Loading...
HomeMy WebLinkAboutFCS-14-025 - T13-068 Lydia Street and Merner Avenue Road Reconstruction REPORT TO: Committee of the Whole DATE OF MEETING: 2014-02-10 SUBMITTED BY: Larry Gordon, Director of Supply Services, 519-741-2200 ext. 7214 PREPARED BY: Larry Gordon, Director of Supply Services, 519-741-2200 ext. 7214 WARD(S) INVOLVED: 10 DATE OF REPORT: 2014-01-30 REPORT NO.: FCS-14-025 SUBJECT: T13-068 – Lydia Street (Stirling Avenue N to Cameron Street) and Merner Avenue (Cameron St N to Krug Street) Road Reconstruction RECOMMENDATION: That Tender T13-068 – Lydia Street (Stirling Avenue N to Cameron Street) and Merner Avenue Regional Sewer and Watermain Ltd., (Cameron St N to Krug Street), be awarded to Cambridge, Ontario at their tendered price of $1,124,493.30, including provisional items and contingencies of $83,914., plus H.S.T. of $146,184.13, for a total of $1,270.677.43. BACKGROUND: Engineering Services is proceeding with the reconstruction of Lydia Street (Stirling Ave. N. to Cameron St. N.) and Merner Avenue (Cameron St. N. to Krug St.). Funds for construction have been approved by Council as part of the 2014 budget. The services were originally constructed in the1920’s and are in need of replacement. The project involves the replacement of the roadway, curb and gutter, sidewalk, all underground services and surface works. The administration, design and tendering of this project has been completed by City staff, the construction administration and inspection of this project will be completed by City staff as well. REPORT: Tenders were advertised publicly in the Daily Commercial News, on the City of Kitchener website and the Internet through the Ontario Public Buyers Electronic Tendering Information System. Documents were picked up by seventeen (17) interested parties, and by the closing date of Thursday December 5, 2013, twelve (12) tenders had been received. The tenders were reviewed by S. Allen, Manager, Engineering Design and Approvals, who concurs with the above recommendation. 1.iv. - 1 The following tenders were received: Bid Price Corrected Bid Price Regional Sewer and Watermain Ltd. Cambridge ON $1,270,677.42 * J. Weber Contracting Limited Breslau ON $1,338,185.10 Terracon Underground Brantford ON $1,338,402.30 $1,338,405.25 Sousa Concrete Branchton ON $1,375,977.66 $1,375,977.67 Steed and Evans St. Jacobs ON $1,398,940.00 Sierra Construction General Contracting Woodstock ON $1,439,364.13 United Contracting (London) London ON $1,482,090.15 Bre-Ex Construction Inc. London ON $1,514,703.17 Network Sewer and Watermain Cambridge ON $1,554,274.56 Bel-Air Excavating & Grading Ltd. Cambridge ON $1,638,507.34 Amico Infrastructure (Oxford) Inc. Woodstock ON $1,669,766.47 Elgin Construction St. Thomas ON $1,754,522.09 ALIGNEMENT WITH CITY OF KITCHENER STRATEGIC PLAN: Theme: Financial Management Strategic Direction: Ensure responsible use of public funds within a supportive policy framework. The City of Kitchener’s purchasing policies and practices ensure openness, fairness and transparency in the procurement of goods and services. 1.iv. - 2 FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this tender, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time/Permitting/Material testing", and will be itemized when they exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in-house staff will include costs for inspection during construction and contract administration. The net cost for this tender (A), is fair and reasonable for a purchase of this scope but the upset limit exceeds the budget allowance (B) provided within the budget. Additional funding for this purchase will be provided from the Accelerated Infrastructure Replacement Program general account. The amount available in this account is sufficient to fund this transfer. There is expected to be no surplus or deficit (E). Tender T13-068 Lydia Street and Merner Avenue Road Reconstruction The total budget for all phases of this project is $1,316,510.00 Estimated Cost for this Phase of Work Tender T13-068 costs, including HST 1,270,677.43 less: HST rebate on tender (126,392.99) Net Cost Being Awarded 1,144,284.44 A Costs Incurred to Date Projected Costs: Staff Time/Material Testing 96,586.00 Total Estimated Cost for this Phase of Work 1,240,870.44 C Budget for this Phase of Work Sanitary Utility 438,321.00 Storm Water Utility 219,161.00 Water Utility 295,391.00 Intensification Allowance (DC) 23,094.00 Total Budget for this Phase of Work 975,967.00 B Estimated Surplus/(Deficit) for this Phase of Work (B - C) (264,903.44) D Transfer from Accelerated Infrastructure Replacement Program 34,734.11 Estimated Surplus/(Deficit) from previous phases 230,169.33 Total Estimated Surplus/(Deficit) 0.00 E 1.iv. - 3 COMMUNITY ENGAGEMENT: Potential vendors are informed of bid opportunities through the public posting of bid documents as outlined in the City’s Purchasing By-Law. Vendors, local media and the general public are informed of purchasing recommendations to Council through the public reports which are included with the Council agenda the week prior to the Council meeting. ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services 1.iv. - 4