HomeMy WebLinkAboutFCS-16-020 - T16-001 Cherry Street (Strange Street to West End) Road Reconstruction1 Staff Report Ki* -A Finance and Corporate Services Department w�r.kitrhener ca REPORT TO: Jeff Willmer, Chief Administrative Officer DATE OF MEETING: 2016-03-30 SUBMITTED BY: Michelle Palmer-Novakovic, Director of Supply Services 519-741-2200 ext. 7214 PREPARED BY: Laurie Stecho, Supervisor of Purchasing 519-741-2200 ext. 7089 WARD(S) INVOLVED: Ward 9 DATE OF REPORT: 2016-02-04 REPORT NO.: FCS -16-020 SUBJECT: T16-001 Cherry Street (Strange Street to West End) Road Reconstruction RECOMMENDATION: That Tender T16-001 Cherry Street (Strange Street to West End) Road Reconstruction, be awarded to Network Sewer and Watermain Ltd., Cambridge, Ontario at their corrected tendered price of $1,115,773.17, including provisional items and contingencies of $65,953.44, plus H.S.T. of $145,050.51, for a total of $1,260,823.68. BACKGROUND: Engineering Services is proceeding with the reconstruction of Cherry Street (Strange Street to West End). Funds for construction have been approved by Council as part of the 2016 budget. The services were originally constructed in the 1920's and are in need of replacement. The project involves the replacement of the roadway, curb and gutter, sidewalk, all underground services and surface works. Infill sidewalk will be installed from the creek to Strange Street. The administration, design and tendering of this project has been completed by Meritech Engineering, the construction administration and inspection of this project will be completed by Meritech Engineering as well. The project is scheduled to begin June 6, 2016, weather permitting. *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. REPORT: Tenders were advertised publicly in the Daily Commercial News, on the City of Kitchener website and the internet through the Ontario Public Buyers Electronic Tendering Information System. Documents were picked up by fifteen (15) interested parties and by the closing date of Monday February 1, 2016, seven (7) tenders had been received. The tenders were reviewed by N. Litchfield, Meritech Engineering, the City's Consultant for the project and L. Christensen, Design & Construction Project Manager who concur with the above recommendation. The following tenders were received: Bid Price Adjusted Price Network Sewer & Watermain Ltd. Cambridge ON $1,258,812.45 $1,260,823.68 * Gedco Excavating Ltd. Brantford ON $1,463,588.90 Sierra Infrastructure Inc. Woodstock ON $1,496,770.35 $1,496,770.36 Steed and Evans Limited St. Jacobs ON $1,507,480.42 Wm. Petrie & Sons Contracting Oakville ON $1,666,904.84 $1,675,829.58 GRT Excavating Woodstock ON $1,787,335.59 Regional Sewer & Watermain Ltd. Cambridge ON $1,812,486.55 Tender documents were checked for mathematical errors and corrected accordingly. ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: The recommendation of this report supports the achievement of the city's strategic vision through the delivery of core service. FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this tender, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time/Permitting/Material testing", and will be itemized when they exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and'Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in-house staff will include costs for inspection during construction and contract administration. The net cost for this tender (A), is fair and reasonable for a purchase of this scope and the upset limit is within the budget allowance (B) provided within the budget. Funding for this purchase is included within the approved capital budget. The estimated surplus (E) will be returned to the Accelerated Infrastructure Replacement Program (AIRP) general account, and will be used to fund unexpected deficits in other AIRP projects. Tender T16-001 Cherry Street The total budget for all phases of this project is: $ 1,633,883.00 Estimated Cost for this Phase of Work Tender T16-001 costs, including HST 1,260,823.68 less: HST rebate on tender (125,412.85) Net Cost Being Awarded 1,135,410.83 A Costs Incurred to Date Projected Costs: Staff Time/Material Testing 42,308.00 Total Estimated Cost for this Phase of Work $ 1,177,718.83 C Budget for this Phase of Work Sanitary Utility 637,023.00 Storm Water Utility 318,511.00 Water Utility 429,298.00 Intensification Allowance 7,701.00 Total Budget for this Phase of Work $ 1,392,533.00 B Estimated Surplus/(Deficit) for this Phase of Work (B - C) 214,814.17 D Estimated Surplus/(Deficit) from previous phases 25,267.87 Total Estimated Surplus/(Deficit) $ 240,082.04 E COMMUNITY ENGAGEMENT: INFORM — This report has been posted to the City's website with the agenda in advance of the council 1 committee meeting. PREVIOUS CONSIDERATION OF THIS MATTER: INS -15-035 Sidewalk Infill Policy INS -15-085 Sidewalk Infill — 2016 Projects ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services