REPORT TO: Jeff Willmer, Chief Administrative Officer
DATE OF MEETING: 2013-07-18
SUBMITTED BY: Larry Gordon, Director of Supply Services, 519-741-2200
ext. 7214
PREPARED BY: Larry Gordon, Director of Supply Services, 519-741-2200
ext. 7214
WARD(S) INVOLVED: 3
DATE OF REPORT: 2013-07-12
REPORT NO.: FCS-13-119
SUBJECT: E13-048 – Schneider Creek Remediation – Reach 2 and
Reach 3 (Blockline Bridge to Manitou Drive)
RECOMMENDATION:
That Expression of Interest E13-048 – Schneider Creek Remediation – Reach 2 and Reach 3
Ecosystem Recovery Inc., Cambridge,
(Blockline Bridge to Manitou Drive), be awarded to
Ontario
at their estimated fee of $384,968., including contingencies of $34,997. plus H.S.T. of
$50,045.84, for a total of $435,013.84, based on a satisfactory contract being negotiated and an
upset fee being established.
BACKGROUND:
The City of Kitchener and Grand River Conservation Authority (GRCA) have completed an
Environmental Assessment (EA) for the remediation of Schneider Creek between Hayward
Avenue and Manitou Drive. The original EA was completed in 1995 by the GRCA but not
implemented. Due to the length of time from the completion of this study, an Addendum was
required to confirm the results and conditions used in the original study. The addendum has
been completed in accordance with the Class Environmental Assessment for Remedial Flood
and Erosion Control Projects, approved for projects of this type. The study was initiated due to
historic flooding and resulting damage to the railway line in this area. Several erosion sites
were also identified which would benefit from remedial measures. A preferred alternative was
determined for the three reaches of creek within the study limits to alleviate the flooding and
erosion concerns.
The objective of the addendum was to complete a review of the evaluation of flood and erosion
mitigation alternatives taking into consideration any changes that may have occurred to the
existing conditions over the past sixteen years. The evaluation was completed and a preferred
alternatives selected for the remediation of Schneider Creek, and was endorsed by Council
March, 2012.
REPORT:
In accordance with Chapter 170 of the Municipal Code pertaining to the Selection of
Professional Services/Consultants, a Consultant’s Review Committee was established
consisting of J. Stevenson, Engineering Construction Project Manager, D. Lupsa, Design and
Construction Project Manager, A. White, Design and Construction Project Manager, T. O’Brien,
Landscape Architect and L. Gordon, Director of Supply Services.
Expressions of interest were advertised publicly on the City of Kitchener website and on the
internet through the Ontario Public Buyers Association Electronic Tendering Information System
relative to this project. Documents were downloaded by twenty-nine (29) interested parties, and
nd
by the closing date of Wednesday May 22, 2013, six (6) responses had been received.
rd
The review committee met on Monday, June 3, 2013, to review the submissions and a shortlist
of three (3) candidates was selected for further interviews. The Committee met on Wednesday
th
June 12, 2013 to interview the shortlisted candidates. The Committee elected to award the
project to Ecosystem Recovery Inc., Cambridge, Ontario.
The Committee rated consultants on the following criteria:
Evaluation of Proposed Project Manager
Completeness of the Proposal
Qualifications/Expertise
Variety & Quality of Disciplines In House/In Consortium
Past Performance
Knowledge of the City (re: this area)
Permanent Local Office
Amount of City Work Completed in the Past
Proposed Project Team
Effect of Interview
Cost of Consultant’s Fees
Effectiveness of work plan
A listing of the responding parties follows for your reference:
A.M. Candaras Associates Inc. Woodbridge ON
AMEC Environmental & Infrastructure Burlington ON
Aquafor Beech Ltd. Guelph ON
Ecosystem Recovery Inc. Cambridge ON
McCormick Rankin Kitchener ON
WalterFedy Kitchener ON
ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN:
Theme: Financial Management
Strategic Direction: Ensure responsible use of public funds within a supportive policy
framework.
The City of Kitchener’s purchasing policies and practices ensure openness, fairness and
transparency in the procurement of goods and services.
FINANCIAL IMPLICATIONS:
In addition to the costs anticipated in this tender, the design and implementation of these types of
projects typically involves city staff and resources from across the corporation. These costs are included
in the line item "Projected Costs: Staff Time/Permitting/Material testing", and will be itemized when they
exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the
project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes
all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access
and parking requirements and any other miscellaneous costs. Projects utilizing in-house staff will include
costs for inspection during construction and contract administration.
The net cost for this expression of interest (A), is fair and reasonable for a purchase of this scope and the
upset limit is within the budget allowance (B) provided within the budget. Funding for this purchase is
included within the approved capital budget. The estimated surplus (E) will remain within the project, to
fund future work.
Expression of Interest E13-048
Schneider Creek Remediation - Reach 2 and 3
The total budget for all phases of this project is $ 14,600,000.00
Estimated Cost for this Phase of Work
Expression of Interest E13-048 costs, including HST 435,013.84
less: HST rebate on expression of interest (43,270.38)
Net Cost Being Awarded 391,743.46
A
Costs Incurred to Date
Projected Costs:
Staff time 112,158.00
Permitting/Working Easements 20,000.00
Railway Flagging Fees 25,000.00
Material testing/Geotechnical Allowance 25,000.00
Other 9,000.00
Total Estimated Cost for this Phase of Work 582,901.46
C
Budget for this Phase of Work
Storm Water Utility 560,000.00
Total Budget for this Phase of Work 560,000.00
B
Estimated Surplus/(Deficit) for this Phase of Work (B - C) (22,901.46)
D
Estimated Surplus/(Deficit) from previous phases 25,364.07
Total Estimated Surplus/(Deficit) 2,462.61
E
COMMUNITY ENGAGEMENT:
Potential vendors are informed of bid opportunities through the public posting of bid documents
as outlined in the City’s Purchasing By-Law. Vendors, local media and the general public are
informed of purchasing recommendations to Council through the public reports which are
included with the Council agenda the week prior to the Council meeting.
ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate
Services