Loading...
HomeMy WebLinkAboutFCS-16-025 - T16-019 Bridge Maintenance Program 2016 Contract REPORT TO: Committee of the Whole DATE OF MEETING: 2016-03-21 SUBMITTED BY: Michelle Palmer-Novakovic, Director of Supply Services 519-741-2200 ext. 7214 PREPARED BY: Laurie Stecho, Supervisor of Purchasing 519-741-2200 ext. 7214 WARD(S) INVOLVED: Wards 1, 3, 4, 6, 8, 9 DATE OF REPORT: 2016-02-11 REPORT NO.: FCS-16-025 SUBJECT: T16-019 Bridge Maintenance Program 2016 Contract ___________________________________________________________________________ RECOMMENDATION: That Tender T16-019 Bridge Maintenance Program 2016 Contract, be awarded to Engineered Concrete Limited, Kitchener, Ontario at their adjusted tendered price of $411,447., including provisional items and contingencies of $55,322.50, plus H.S.T. of $53,488.11, for a total of $464,935.11. BACKGROUND: This contract is for the maintenance work of existing bridges within the City. The work is required to keep the City’s bridges in a safe operating condition to meet provincial regulation requirements. Work to be completed is identified within the bi-annual inspection of City bridges (last carried out in 2014). The main work items include, but are not limited to, slab delamination/spall repair, concrete patching, crack sealing, chain link fence repair and realigning, sediments removal, and other miscellaneous items and associated work. The administration, design and tendering of this project has been completed by City staff, the construction administration and inspection of this project will be completed by City staff as well. No traffic disruption is anticipated for this work as two lanes of traffic will be maintained throughout the project. *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. 1.i. - 1 REPORT: Tenders were advertised publicly in the Daily Commercial News, on the City of Kitchener website and the internet through the Ontario Public Buyers Electronic Tendering Information System. Documents were picked up by eight (8) interested parties and by the closing date of Thursday February 4, 2016, four (4) tenders had been received. The tenders were reviewed by S. Allen P.Eng., Manager, Design and Approvals and by S. Shah P.Eng., Design Engineer who concur with the above recommendation. As the submitted bids were above the available budget, subsequent to tender closing, one item from the Provisional Items section has been removed from the contract price and the contingency amount has been reduced resulting in the adjusted bid price as shown below. The provisional item removed was “slope stabilization, gabion wall, rock protection control along the creek including restoring embankment on bridge ID#864”. Removal of this item does not affect the scope of work and is not changing the order of submitted bids when applied to all bids. The following tenders were received: Bid Price Adjusted Bid Price Engineered Concrete Limited Kitchener ON $498,241.86 $464,935.11 * Xterra Construction Inc. Kitchener ON $598,975.25 $547,659.63 Horseshoe Hill Construction Inc. Caledon Village ON $703,801.29 $636,566.29 Jarlian Construction Inc. Burlington ON $790,062.10 $757,292.10 ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: The recommendation of this report supports the achievement of the city’s strategic vision through the delivery of core service. FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this tender, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time/Permitting/Material testing", and will be itemized when they exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in-house staff will include costs for inspection during construction and contract administration. 1.i. - 2 The net cost for this tender (A), is fair and reasonable for a purchase of this scope but the upset limit exceeds the budget allowance (B) provided within the budget. Funding for this purchase was included within a previously approved capital budget. The estimated surplus (D) will remain in the account to be used towards the 2017 program. Tender T16-019 Bridge Maintenance Program 2016 Estimated Cost for this Phase of Work Tender T16-019 costs, including HST $464,935.11 less: HST rebate on tender (46,246.62) Net Cost Being Awarded 418,688.49 A Costs Incurred to Date Projected Costs: Staff Time/Material Testing 16,859.00 Total Estimated Cost for this Phase of Work $435,547.49 C Available Funding Current balance - Road Bridge Repairs 435,599.89 Total Budget $435,599.89 B Estimated Surplus/(Deficit) (B - C) $52.40 D COMMUNITY ENGAGEMENT: INFORM – This report has been posted to the City’s website with the agenda in advance of the council / committee meeting. PREVIOUS CONSIDERATION OF THIS MATTER: Not applicable ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services 1.i. - 3