Loading...
HomeMy WebLinkAboutFCS-14-113 - E14-043 Consultant Services - Hydrologic and Hydraulic Study - Hidden Valley Creek WatershedStaff Report rTC.�r R finance and Corporate Services Department www.kitchener.ca REPORT TO: Committee of the Whole DATE OF MEETING: 2014 -06 -16 SUBMITTED BY: Larry Gordon, Director of Supply Services, 519 - 741 -2200 ext. 7214 PREPARED BY: Larry Gordon, Director of Supply Services, 519 - 741 -2200 ext. 7214 WARD(S) INVOLVED: 2,3 DATE OF REPORT: 2014 -06 -09 REPORT NO.: FCS -14 -113 SUBJECT: E14 -043 Consultant Services — Hydrologic and Hydraulic Study of the Hidden Valley Creek Watershed RECOMMENDATION: That Expression of Interest E14 -043 Consultant Services — Hydrologic and Hydraulic Study of the Hidden Valley Creek Watershed, be awarded to WalterFedy, Kitchener, Ontario at their estimated fee of $64,713., including contingencies of $5,883., plus H.S.T. of $8,412.69, for a total of $73,125.69, based on a satisfactory contract being negotiated and an upset fee being established. BACKGROUND: Hidden Valley Creek, located in the southeastern portion of the City has a drainage area of 187 hectares. This creek has experienced erosion and flooding issues over the past thirty years, ever since development began in the early 1990s. To address these issues, and in response to concerns from downstream property owners, this study has been commissioned. To complete this study The City of Kitchener is seeking professional Engineering Consulting Services involving building a hydrologic and hydraulic model to determine Stormwater peak flows and to produce floodplain mapping. The purpose of the study is to understand the root causes of existing erosion and flooding of the creek and to gain insight into the available and best options for mitigating these impacts. This study is expected to be completed by the end of 2014 unless a longer monitoring record is required for model calibration purposes. REPORT: In accordance with Chapter 170 of the Municipal Professional Services /Consultants, a Consultant's consisting of M. Wilson, Engineering Technologist Stormwater Utility, B. Sloan, Manager, Long Range Code pertaining to the Selection of Review Committee was established ( Stormwater), N. Gollan, Manager, & Policy Planning, B. Steiner, Senior 1xi. - 1 Environmental Planner, W. Cheater, Region of Waterloo, B. Brown, Grand River Conservation Authority, and L. Gordon, Director of Supply Services. Expressions of interest were advertised publicly on the City of Kitchener website and on the internet through the Ontario Public Buyers Association Electronic Tendering Information System relative to this project. Documents were downloaded by thirty -three (33) interested parties, and by the closing date of Wednesday May 14, 2014, eight (8) responses had been received. The review committee met on Monday May 26, 2014, to review the submissions. The Committee elected to award the project to WalterFedy, Kitchener, Ontario. The Committee rated consultants on the following criteria: • Qualifications /Expertise • Proposed Project Team • Completeness of the Proposal • Effectiveness of Work Plan • Cost of Consultant Fees • Knowledge of the City (re: this area) • Permanent Local Office • Amount of City Work Completed in the Past A listing of the responding parties follows for your reference: AMEC Environment & Infrastructure Burlington ON Associated Engineering Kitchener ON Aquafor Beech Ltd. Mississauga ON Conestoga- Rovers & Associates Waterloo ON Ecosystem Recovery Inc. Cambridge ON Matrix Solutions Inc. Breslau ON MMM Group Ltd. Kitchener ON WalterFedy Kitchener ON ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: Theme: Financial Management Strategic Direction: Ensure responsible use of public funds within a supportive policy framework. The City of Kitchener's purchasing policies and practices ensure openness, fairness and transparency in the procurement of goods and services. 1xi. -2 FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this expression of interest, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time /Permitting /Material testing ", and will be itemized when they exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in -house staff will include costs for inspection during construction and contract administration. The net cost for this expression of interest (A), is fair and reasonable for a purchase of this scope and the upset limit is within the budget allowance (B) provided within the budget. Funding for this purchase is included within the approved capital budget. The estimated surplus (E) will be returned to the Storm Water Management Implementation capital account upon completion of the study. Expression of Interest E14 -043 Hidden Valley Hydrologic and Hydraulic Study The total budget for all phases of this project is Estimated Cost for this Phase of Work Expression of Interest E14 -043 costs, including HST less: HST rebate on tender Net Cost Being Awarded Costs Incurred to Date Projected Costs: Staff Time /Material Testing Total Estimated Cost for this Phase of Work Budget for this Phase of Work Storm Water Utility Total Budget for this Phase of Work $ 90,000.00 73,125.69 (7,273.74) 65,851.95 A 22,273.74 88,125.69 C •1 II1 1� Estimated Surplus /(Deficit) for this Phase of Work (B - C) 1,874.31 Estimated Surplus /(Deficit) from previous phases Total Estimated Surplus /(Deficit) COMMUNITY ENGAGEMENT: X 1,874.31 E Potential vendors are informed of bid opportunities through the public posting of bid documents as outlined in the City's Purchasing By -Law. Vendors, local media and the general public are informed of purchasing recommendations to Council through the public reports which are included with the Council agenda the week prior to the Council meeting. ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services 1xi. -3