Loading...
HomeMy WebLinkAboutFCS-16-044 - E16-009 Consultant Services - Sanitary Sewer System Model UpdateStaff Report rTC.� R finance and Corporate Services Department www.kitcheneaa REPORT TO: Committee of the Whole DATE OF MEETING: 2016 -03 -21 SUBMITTED BY: Michelle Palmer- Novakovic, Director of Supply Services 519- 741 -2200 ext. 7214 PREPARED BY: Laurie Stecho, Supervisor of Purchasing WARD(S) INVOLVED: All wards DATE OF REPORT: 2016 -03 -01 REPORT NO.: FCS -16 -044 SUBJECT: E16 -009 Consultant Services — Sanitary Sewer System Model Update RECOMMENDATION: That Expression of Interest E16 -009 Consultant Services — Sanitary Sewer System Model Update, be awarded to AECOM Canada Ltd., Markham, Ontario, at their estimated fee of $186,391.48, including contingencies of $16,944.68 plus H.S.T. of $24,230.89, for a total of $210,622.37, based on a satisfactory contract being negotiated and an upset fee being established. BACKGROUND: The City of Kitchener requires a qualified Engineering Consultant to update /calibrate the City's InfoSWMMO sanitary model. A refresh is required of the InfoSWMM model's results using updated base data that describes new or altered engineered wastewater system structures such as conduits, manholes, pumping stations added to the system, as well as corrections to the base data that have been performed since the last model was created. The updated results will include re -runs of the model under three separate scenarios: the to -date level of build -out, 50% of full zoning build -out, and 100% zoning build -out. Further, once the model is updated, calibration of the model based on flow monitoring data will be completed. This will include existing data currently held by the City, as well as new flow monitoring to be performed as part of this exercise. The model was created in 2010/2011 and now requires an upgrade so accuracy can be maintained when making development approval decisions and /or future development scenarios. With continuous growth occurring in the City, it is necessary to keep the * ** This information is available in accessible formats upon request. * ** Please call 519- 741 -2345 or TTY 1- 866 - 969 -9994 for assistance. Ix. - 1 model accurate in order to make recommendations with a reasonable level of confidence. REPORT: In accordance with Chapter 170 of the Municipal Code pertaining to the Selection of Professional Services /Consultants, a Consultant's Review Committee was established consisting of E. Riek, Project Manager, Development Engineering, G. McTaggart, Manager, Infrastructure Asset Planning, L. Cooper, Manager of Development Engineering and L. Stecho, Supervisor of Purchasing. Expressions of interest were advertised publicly on the City of Kitchener website and on the intereet through the Ontario Public Buyers Association Electronic Tendering Information System relative to this project. Documents were downloaded by twenty -two (22) interested parties and by the closing date of Wednesday January 20, 2016, six (6) responses had been received. The review committee met on Monday February 8, 2016, to review the submissions and a shortlist of three (3) candidates* was selected for further interviews. The Committee met on Monday February 29, 2016 to interview the shortlisted candidates. The Committee recommends awarding the project to AECOM Canada Ltd., Markham, Ontario. The Committee rated consultants on the following criteria: • Evaluation of Proposed Project Manager • Completeness of the Proposal • Qualifications /Expertise • Variety & Quality of Disciplines In House /In Consortium • Past Performance • Knowledge of the City (re: this area) • Amount of City Work Completed in the Past • Proposed Project Team • Effect of Interview • Cost of Consultant's Fees • Effectiveness of Work Plan A listing of the responding parties follows for your reference: AECOM Canada Ltd. Aquafor Beech Limited Civica Infrastructure Inc. GM BluePlan Engineering Stantec Consulting Ltd. XCG Consulting Limited Markham ON Guelph ON Vaughan ON Kitchener ON Kitchener ON Oakville ON Ix. -2 *Shortlisted candidates 1.v. -3 ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: The recommendation of this report supports the achievement of the city's strategic vision through the delivery of core service. FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this expression of interest, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time /Permitting /Material testing ", and will be itemized when they exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in -house staff will include costs for inspection during construction and contract administration. The net cost for this tender (A), is fair and reasonable for a purchase of this scope but the upset limit exceeds the budget allowance (B) provided within the budget. The balance in the Engineering Studies account is sufficient to fund the shortfall. The estimated surplus (E) will remain within the account to fund additional studies in 2016. Expression of Interest E16 -009 SWMM Sanitary Model Update Estimated Cost for this Phase of Work Expression of Interest E16 -009 costs, including HST less: HST rebate Net Cost Being Awarded Costs Incurred to Date Projected Costs: Staff Time /Material Testing Total Estimated Cost for this Phase of Work Budget for this Phase of Work Development Charges Total Budget for this Phase of Work Estimated Surplus /(Deficit) for this Phase of Work (B - C) Balance in account, net of encumbrances Total Estimated Surplus /(Deficit) $210,622.37 (20,950.39) 189,671.98 A 18,962.00 $208,633.98 C 172,361.00 $172,361.00 B (36,272.98) D 237,299.77 $201,026.79 E Ix. - 4 COMMUNITY ENGAGEMENT: INFORM — This report has been posted to the City's website with the agenda in advance of the council / committee meeting. PREVIOUS CONSIDERATION OF THIS MATTER: Not applicable ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services Ix. -5