HomeMy WebLinkAboutFCS-16-048 - E16-010 Consultant Services - Old Huron Road Reconstruction (Battler Rd. to Maxwell Dr.)Staff Report rTC.� R finance and Corporate Services Department www.kitcheneaa REPORT TO: Committee of the Whole DATE OF MEETING: 2016 -03 -21 SUBMITTED BY: Michelle Palmer- Novakovic, Director of Supply Services 519- 741 -2200 ext. 7214 PREPARED BY: Adam Buchholtz, Buyer, 519 - 741 -2200 ext. 7217 WARD(S) INVOLVED: Ward 4 DATE OF REPORT: 2016 -03 -04 REPORT NO.: FCS -16 -048 SUBJECT: E16 -010 Consultant Services —Old Huron Road Reconstruction (Battler Road to Maxwell Drive) RECOMMENDATION: That Expression of Interest E16 -010 Consultant Services — Old Huron Road Reconstruction (Battler Road to Maxwell Drive), be awarded to MTE Consultants Inc., Kitchener, Ontario, at their estimated fee of $257,038.10, including contingencies of $23,367.10 plus H.S.T. of $33,414.95, for a total of $290,453.05, based on a satisfactory contract being negotiated and an upset fee being established. BACKGROUND: The City of Kitchener intends to upgrade Old Huron Road to current standards and carry out complete roadway reconstruction (excluding sewers) of the street within the noted limits and a pedestrian connection along Battler Road between Old Huron Road and Huron Road. In addition, a new sidewalk is required on the north side of Old Huron Road within the project limits. As part of this project, the City also intends to restore approximately 100 metres of Strasburg Creek from the culvert on Old Huron Road downstream towards the south east. This contract is to complete the pre- design, final design, coordinate all related project needs, tendering, contract administration /inspection and resident/business services during construction of improvements to the roadway, underground services, drainage and other related infrastructure. * ** This information is available in accessible formats upon request. * ** Please call 519- 741 -2345 or TTY 1- 866 - 969 -9994 for assistance. 1.ix. - 1 REPORT: In accordance with Chapter 170 of the Municipal Code pertaining to the Selection of Professional Services /Consultants, a Consultant's Review Committee was established consisting of E. Riek, Project Manager, Development Engineering, C. Spere, Manager of Engineering Construction, N. Gollan, Manager of Stormwater Utility, L. Cooper, Manager of Development Engineering and A. Buchholtz, Buyer. Expressions of interest were advertised publicly on the City of Kitchener website and on the intereet through the Ontario Public Buyers Association Electronic Tendering Information System relative to this project. Documents were downloaded by sixteen (16) interested parties and by the closing date of Friday February 19, 2016, six (6) responses had been received. The review committee met on Thursday February 25, 2016, to review the submissions and a shortlist of three (3) candidates* was selected for further interviews. The Committee met on Friday March 4, 2016 to interview the shortlisted candidates. The Committee recommends awarding the project to MTE Consultants Inc., Kitchener, Ontario. The Committee rated consultants on the following criteria: • Evaluation of Proposed Project Manager • Completeness of the Proposal • Qualifications / Expertise • Variety & Quality of Disciplines In House / In Consortium • Past Performance • Knowledge of the City (re: this area) • Amount of City Work Completed in the Past • Proposed Project Team • Effect of Interview • Cost of Consultant's Fees • Effectiveness of Work Plan A listing of the responding parties follows for your reference: AECOM Canada Ltd. GHD Limited IBI Group Meritech Engineering MTE Consultants Inc. Parsons Inc. *Shortlisted candidates Kitchener ON Waterloo ON Waterloo ON Cambridge ON Kitchener ON Kitchener ON 1.ix.-2 ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: The recommendation of this report supports the achievement of the city's strategic vision through the delivery of core service. FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this expression of interest, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time /Permitting /Material testing ", and will be itemized when they exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in -house staff will include costs for inspection during construction and contract administration. The net cost for this tender (A), is fair and reasonable for a purchase of this scope and the upset limit is within the budget allowance (B) provided within the budget. The estimated surplus (E) will remain within the account and used towards the construction phase. Expression of Interest E16 -010 Old Huron Road (Battler to Maxwell) Estimated Cost for this Phase of Work Expression of Interest E16 -010 costs, including HST $ 290,453.05 less: HST rebate (28,891.07) Net Cost Being Awarded 261,561.98 A Costs Incurred to Date 9,655.86 Projected Costs: Staff Time /Material Testing /Permit Fees 79,749.00 Total Estimated Cost for this Phase of Work $ 350,966.84 C Budget for this Phase of Work 364,039.00 B Estimated Surplus /(Deficit) for this Phase of Work (B - C) 13,072.16 D Balance in account, net of encumbrances Total Estimated Surplus /(Deficit) $ 13,072.16 E COMMUNITY ENGAGEMENT: INFORM — This report has been posted to the City's website with the agenda in advance of the council / committee meeting. PREVIOUS CONSIDERATION OF THIS MATTER: Not applicable ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services 1.ix. -4