Loading...
HomeMy WebLinkAboutFCS-13-189 - T13-017 - Freeport Sewage Pumping Station UpgradesStaff Report I r finance and Corporate Services Department wvwuukitchenerra REPORT TO: Committee of the Whole DATE OF MEETING: 2013 -12 -09 SUBMITTED BY: Larry Gordon, Director of Supply Services, 519 - 741 -2200 ext. 7214 PREPARED BY: Larry Gordon, Director of Supply Services, 519- 741 -2200 ext. 7214 WARD(S) INVOLVED: 2 DATE OF REPORT: 2013 -11 -25 REPORT NO.: FCS -13 -189 SUBJECT: T13 -017 — Freeport Sewage Pumping Station Upgrades RECOMMENDATION: That Tender T13 -017 — Freeport Sewage Pumping Station Upgrades, be awarded to Finnbilt General Contracting Limited, Stratford, Ontario at their corrected tendered price of $4,125,886., including provisional items and contingencies of $435,853., plus H.S.T. of $536,365.18, for a total of $4,662,251.18. BACKGROUND: The City of Kitchener is responsible for operating and maintaining the sanitary sewer networks and pumping stations within its boundaries. The Freeport Sanitary Pumping Station (FSPS) is located at 3563 King Street East, Kitchener near the Freeport Hospital Long Term Care Facility. FSPS has reached its capacity and as a result, development within the Freeport area has temporarily been put on hold. An Environmental Study Report (ESR) has been completed by AECOM and approved by council in November 2010. The ESR recommended that major upgrades to the existing pumping station and forcemain be completed. The City of Kitchener retained the services of MTE Consultants to complete the detail design and contract administration of the pumping station in 2012. The design of the pumping station has been completed and project was tendered in October 2013. The construction of FSPS in 2014 will help to ease the sanitary flows for the Freeport catchment area and provide additional capacity to accommodate new developments. While the existing rated capacity (MOE) of the FSPS is 113 I /s, the existing infrastructure limits the actual capacity of the station to less than 90 I /s. The interim design of the pumping station will provide same capacity of 113 I /s, but it has been designed to accommodate an ultimate capacity of 290 I /s. The ultimate capacity will be achieved once a new discharge forcemain is constructed. The proposed upgrades will include removing a portion of the existing equalization basin and building the new station adjacent to the remaining tank. The remaining tank will be utilized as the emergency storage tank which has sufficient capacity to provide 1 -hour Iii. - I emergency storage. Once the new station is commissioned, the existing station will be demolished and decommissioned. REPORT: Tenders were advertised publicly in the Daily Commercial News, on the City of Kitchener website and the Internet through the Ontario Public Buyers Electronic Tendering Information System. Documents were picked up by nineteen (19) interested parties, and by the closing date of Thursday November 7, 2013, eight (8) tenders had been received. The tenders were reviewed by D. Wilhelm, MTE Consultants Inc., the City's Consultant for the project and M. Memon, Design & Construction Engineer who concur with the above recommendation. The following tenders were received: HIRA Limited Finnbilt General Contracting Limited K & L Construction Limited Xterra Construction Inc. H2 Ontario Inc. Triple Crown Enterprises Ltd. Stone Town Construction Limited Reid & Deleye Contractors Ltd. St. Thomas ON Stratford ON London ON Kitchener ON New Hamburg ON Hamilton ON St. Mary's ON Courtland ON Bid Price $4,678,505.10 $4,714,242.00 4-SIft'r-11101 =M Corrected Bid Price $4,662,251.18 $4,714,140.78 $4,758,667.30 $4,784,657.30 $4,917,662.00 $4,980,975.59 $5,292,688.69 The low bid submitted by HIRA Limited was incomplete and disqualified as Statement "B" - Contingency Allowance, Statement "D" - List of Proposed Sub - Contractors and Statement "I" - Bidder's Waste Disposal Sites were missing. ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: Theme: Financial Management Strategic Direction: Ensure responsible use of public funds within a supportive policy framework. The City of Kitchener's purchasing policies and practices ensure openness, fairness and transparency in the procurement of goods and services. 1 ii. - 2 FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this tender, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time /Permitting /Material testing ", and will be itemized when they exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in -house staff will include costs for inspection during construction and contract administration. The net cost for this tender (A), is fair and reasonable for a purchase of this scope and the upset limit is within the budget allowance (B) provided within the budget. Funding for this purchase is included within the approved capital budget. The estimated surplus (E) will remain within the project to fund future work. Tender T13 -017 Freeport Pumping Station Upgrades The total budget for all phases of this project is Estimated Cost for this Phase of Work Tender T13 -017 costs, including HST less: HST rebate on tender Net Cost Being Awarded Costs Incurred to Date Projected Costs: Staff Time /Permitting /Material Testing Land Acquisition Geotechnical Total Estimated Cost for this Phase of Work Budget for this Phase of Work Development Charges Sanitary Utility $ 12,250,000.00 4,662,251.18 (463,749.38) 4,198,501.80 A 100,000.00 100,000.00 50.000.00 4,448,501.80 C 2,942,090.00 2,177,910.00 Total Budget for this Phase of Work 5,120,000.00 B Estimated Surplus /(Deficit) for this Phase of Work (B - C) 671,498.20 D Estimated Surplus /(Deficit) from previous phases (671,171.78) Total Estimated Surplus /(Deficit) 326.42 E COMMUNITY ENGAGEMENT: Potential vendors are informed of bid opportunities through the public posting of bid documents as outlined in the City's Purchasing By -Law. Vendors, local media and the general public are informed of purchasing recommendations to Council through the public reports which are included with the Council agenda the week prior to the Council meeting. ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services 1 H. -3