HomeMy WebLinkAboutFCS-16-038 - T16-011 Breithaupt Street (St. Leger Street to Lancaster Street West) & Major Street Road ReconstructionStaff Report rR finance and Corporate Services Department www.kitchener.ca REPORT TO: Committee of the Whole DATE OF MEETING: 2016 -03 -21 SUBMITTED BY: Michelle Palmer- Novakovic, Director of Supply Services 519- 741 -2200 ext. 7214 PREPARED BY: Laurie Stecho, Supervisor of Purchasing 519- 741 -2200 ext. 7089 WARD(S) INVOLVED: Ward 10 DATE OF REPORT: 2016 -02 -25 REPORT NO.: FCS -16 -038 SUBJECT: T16 -011 Breithaupt Street (St. Leger Street to Lancaster Street West) and Major Street Road Reconstruction RECOMMENDATION: That Tender T16 -011 Breithaupt Street (St. Leger Street to Lancaster Street West) and Major Street Road Reconstruction, be awarded to Sierra Infrastructure Inc., Woodstock, Ontario at their tendered price of $1,638,938.05, including provisional items and contingencies of $92,794., plus H.S.T. of $213,061.95, for a total of $1,852,000. BACKGROUND: Engineering Services is proceeding with the reconstruction of Breithaupt Street and Major Street. The services were originally constructed in the 1930's and are in need of replacement. The project involves the replacement of the roadway, curb and gutter, sidewalk, all underground services and surface works. Infill sidewalk will be installed along Breithaupt Street. The administration, design and tendering of this project has been completed by the City's consultant (MTE Consultants Inc.) Construction administration and inspection of this project will be completed by MTE staff as well. Full funding for this project has been approved by Council as part of the 2016 budget process. A deficit is projected in the project likely due to the low number of bidders and the increasing demand for construction contractors in the Region. Although, this project has Council approved sidewalk infill, this tender was ineligible to be approved by the * ** This information is available in accessible formats upon request. * ** Please call 519- 741 -2345 or TTY 1- 866 - 969 -9994 for assistance. Chief Administrative Officer as there is a deficit. The project is scheduled to being April 11, 2016, weather permitting. REPORT: Tenders were advertised publicly in the Daily Commercial News, on the City of Kitchener website and the internet through the Ontario Public Buyers Electronic Tendering Information System. Documents were picked up by seven (7) interested parties and by the closing date of Thursday February 25, 2016, three (3) tenders had been received. The tenders were reviewed by J. Rosevear, MTE Consultants Inc., the City's consultant for the project and L. Christensen, Design & Construction Project Manager who concur with the above recommendation. The following tenders were received: Bid Corrected Price Bid Price Sierra Infrastructure Inc. Woodstock ON $1,852,000.00 * Regional Sewer & Watermain Ltd. Cambridge ON $2,450,796.99 $2,450,797.00 Network Sewer & Watermain Ltd. Cambridge ON $2,915,422.57 $2,915,026.25 Tender documents were checked for mathematical errors and corrected accordingly. ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: The recommendation of this report supports the achievement of the city's strategic vision through the delivery of core service. FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this tender, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time /Permitting /Material testing ", and will be itemized when they exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in -house staff will include costs for inspection during construction and contract administration. 1.H. -2 The net cost for this tender (A), is fair and reasonable for a purchase of this scope but the upset limit exceeds the budget allowance (B) provided within the budget. Additional funding for this purchase is provided by the existing surplus balance in the account. The deficit (E) will be funded from the Accelerated Infrastructure Replacement Program general account. There are sufficient funds in the account to fund the deficit. Tender T16 -011 Breithaupt and Major Streets Reconstruction The total budget for all phases of this project is $ 1,948,621.00 Estimated Cost for this Phase of Work Tender T16 -011 costs, including HST 1,852,000.00 less: HST rebate on tender (184,216.56) Net Cost Being Awarded 1,667,783.44 A Costs Incurred to Date Projected Costs: Staff Time /Material Testing 47,079.00 Total Estimated Cost for this Phase of Work $ 1,714,862.44 C Budget for this Phase of Work Sanitary Utility 725,815.00 Storm Water Utility 362,908.00 Water Utility 489,136.00 Intensification Allowance 12,155.00 Total Budget for this Phase of Work $ 1,590,014.00 B Estimated Surplus /(Deficit) for this Phase of Work (B - C) (124,848.44) D Estimated Surplus /(Deficit) from previous phases 15,123.99 Total Estimated Surplus /(Deficit) $ (109,724.45) E COMMUNITY ENGAGEMENT: INFORM — This report has been posted to the City's website with the agenda in advance of the council / committee meeting. PREVIOUS CONSIDERATION OF THIS MATTER: INS — 098 Sidewalk Infill — 2016 Projects ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services