HomeMy WebLinkAboutINS-17-010 - Battler Snow Storage Disposal Facility - Consultant Purchase Order Increase REPORT TO: Community and Infrastructure Services DATE OF MEETING: February 13, 2017 SUBMITTED BY: Hans N. Gross, P. Eng., Director, Engineering Services, 519-741-2200 x7410 PREPARED BY: Hans N. Gross, P. Eng., Director, Engineering Services, 519-741-2200 x7410 WARD(S) INVOLVED: All DATE OF REPORT: January 6, 2017 REPORT NO.: INS- 17-010 SUBJECT:Battler Snow Storage Disposal Facility – Consultant Purchase Order Increase ____________________________________________________________________________________ RECOMMENDATION: That an extension of the purchase order issued to MTE Consultants Inc. for Engineering Consultant Services related to the Battler Snow Storage Disposal Facility in the amount of $85,683.00 be approved. BACKGROUND: MTE Consultants Inc. was retained by the City through the consultant selection process (E16-003) in March 2016 to complete the design and provide contract administration and inspection services related to the construction of the Battler Snow Storage Disposal Facility (SSDF). The Council approved fee for MTE Consultants Inc. is $259,789.15 plus applicable taxes. REPORT: The Battler SSDF is currently approximately 96% completed. Grading and landscape work, which was interrupted by winter conditions, will be completed in the spring of 2017 followed by a 2-year maintenance period ending in January 2019. During the project, a number of additional tasks arose that were outside the defined scope of work but which needed to be undertaken in order to have a completed and functional SSDF in time for the winter season. These tasks are related primarily to the design phase and include the construction of the SSDF. The additional Out of Scope tasks include: Additional geotechnical services including drilling and sampling to better define the existing site materials and soils *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. 4 - 1 Design of the washroom/utility building Negotiations and meetings with the MOECC to clarify/agree upon the required process, permits and approvals for the project Stormwater management review/calculations, modeling and report for the relocation of the existing 1350mm diameter storm sewer by-pass pipe located under the SSDF site as required by the GRCA and MOECC Review of earth works and site grading during construction in order to make use of existing soil materials and reduce the quantity of materials requiring import/export. This task resulted in a net construction savings of $ 69,000. The additional tasks and associated costs were reviewed and negotiated with MTE Consultants Inc. ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: The recommendation of this report supports the achievement of the city’s strategic vision through the delivery of core service. FINANCIAL IMPLICATIONS: Funding for the purchase order extension will be provided from the project budget. .ğƷƷƌĻƩwƚğķ{ƓƚǞ5źƭƦƚƭğƌğƓķ{ƷƚƩğŭĻCğĭźƌźƷǤ ŷĻƷƚƷğƌĬǒķŭĻƷŅƚƩğƌƌƦŷğƭĻƭƚŅƷŷźƭƦƩƚƆĻĭƷźƭυЌͲЋЉЉͲЉЉЉ͵ЉЉ 9ƭƷźƒğƷĻķ/ƚƭƷŅƚƩƷŷźƭtƩƚƆĻĭƷ tǒƩĭŷğƭĻhƩķĻƩ9ǣƷĻƓƭźƚƓБЎͲЏБЌ͵ЉЉ hǒƷƭƷğƓķźƓŭ9ƓĭǒƒĬƩğƓĭĻƭЋЊЎͲЏБЌ͵ЌЊ /ƚƭƷƭźƓĭǒƩƩĻķƷƚ5ğƷĻЋͲБАЍͲАЎВ͵ЏВ ЌͲЊАЏͲЊЋЏ͵ЉЉ 9ƭƷźƒğƷĻķ{ǒƩƦƌǒƭΉΛ5ĻŅźĭźƷΜŅƚƩƷŷźƭtƩƚƆĻĭƷЋЌͲБАЍ͵ЉЉ COMMUNITY ENGAGEMENT: INFORM – This report has been posted to the City’s website with the agenda in advance of the council / committee meeting. CONCLUSION: Staff has reviewed and negotiated the additional Out of Scope tasks and associated fees and recommend that the existing purchase order to MTE Consultants Inc. be increased accordingly. ACKNOWLEDGED BY:Justin Readman, Executive Director, Infrastructure Services 4 - 2