
BACKGROUND:
Block Line Road is a secondary arterial roadway serving industrial, commercial, institutional
and residential land uses from Westmount Road East to Lennox Lewis Way. As a result of the
recent reconstruction of Block Line Road from south of Strasburg Road to Homer Watson
Boulevard and the construction of the Block Line Road extension from Lennox Lewis Way to
Courtland Avenue East, the Uniform Traffic By-law will need to be reviewed.
REPORT:
As part of the reconstruction of Block Line Road from south of Strasburg Road to Homer
Watson Boulevard, on-street bicycle lanes have been removed from both sides of the travel
portion of Block Line Road and replaced with an off-road multiuse pathway.
As part of the construction of the Block Line Road extension from Lennox Lewis Way to
Courtland Avenue East, on-street bicycle lanes have been included on both sides of the travel
portion of Block Line Road. These on-street bicycle lanes tie into existing bicycle lanes which
extend to Homer Watson Boulevard as well as Lennox Lewis Way. The existing on-street
bicycle lanes on Lennox Lewis Way extend to Homer Watson Boulevard.
The intersection of Block Line Road and Fallowfield Drive / Hanover Street is currently
controlled by a roundabout and has been since construction.
As a result of the construction of the Block Line Road extension, the “Through Highways”
schedule of the Uniform Traffic By-law will require amendment to accurately reflect the new
roadway network design as Block Line Road will now terminate at Courtland Avenue East.
In addition to the parking bay on Lennox Lewis Way which currently functions as a school bus
loading zone, Grand River Transit has advised that the parking bay on Block Line Road
closest to Lennox Lewis Way will also be utilized in the same manner. The parking bay further
down Block Line Road will function identically in the near future. As a result, the “School Bus
Loading Zone” schedule of the Uniform Traffic By-law will require amendment to reflect the
current and future needs of Grand River Transit.
In reviewing Block Line Road in its entirety, it has been determined that “Schedule 1” of the
Uniform Traffic By-law does not accurately reflect the current on-street parking regulations on
Block Line Road from Westmount Road East to Homer Watson Boulevard. Currently, this
section of Block Line Road is signed as “No Parking Anytime” on both sides of the roadway.
To accurately reflect this current condition, “Schedule 1” of the Uniform Traffic By-law will
require amendment.
ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN:
This initiative falls under the Community Priority of Quality of Life. “Work with partners,
including all orders of government, to create a culture of safety in our community.”
FINANCIAL IMPLICATIONS:
The approximate cost for sign installations outside of the construction of the new Block Line
Road extension is $2000, of which $1600 will be taken from the existing sign maintenance
budget and the remainder from the transportation demand management budget. The
2 - 2
approximate cost for sign installations within the limits of the construction of the new Block
Line Road extension is $1100 and will be charged to the project.
COMMUNICATIONS:
None.
Pauline Houston, Deputy CAO
ACKNOWLEDGED BY:
Infrastructure Services Department
2 - 3
“APPENDIX A”
Proposed Changes to the Uniform Traffic By-law
Schedule 25 – Bicycle Lanes
REMOVE
HIGHWAY SIDE FROM TO
Block Line Road Both Westmount Road East Hanover Street
ADD
Block Line Road Both Westmount Road East Strasburg Road
Block Line Road Both Homer Watson Boulevard Courtland Avenue East
Lennox Lewis Way Both Block Line Road Homer Watson Boulevard
Schedule 26 – Roundabouts
ADD
LOCATION
Block Line Road at Fallowfield Drive / Hanover Street
Schedule 12 – Through Highways
REMOVE
HIGHWAY FROM TO
Block Line Road north limit of Homer Watson Boulevard north limit
ADD
Block Line Road north limit of Homer Watson Boulevard south limit of Fallowfield
Drive / Hanover Street
Block Line Road south limit of Fallowfield Drive / Courtland Avenue East
Hanover Street
Schedule 24 – School Bus Loading Zones
REMOVE
HIGHWAY SIDES FROM TO
Block Line Road west a point 18m south of a point 65m south thereof
Hanover Street
ADD
Block Line Road west a point 23m south of a point 52m south thereof
Lennox Lewis Way
2 - 4
Block Line Road west a point 139m south of a point 117m south thereof
Lennox Lewis Way
Lennox Lewis Way south a point 311m west of a point 195m east thereof
Block Line Road
Schedule 1 – No Parking
REMOVE
HIGHWAY SIDES FROM TO
Block Line Road Both Homer Watson Boulevard Courtland Avenue East
ADD
Block Line Road Both Westmount Road East Courtland Avenue East
2 - 5