Loading...
HomeMy WebLinkAboutFCS-15-011 - E14-117 Consultant Services - Pioneer Drive Bridge RehabilitationStaff Report rTC.�r R finance and Corporate Services Department www.kitchener.ca REPORT TO: Committee of the Whole DATE OF MEETING: 2015 -01 -26 SUBMITTED BY: Larry Gordon, Director of Supply Services, 519 - 741 -2200 ext. 7214 PREPARED BY: Larry Gordon, Director of Supply Services, 519 - 741 -2200 ext. 7214 WARD(S) INVOLVED: 4 DATE OF REPORT: 2015 -01 -09 REPORT NO.: FCS -15 -011 SUBJECT: E14 -117 — Consultant Services — Pioneer Drive Bridge Rehabilitation RECOMMENDATION: That Expression of Interest E14 -117 — Consultant Services — Pioneer Drive Bridge Rehabilitation, be awarded to CIMA, Burlington, Ontario at their estimated fee of $66,693., including contingencies of $6,063., plus H.S.T. of $8,670.09, for a total of $75,363.09, based on a satisfactory contract being negotiated and an upset fee being established. BACKGROUND: The Pioneer Drive Bridge is a structure spanning Schneider Creek on Pioneer Drive, approximately 300m west of Homer Watson Boulevard. The structure was originally built in 1976. All bridges owned by the City are inspected every two years in accordance with provincial legislation. As a result of the most recent inspections, rehabilitation work has been recommended on this structure to avoid further deterioration and maintain the bridge in a safe operating condition. The recommended work includes rehabilitation of the concrete deck, conversion of the abutments to a semi - integral system, repair and /or replacement of the parapet walls and railings, repairs to the girders, sealing of cracks on the abutments and retaining walls, and embankment/slope repair. In order to complete the design and contract administration for the work, an engineering consultant is required with experience in bridge rehabilitation. The construction work is anticipated to be completed in the 2015 construction season. REPORT: In accordance with Chapter 170 of the Municipal Code pertaining to the Selection of Professional Services /Consultants, a Consultant's Review Committee was established consisting of S. Shah, Design Engineer, C. Spere, Manager Engineering Construction, L. Stecho, Supervisor of Purchasing and L. Gordon, Director of Supply Services. 1. iv. -1 Expressions of interest were requested from four (4) known parties, and by the closing date of Monday December 15, 2014, four (4) responses had been received. The review committee met on Monday December 22, 2014 to review the submissions and elected to award the project to CIMA, Burlington, Ontario. The Committee rated consultants on the following criteria: • Evaluation of Proposed Project Manager • Completeness of the Proposal • Qualifications and Expertise • Variety and Quality of Disciplines In House / In Consortium • Past Performance • Knowledge of the City (re: this area) • Amount of City Work Completed in the Past A listing of the responding parties follows for your reference: AECOM Canada Ltd. Kitchener ON CIMA Burlington ON K. Smart Associates Ltd. Kitchener ON MuirTech Inc. Kitchener ON ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: Theme: Financial Management Strategic Direction: Ensure responsible use of public funds within a supportive policy framework. The City of Kitchener's purchasing policies and practices ensure openness, fairness and transparency in the procurement of goods and services. 1. iv. -2 FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this tender, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time /Permitting /Material testing ", and will be itemized when they exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in -house staff will include costs for inspection during construction and contract administration. The net cost for this tender (A), is fair and reasonable for a purchase of this scope and the upset limit is within the budget allowance (B) provided within the budget. Funding for this purchase is included within the approved capital budget. The estimated surplus (E) will remain in the account for the construction phase. Expression of Interest E14 -117 Pioneer Drive Bridge Rehabilitation The total budget for all phases of this project is Estimated Cost for this Phase of Work Expression of Interest E14 -117 costs, including HST less: HST rebate on tender Net Cost Being Awarded Costs Incurred to Date Projected Costs: Staff Time /Material Testing Total Estimated Cost for this Phase of Work Budget for this Phase of Work Federal Gas Tax Reserve Total Budget for this Phase of Work Estimated Surplus /(Deficit) for this Phase of Work (B - C) Estimated Surplus /(Deficit) from previous phases Total Estimated Surplus /(Deficit) COMMUNITY ENGAGEMENT: $ 567,000.00 75,363.09 (7,496.29) 67,866.80 A 19,578.00 87,444.80 C 111,000.00 111,000.00 B 23,555.20 D 23,555.20 E INFORM - Potential vendors are informed of bid opportunities through the public posting of bid documents as outlined in the City's Purchasing By -Law. Vendors, local media and the general public are informed of purchasing recommendations to Council through the public reports which are included with the Council agenda the week prior to the Council meeting. ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services 1. iv. -3