Loading...
HomeMy WebLinkAboutFCS-13-191 - T13-077 - Old Westmount Sanitary Sewer Trunk ReconstructionStaff Report I r finance and Corporate Services Department wvwuukitchenerra REPORT TO: Committee of the Whole DATE OF MEETING: 2013 -12 -09 SUBMITTED BY: Larry Gordon, Director of Supply Services, 519 - 741 -2200 ext. 7214 PREPARED BY: Larry Gordon, Director of Supply Services, 519- 741 -2200 ext. 7214 WARD(S) INVOLVED: 9 DATE OF REPORT: 2013 -11 -28 REPORT NO.: FCS -13 -191 SUBJECT: T13 -077 — Old Westmount Sanitary Sewer (Gage Ave. to Victoria St. S) — Sanitary Trunk Reconstruction RECOMMENDATION: That Tender T13 -077 — Old Westmount Sanitary Sewer (Gage Ave. to Victoria St. S.) — Sanitary Trunk Reconstruction, be awarded to Bre -Ex Construction, London, Ontario at their corrected tendered price of $542,007.72, including provisional items and contingencies of $97,411.44, plus H.S.T. of $70,461., for a total of $612,468.72. BACKGROUND: The work required under this contract consists of trenchless rehabilitation and open cut excavation of the existing deteriorated sanitary sewers. Subsequent to the CCTV camera inspections of the sanitary sewers and previous flow diversions, the Old Westmount trunk has been selected for replacement. REPORT: Tenders were advertised publicly in the Daily Commercial News, on the City of Kitchener website and the Internet through the Ontario Public Buyers Electronic Tendering Information System. Documents were picked up by seventeen (17) interested parties, and by the closing date of Thursday, November 21, 2013, seven (7) tenders had been received. 1. iii. — 1 The tenders were reviewed by N. Litchfield, Meritech Engineering, the City's Consultant for the project, and B. Bishop, Design & Construction Project Manager who concur with the above recommendation. The following tenders were received: Bre -Ex Construction Inc. McGillvray Trenchless Limited Network Sewer & Watermain Ltd Steed & Evans Limited Moorefield Excavating Ltd. Elgin Construction Bel -Air Excavating & Grading Ltd London ON Kitchener ON Cambridge ON St. Jacobs ON Harriston ON St. Thomas ON Cambridge ON Bid Price $ 612,492.10 $ 624,766.94 $ 701,020.71 $ 772,920.00 $ 861,411.20 $ 964,287.00 $1,846,905.34 ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: Theme: Financial Management Corrected Bid Price $ 612,468.72 $ 625,268.15 $ 700,998.07 $ 772,897,12 $ 861,392.90 Strategic Direction: Ensure responsible use of public funds within a supportive policy framework. The City of Kitchener's purchasing policies and practices ensure openness, fairness and transparency in the procurement of goods and services. 1. 111. - 2 FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this tender, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time /Permitting /Material testing ", and will be itemized when they exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in -house staff will include costs for inspection during construction and contract administration. The net cost for this tender (A), is fair and reasonable for a purchase of this scope but the upset limit exceeds the budget allowance (B) provided within the budget. Additional funding for this purchase is provided from the Sanitary Utility Capital Reserve. The amount available in this reserve is sufficient to fund this transfer. There is expected to be no surplus or deficit (E). Tender T13 -077 Old Westmount Trunk Sanitary Sewer The total budget for all phases of this project is Estimated Cost for this Phase of Work Tender T13 -077 costs, including HST less: HST rebate on tender Net Cost Being Awarded Costs Incurred to Date Projected Costs Total Estimated Cost for this Phase of Work Budget for this Phase of Work Sanitary Utility Total Budget for this Phase of Work Estimated Surplus /(Deficit) for this Phase of Work (B - C) Transfer from Sanitary Utility Capital Reserve Estimated Surplus /(Deficit) from previous phases Total Estimated Surplus /(Deficit) COMMUNITY ENGAGEMENT: $ 550,666.00 612,468.72 (60,921.64) 551,547.08 A 18,604.00 570,151.08 C 384,000.00 384,000.00 B (186,151.08) D 170,050.69 16,100.39 Potential vendors are informed of bid opportunities through the public posting of bid documents as outlined in the City's Purchasing By -Law. Vendors, local media and the general public are informed of purchasing recommendations to Council through the public reports which are included with the Council agenda the week prior to the Council meeting. ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services 1. iii. - 3