HomeMy WebLinkAboutFCS-15-010 - E14-104 Consultant Services - Cherry Street ReconstructionStaff Report rTC.�r R finance and Corporate Services Department www.kitchener.ca REPORT TO: Committee of the Whole DATE OF MEETING: 2015 -01 -26 SUBMITTED BY: Larry Gordon, Director of Supply Services, 519 - 741 -2200 ext. 7214 PREPARED BY: Larry Gordon, Director of Supply Services, 519 - 741 -2200 ext. 7214 WARD(S) INVOLVED: 9 DATE OF REPORT: 2015 -01 -09 REPORT NO.: FCS -15 -010 SUBJECT: E14 -104 — Consultant Services — Cherry Street Reconstruction (West End to Strange Street) RECOMMENDATION: That Expression of Interest E14 -104 — Consultant Services — Cherry Street Reconstruction (West End to Strange Street), be awarded to Meritech Engineering, Cambridge, Ontario at their estimated fee of $131,666.45, including contingencies of $11,969.68 plus H.S.T. of $17,116.64, for a total of $148,783.09, based on a satisfactory contract being negotiated and an upset fee being established. BACKGROUND: The Cherry Street (West End to Strange Street) reconstruction project has been initiated to address the infrastructure that currently exists. The infrastructure along this section of Cherry Street has reached the end of its useful life expectancy and requires full replacement. The project includes the reconstruction of all underground services (sanitary sewer, storm sewer and watermain) as well as sanitary and water service connections to the property line. The asphalt roadway will be reconstructed as well as sidewalks and curbs. Construction is expected to occur in 2016. REPORT: In accordance with Chapter 170 of the Municipal Code pertaining to the Selection of Professional Services /Consultants, a Consultant's Review Committee was established consisting of L. Christensen, Design and Construction Project Manager, J. Stevenson, Engineering Construction Project Manager, S. Allen, Manager Engineering Design and Approvals and L. Gordon, Director of Supply Services. Expressions of interest were advertised publicly on the City of Kitchener website and on the internet through the Ontario Public Buyers Association Electronic Tendering Information System relative to this project. Documents were downloaded by nineteen (19) interested parties, and by the closing date of Wednesday November 12, 2014, six (6) responses had been received. The review committee met on Thursday November 20, 2014, to review the submissions and a shortlist of three (3) candidates was selected for further interviews. The Committee met on Tuesday December 16, 2014 to interview the shortlisted candidates. The Committee elected to award the project to Meritech Engineering, Cambridge, Ontario. The Committee rated consultants on the following criteria: • Evaluation of the Proposed Project Manager • Completeness of the Proposal • Qualifications / Expertise • Variety & Quality of Disciplines in House / In Consortium • Past Performance • Knowledge of City (re: this area) • Amount of City Work Completed in the Past • Proposed Project Team • Effect of Interview • Cost of Consultant's Fees • Effectiveness of Work Plan A listing of the responding parties follows for your reference: AECOM Canada Ltd. Kitchener ON Associated Engineering (Ont.) Ltd. Kitchener ON IBI Group Waterloo ON Meritech Engineering Cambridge ON WalterFedy Kitchener ON WSP Canada Inc. Guelph ON ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: Theme: Financial Management Strategic Direction: Ensure responsible use of public funds within a supportive policy framework. The City of Kitchener's purchasing policies and practices ensure openness, fairness and transparency in the procurement of goods and services. I.M. - 2 FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this expression of interest, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time /Permitting /Material testing ", and will be itemized when they exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in -house staff will include costs for inspection during construction and contract administration. The net cost for this Expression of Interest (A), is fair and reasonable for a purchase of this scope but the upset limit exceeds the budget allowance (B) provided within the budget. Additional funding for this purchase will be provided from the Accelerated Infrastructure Replacement Program general account. The amount available in this account is sufficient to fund this transfer. There is expected to be no surplus or deficit (E). Expression of Interest E14 -104 Cherry St Reconstruction The total budget for all phases of this project is Estimated Cost for this Phase of Work Expression of Interest E14 -104 costs, including HST less: HST rebate on tender Net Cost Being Awarded Costs Incurred to Date Projected Costs: Staff Time /Material Testing Total Estimated Cost for this Phase of Work Budget for this Phase of Work Sanitary Utility Storm Water Utility Water Utility Intensification Allowance Total Budget for this Phase of Work Estimated Surplus /(Deficit) for this Phase of Work (B - C) Transfer from Accelerated Infrastructure Replacement Program Estimated Surplus /(Deficit) from previous phases Total Estimated Surplus /(Deficit) COMMUNITY ENGAGEMENT: 1,000,232.00 148,783.09 (14,799.30) 133,983.79 A 13, 867.26 55,767.00 203,618.05 C 72,297.00 36,148.00 48,722.00 3,065.00 160,232.00 B (43,386.05) D 43,386.05 - E INFORM - Potential vendors are informed of bid opportunities through the public posting of bid documents as outlined in the City's Purchasing By -Law. Vendors, local media and the general public are informed of purchasing recommendations to Council through the public reports which are included with the Council agenda the week prior to the Council meeting. ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services I.M. - 4