REPORT TO: Community and Infrastructure Services Committee
DATE OF MEETING: April 7, 2014
SUBMITTED BY: Justin Readman, Director of Transportation Services
PREPARED BY: Justin Mishko, Traffic Technologist, 519-741-2200, ext. 7153
WARD(S) INVOLVED: Ward 10
DATE OF REPORT: February 26, 2014
REPORT NO.: INS-14-036
SUBJECT: GUELPH STREET - TRAFFIC CALMING REVIEW UPDATE
RECOMMENDATIONS:
That a road narrowing be installed on Guelph Street at:
• Margaret Avenue,
• Woodward Avenue,
• Crestwood Avenue,
• Floyd Street,
• St. Leger Street,
• Edwin Street,
• Arnold Street,
• Englewood Place; and,
That parking be prohibited at anytime on both sides of Guelph Street encompassing the
narrowed roadway at:
• Margaret Avenue,
• Woodward Avenue,
• Crestwood Avenue,
• Floyd Street,
• St. Leger Street,
• Edwin Street,
• Arnold Street,
• Englewood Place; and,
That parking be prohibited at anytime on the west side of Guelph Street from Margaret
Avenue to St. Leger Street; and,
That parking be prohibited at anytime on the east side of Guelph Street from St. Leger
Street to Lancaster Street West; and further,
That bicycle sharrows along with complementary cycling signage be installed on Guelph
Street from Moore Avenue to Lancaster Street West.
10 - 1
BACKGROUND:
Report INS-14-006 was submitted to the Community and Infrastructure Services Committee on
February 3, 2014 recommending traffic calming measures to be installed on Guelph Street as
part of a formal traffic calming review. As a result of this meeting, Transportation Services
staff was directed to reinvestigate pedestrian crossing activity at the respective intersections
of St. Leger Street and Edwin Street. This was in response to comments provided by a
delegate at the February 3 d meeting.
REPORT:
Transportation Services staff has reviewed the matter at hand and have determined that, while
pedestrian crossing activities appear to have remained constant at both the intersections of
Guelph Street at St. Leger Street and Guelph Street at Edwin Street, staff do not support the
installation of a raised crosswalk at Edwin Street.
Kitchener Fire has indicated their concerns with a raised crosswalk at this location due to the
negative impact on their response times, particularly with Fire Station No. 2 being located on
Guelph Street at Lancaster Street West. At this time, the school crossing guard will be
maintained at Edwin Street; and, through reconstruction and installation of the recommended
traffic calming measures, the intersection geometry will improve pedestrian and traffic safety
with the provision of a road narrowing. This will serve to improve sightline availability as well as
reduce the roadway crossing distance for pedestrians. Transportation Services staff will
continue to monitor both intersections in question to determine if any action will be required in
the future.
Transportation Services staff is recommending that the preferred design alternative be
implemented. This plan includes the following:
• One road narrowing at Guelph Street at Margaret Avenue
• Single-side road narrowings at Woodward Avenue, Crestwood Avenue, Floyd Street, St.
Leger Street, Edwin Street, Arnold Street and Englewood Place
• Bicycle sharrows and complementary cycling signage on Guelph Street from Moore
Avenue to Lancaster Street West
FINANCIAL IMPLICATIONS:
As the majority of the proposed measures involves road narrowings (curb work), this will be
worked into impending capital projects scheduled for 2016/2017 respectively. The cost to install
bicycle sharrow pavement markings along with related signage is approximately $5,000. This
cost will be taken from the cycling budget.
COMMUNICATIONS:
This project has had extensive public involvement and communication. It has included two
public information centres, two information packages and three surveys including the final
survey.
Attach.
• Road Narrowing & Parking Bay Conceptual Design
• Preferred Design Alternative
Pauline Houston, Deputy CAO
ACKNOWLEDGED BY: Infrastructure Services Department
10 - 2
Road Narrowing & Parking Bay Conceptual Design
ST'. LECER ST.
` r
FLOYD ST.
CRE'STU OOD AV.
1P OODWARD AV. ="
Vk
rr
ARNOLD ST. ENGLE'ti OOD PL.
EDWIN ST. M; u;�y
r
GUELPH STREET TRAFFIC CALMING REVIEW
(A
C � �E� TIJ�L �E� I� �ALTERNATIvE " �
10 - 3
Preferred Design Alternative
• One road narrowing at Guelph Street at Margaret Avenue
• Single-side road narrowings at Woodward Avenue, Crestwood Avenue, Floyd Street, St.
Leger Street, Edwin Street, Arnold Street and Englewood Place
• Bicycle sharrows and complementary signage on Guelph Street from Moore Avenue to
Lancaster Street West
rred I
Design iii.,r g
m-r7 ......i J'�
ROAD NARROWING
PARKIN NAtawICIOWIIiiOa w r j
PARKIN�G PERMITTED
�1
qua � r
ALL-WAY STOP
„ .
r '1
� r
w �
^y "
10 - 4