Loading...
HomeMy WebLinkAboutFCS-16-176 - E16-100 Consultant Services - Old Mill Road Bridge Rehabilitation REPORT TO: Committee of the Whole DATE OF MEETING: 2016-11-21 SUBMITTED BY: Michelle Palmer, Director of Supply Services 519-741-2200 ext. 7214 PREPARED BY: Laurie Stecho, Supervisor of Purchasing 519-741-2200 ext. 7089 WARD(S) INVOLVED: Ward 4 DATE OF REPORT: 2016-11-04 REPORT NO.: FCS-16-176 SUBJECT: E16-100 Consultant Services – Old Mill Road Bridge Rehabilitation ___________________________________________________________________________ RECOMMENDATION: That Expression of Interest E16-100 Consultant Services – Old Mill Road Bridge Rehabilitation, be awarded to AECOM Canada Ltd., Kitchener, Ontario, at their estimated fee of $101,290.20, including contingencies of $9,208.20, plus H.S.T. of $13,167.73, for a total of $114,457.93, based on a satisfactory contract being negotiated and an upset fee being established. BACKGROUND: The Old Mill Road Bridge is located 200 m east of Mill Park Drive on Old Mill Road, spanning over the Schneider Creek. The bridge was constructed in 1980. In past years, Ontario Structure Inspection Manual (OSIM) inspection reports recommended rehabilitation of the structure to avoid further escalated deterioration and to maintain the bridge in safe operating condition. The proposed rehabilitation work includes, but is not limited to: the rehabilitation of the bridge deck, repave asphalt wearing surfaces including approaches, converting existing abutments to semi-integral details by removing expansion joints, if it’s feasible and cost effective, repair/replacement of sidewalk, parapet walls and railing, if required as per bridge design code requirements, repair girder-ends, concrete delamination/spalls repair on diaphragms, deck soffits, exterior and faces of abutment and retaining walls, and other items as required to maintain the bridge in a safe operating condition. *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. 1. iv. - 1 Old Mill Road has mostly residential properties along it and is a two lane local road within the City. Options for construction staging to allow vehicular traffic to continue using the bridge during construction will be explored during design. It is expected that construction will begin in summer 2017. REPORT: In accordance with Chapter 170 of the Municipal Code pertaining to the Selection of Professional Services/Consultants, a Consultant’s Review Committee was established consisting of S. Shah, Design Engineer, J. Stevenson, Engineering Construction Project Manager, S. Allen, Manager of Engineering Design & Approvals and L. Stecho, Supervisor of Purchasing. Expressions of Interest were requested from three (3) consulting firms and by the closing date of Friday October 28, 2016, two (2) responses had been received. The review committee met on Friday November 4, 2016, to review the submissions. The Committee recommends awarding the project to AECOM Canada Ltd., Kitchener, Ontario. The Committee rated consultants on the following criteria: • Evaluation of Proposed Project Manager • Completeness of the Proposal • Qualifications / Expertise • Past Performance • Knowledge of the City (re: this area) • Cost of Consultant’s Fees A listing of the responding parties follows for your reference: AECOM Canada Ltd. Kitchener ON * GHD Limited Waterloo ON ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: The recommendation of this report supports the achievement of the city’s strategic vision through the delivery of core service. FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this tender, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time/Permitting/Material testing", and will be itemized when they exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the 1. iv. - 2 project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in-house staff will include costs for inspection during construction and contract administration. The net cost for this expression of interest (A), is fair and reasonable for a purchase of this scope and the upset limit is within the budget allowance (B) provided within the budget. Funding for this purchase is included within the approved capital budget. The estimated surplus (D) will remain in the account for the construction phase. Expression of Interest E16-100 Od Mill Road Bridge Rehabilitation 470,000.00 The total budget for all phases of this project is Estimated Cost for this Phase of Work 114,457.93 Expression of Interest E16-100 costs, including HST (11,385.01) less: HST rebate 103,072.92A Net Cost Being Awarded Costs Incurred to Date 16,542.00 Projected Costs: Staff Time/Material Testing $119,614.92C Total Estimated Cost for this Phase of Work Budget for this Phase of Work 120,000.00 Federal Gas Tax Reserve $120,000.00B Total Budget for this Phase of Work 385.08D Estimated Surplus for this Phase of Work (B - C) COMMUNITY ENGAGEMENT: INFORM – This report has been posted to the City’s website with the agenda in advance of the council / committee meeting. PREVIOUS CONSIDERATION OF THIS MATTER: Not applicable ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services 1. iv. - 3