Loading...
HomeMy WebLinkAboutEnv - 2017-02-16 - Item 2 - Integrated Stormwater Master Plan (ISWMP) - Final Report REPORTTO:CommunityandInfrastructureServicesCommittee DATEOFMEETING:November7,2016 SUBMITTEDBY:HansGross,P.Eng.,DirectorofEngineering 5197412200ext.7410 PREPAREDBY:NickGollan,C.E.T.,Manager,StormwaterUtility 5197412200ext.7422 WARD(S)INVOLVED:All DATEOFREPORT:October27,2016 REPORTNO.:INS16080 SUBJECT:ImplementationPlanIntegratedStormwaterManagement MasterPlan(ISWMMP) RECOMMENDATION: THATtheIntegratedStormwaterManagementMasterPlanΑImplementationPlanprepared byAquaforBeechLtd.anddatedOctober17,2016togetherwiththeimplementation scheduleandbudgetforecastassetoutinstaffreportINS16080beapproved;and, THATPolicyI1135StormwaterManagementPolicy,PolicyI1140StormwaterManagement Review/Systemand,PolicyI1145StormwaterManagementFacilitiesΑDesignPrinciplesbe repealedandreplacedwithPolicyI####StormwaterManagementdated\[2016####\];and further, THATtheClerkoftheCitybedirectedtoarrangeandnumbertheStormwaterManagement Policysoastofitwithintheschemeofthe/źƷǤ͸ƭPolicyManual. EXECUTIVE SUMMARY: FollowingthecompletionoftheIntegratedStormwaterManagementMasterPlan(ISWMMP) inMay2016andtherequired30daypublicreviewperiod,anImplementationPlanhasbeen developedwhichdirectstheallocationoffunding,theprioritizationofworksandwhich includesthenecessarysupportingpoliciesandguidelinestopermittheimplementationofthe recommendedapproachesinordertoachievetheoverallmasterplangoalsandobjectives.The primarygoaloftheISWMMPistomitigatefloodingandstreamerosionandimprove stormwaterquality. ThroughacollaborativeeffortwithmultipleCitydepartmentsandstaff,animplementation scheduleandbudgetforecasthasbeendevelopedtoguidefutureworkswithintheimmediate, *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. 2 - 1 mediumandlongtermfrom2017to2030.Theimplementationscheduleandassociated budgethavebeendistributedoverthe14yearimplementationperiodinordertomanagestaff andequipmentrequirements,buildmunicipalcapacity,alignwithothermunicipalprojectsand programsandensurethatprojectscanbeeffectivelydeliveredwithinexistingfunding forecasts.Beyondthespecifiedimplementationperiodfrom2017to2030,some$40millionin expenditureshavebeendeferredforthereplacementoftheapproximately15kmof surchargingpipeidentifiedthroughthepreliminarytrunksewermodellingaswellastoaddress pipecapacityissuesoutsidethemodelledtrunksewersystem. BycompletingandimplementingtheISWMMPthecommunitywillbenefitfromenhanced stormwatermanagementservicesfocusedontheefficientuseofresourcesandtargeting prioritizedareasinthemostneedofstormwatercontrolsacrossthecity.Theamountofrunoff comingfromthemunicipalrightofway,cityownedfacilitiesandprivatepropertywillbe reducedinordertocontributetothisgoal.Thecommunitywillbenefitfromenhancedwater qualityandfloodcontrolsbeingimplementedwherenecessaryandwithinexistingbudget forecastswithoutrateincreasesbeyondwhathasbeenprojected. BACKGROUND: TheCityofKitchenerISWMMPwascompletedinMay2016andaspresentedinreportINS16 047wasbyendorsedbyCityCouncilonMay30,2016.TheISWMMPwascompletedin accordancewiththerequirementsforMasterPlansunderSection4,Approach#2ofthe MunicipalEngineersAssociationMunicipalClassEnvironmentalAssessmentAct(October2000, asamendedin2007&2011),whichisanapprovedprocessunderthe OntarioEnvironmental AssessmentAct.TheISWMMPcompletedtherequired30daypublicreviewperiodonJuly10, 2016atwhichpointtheISWMMPwasconsideredfinal. REPORT: ThenextstepfollowingthecompletionoftheISWMMPwasthedevelopmentofan ImplementationPlanrelatingtotherecommendedapproachesforthesix(6)stormwater managementprogramelements: 1)MunicipalPollutionPrevention,OperationsandMaintenancePractices, 2)MarketBasedStrategiesforPrivateProperty(sourcecontrols), 3)StormwaterfortheCapitalRoadsProgram(conveyancecontrols), 4)StormwaterManagementFacilities, 5)WatercourseandErosionRestoration,and 6)UrbanFloodManagement&StormwaterInfrastructure. AnImplementationPlanhasbeendevelopedinorderto: Prioritizealltheworksbasedonthewatershedsinthemostneedandwherethereare opportunitiestoimproveconditionsthroughtheelementsoftherecommendedapproach, Recommendfundingallocationanddevelopanimplementationscheduleusingexisting fundingsources,and 2 2 - 2 Developsupportingpolicy. TheISWMMPImplementationPlanisaguidingdocumentwhichoutlineshowandwheneach specificprogramorprojectsoftherecommendedapproacharetobecompletedtoachievethe projectgoalsandobjectives.Throughacollaborativeeffortwithmultiplecitydepartmentsand staff,animplementationscheduleandbudgetforecasthasbeendevelopedtoguidefuture worksfrom2017to2030. IMPLEMENTATION SCHEDULE AND BUDGET FORECAST: Theimplementationscheduleandbudgetforecastconsidersthree(3)implementationperiods: 1)ImmediateTermImplementationPriorities(20172021); 2)MediumTermImplementationPriorities(20222025);and 3)LongTermImplementationPriorities(20262030). Theimplementationscheduleandbudgetforecastillustratesthespecificprogramorproject elementsoftherecommendedapproachaswellastherecommendedyearwithinwhichthe elementistobecompletedaswellastheestimatedcosts.Theimplementationscheduleand budgetcorrespondtothe10yearcorporateCapitalForecast.Figure1summarizesthe implementationscheduleandbudgetforecast. Theimplementationscheduleandassociatedcostshavebeendistributedoverthe14year implementationperiodinordertomanagestaffandequipmentrequirements,buildmunicipal capacity,alignwithothermunicipalprojectsandprogramsandensurethatprojectscanbe plementation effectivelydeliveredwithinexistingfundingforecasts.Beyondthespecifiedim periodfrom2017to2030,some$40millioninexpenditureshavebeendeferredforthe replacementoftheapproximately15kmofsurchargingpipeidentifiedthroughthepreliminary trunksewer. TheISWMMPprovidesaclearvisionoftheworkneedingtobedoneforthenext15years.In ordertoachievethegoalsoftheISWMMP,additionalstaffresourcesarerequired.These includeoneDesign&ConstructionProjectManagerandoneEngineeringTechnologist.The worktobeundertakenbythetwonewpositionsincludes: Developmentofmunicipalpollutionprevention,operations&maintenanceprograms. Createmarketbasedstrategiesandpilotprogramstoincentivizestormwatermanagement practicesonprivateproperties. Providedesignsupportfortheimplementationoflowimpactdevelopmenttechniques withinthemunicipalrightofwayprojectsintheAIRPandcreatenewdesignstandardsand specifications. Managestormwatermanagementpondrehabilitationprojects. Managewatercourserehabilitationanderosioncontrolprojects. Developtheurbanfloodmanagementstrategyandfurtherrefinethehydraulicmodellingto identifyconstraintsinstormwaterinfrastructure. 3 2 - 3 4 Pool and Sediment ($79,169) Laneways ($395,844) ($131,948) ($13,194,788) Kaufman Park Units ($98,961) LID Retrofit of 2 Removal 6 OGS 6 SWM Facilities Cameron heights Sediment ($77,616) Laneways ($388,082) ($129,361) ($5,239,107) Units ($97,020) LID Retrofit of 2 Removal 6 OGS Rosenburg Park 6 SWM Facilities Sediment ($76,095) Laneways ($380,473) ($126,824) Biehn Park ($9,638,638) Units ($95,118) LID Retrofit of 2 Removal 6 OGS 6 SWM Facilities 801,533 $10,542,148 $6,156,186 $14,125,710 Long Term Implementation Priorities Sediment ($74,602) Laneways ($373,012) ($124,337) Victoria Park ($4,911,329) Units ($93,253) LID Retrofit of 2 Removal 6 OGS 6 SWM Facilities Maintain Market Based Strategy ($75,000/year) get Subwatersheds ($100,000/ year) Project Idlewood ($91,425) ($73,140) Laneways Greenway ($365,698) ($121,899) ($304,749) 6 OGS Units ($2,133,240) ($2,133,240) Millwood Park at Old Carriage Reach - SC-2B LID Retrofit of 2 6 SWM Facilities Schneider Creek Road - Restoration Sediment Removal 225,654 $5,448,391 $5, Project ($89,632) ($71,706) LC-1A-2A Laneways ($358,528) ($119,509) ($831,878) ($298,773) 6 OGS Units ($4,230,628) onitoring Protocol to reflect Tar LID Retrofit of 2 6 SWM Facilities Country Hill Park Country Side Park Restoration Reach Sediment Removal LID Road Retrofits as part of AIRP ($70,300) ($30,000) Laneways Implement ($351,498) ($117,116) ($200,000) ($292,915) Cherry Park ($1,192,749) ($1,165,916) LID Retrofit of 2 6 SWM Facilities Implement Urban Country Side Park Project ($240,190) Recommendations Recommendations BD-1A Erosion Site BD-1A Erosion Site Flood Management (utility and sanitary) (water main) Project Sediment Removal 6 OGS Units ($87,874) ementation Priorities ogram and Stormwater Grants Sediment Removal from 1/5th of Uncontrolled Catch Basins Continue Existing SWM Infrastructure Maintenance Program Updated Water Quality (EMC) and Flow M ($68,921) ($30,000) ($40,000) Implement ($620,290) $6,768,187 $4,473,558 $6, LID Retrofit of 2 Sandrock Hydro 8 SWM Facilities on Schedule and Budget Forecast Implement Urban Project ($470,961) Project ($427,311) Project ($107,976) Recommendations Recommendations SC-4L Erosion Site Flood Management BD-1B Erosion Site SB-13A Erosion Site Sediment Removal 6 OGS Units ($86,151) Corridor ($4,076,708) LID Trail Enhancements ($50,000/year) Laneways ($114,869) Medium Term Impl Continue Stormwater Credit Pr ($31,533) ($67,570) ($30,000) ($380,080) Market Based Strategy ($575,000/year) ($1,199,969) ($1,324,897) Manitou Road Prospect Park GRT61 Project LID Retrofit of 2 Construction 61 3 SWM Facilities Stonegate Creek Implement Urban Erosion Site- ES- Project ($104,170) Recommendations Flood Management Schneider Creek @ Erosion Site- SC-4L Sediment Removal 6 OGS Units ($84,462) Laneways ($112,616) es ($30,000/ year) ($82,806) ($66,245) ($50,000) Design 61 ($289,269) ($248,057) ($179,954) 6 OGS Units ($3,252,622) Reach Project LID Retrofit of 1 Construction 62 3 SWM Facilities Implement Study Recommendations SM-2B Restoration Sediment Removal Laneway ($55,204) $4,979,157 $4,090,297 Figure 1 - ISWM-MP Implementati Drainage Basin Risk Studi VS-1A Sediment ($64,946) ($30,000) ($50,000) Design 62 ($205,662) ($225,146) ($137,209) Site Project Restoration LiDAR Data Processing, RAS Model, SWM Credit ($1,270,000) Flow Routes ($1,131,142) ($1,286,760) Trading Study Reach Project Set-Up Market Integrate HEC-SR-2B Erosion Units ($81,182) Based Strategy Construction 65 Define Overland Removal 6 OGS 7 SWM Facilities ($100,000/yr) Monitoring Protocol Target LID Integration into PARTS ($82,774) ($50,000) ($63,672) ($30,000) Subwatersheds ($100,000/year) Design 65 ($608,000) ($295,000) Processing, LiDAR Data RAS Model, Flow Routes ($1,896,300) 7 ($347,280) Outlet Sewer SWM Pond 61 Integrate HEC- City-Wide OGS Sediment Study Habitat Banking Study ($30,000) Define Overland 6 SWM Facilities MG-1E-F Project Updated Water Quality (EMC) and Flow Construction 16 & ring ($20,000/ year) 211 $3,948,026 $4,782,047 Idlewood ($68,874) ($52,092) ($828,158) ($403,000) LiDAR Data Processing, Immediate Term Implementation Priorities 8 OGS Units ($1,282,250) Outlet Sewer Continue with Refined SWM Overland Flow SWM Pond 61 Integrate HEC- Audit ($80,000) Design 16 and 7 8 SWM Facilities 111 ($1,759,837) Routes ($30,000) MG-1E-F Projects Construction 10 & Improvements and Sediment Removal RAS Model, Define Filsinger DFO Monito Trillium Pilot Project ($25,000/year) Maintenance Program 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Implementation of LID Road Standard ($250,000/year) Idlewood ($80,000) OGS Units ($633,420) ($128,112) ($175,000) ($867,000) ($1,282,250) Outlet Sewer Continue with 66 ($980,500) 65 ($705,559) Continue Existing SWM Infrastructure SWM Pond 61 8 SWM Facilities LID Integration into PARTS ($50,000/yr) Model Purchase, Design 10, 111 & Construction 21 & MG-1E-F Projects Model Update and Improvements and Staffing ($100,000) Refined SWM Audit Balzer Creek Rehab Sediment Removal 8 ANNUAL TOTALS $5,346,841 $5,299, Low Impact Development (LID) AIRP Sediment Management Program (Sediment Removal) Drainage Improvements Program Market Incentive Program SWM Infrastructure Maintenance Program SWM Infrastructure Implementation Drainage Risk Evaluation Program SWM Monitoring Program Credit Trading Study Watercourse Improvement Program SWM Facility Retrofits Program Park SWM Enhancements 2 - 4 POLICY DEVELOPMENT: TheISWMMP(May2016)reportincludingthesupportingtechnicaldocumentsincludedas AppendixAthroughNandtheImplementationPlanreplacesthefollowingexistingCouncil Policies: I1135StormwaterManagementPolicy(December10,2001) I1140StormwaterManagementReview/System(March29,1999asamendedJuly5,1999) I1145StormwaterManagementFacilitiesΑDesignPrinciples(September30,1996) One(1)newpolicy,StormwaterManagement,containingthree(3)specificcomponentshas beenpreparedaspartoftheISWMMPprocessandtheImplementationPlanincollaboration withcitystaff,theRegionofWaterloo,theGRCAandtheMinistryofEnvironmentandClimate Change(MOECC).Thethree(3)supportingcomponentsinthepolicyinclude: A.StormwaterInfiltrationintheContextofSourceProtectionPlanning (October2016) B.StormwaterVolumeCriteriaandTargets(October2016) C.StormwaterManagementFee A.StormwaterInfiltrationintheContextofSourceProtectionPlanning Thiscomponentdefineswhereandhowinfiltrationbasedstormwatermanagementcontrols, ctDevelopment(LID)controls,cansafelybeplannedand commonlyreferredtoasLowImpa constructedinthecontextoftheapprovedsourceprotectionplanningpolicyunderthe Clean WaterAct. DevelopedinconsultationwiththeRegionofWaterloostaffandtheMOECC,thiscomponent acknowledgesthattheuseofinfiltrationpracticestoreducerunoffandrestorenatural hydrologicprocessesiscrucialtomaintainingandimprovingtheCityofYźƷĭŷĻƓĻƩ͸ƭnatural watersystems,maintainingtheviabilityoflocalstormwaterinfrastructure,andcontributingto climatechangeadaptation&mitigationstrategies.Astheimplementationofinfiltration practicesbecomesmoreprevalent,theCityofKitchenerhasadutytoprotectlocal groundwaterresourcesbyimplementingalandusebasedstormwaterinfiltrationguideline whichisdevelopedbasedonasoundunderstandingofidentifiedandfuturerisks. Thiscomponentidentifieshighrisksiteactivitieswhichhavethepotentialforhighlevelsof contamination.SiteswithhighriskactivitiesaregenerallydiscouragedfromincorporatingLID techniquesthatutilizeinfiltrationasitsprimaryfunctionforriskydrainageareasandrequire theproponenttoprepareaPollutionPreventionPlanand/orRiskManagementPlansaspartof SWMReportingrequirements.Spillpreventionandmanagementareacentralfocusofsuch plans. Alsoidentifiedwithinthiscomponentaretheinfiltrationopportunitiesandconstraintsandlists ofacceptablepracticeswithinvariouslandusesrangingfromResidential,MixedUse, Commercial,IndustrialEmployment,InstitutionalandOpenSpaceandNaturalHeritage Conservationaswellaslocal,minorandmajorroadwayswithintheCityofKitchener. 5 of 18 2 - 5 B.StormwaterVolumeCriteriaandTargets Thiscomponentoutlinesthenewlyestablishedminimumstormwatervolumecriteriaand outlinestheapplicationofgeneralstormwatermanagementtargetsaspartof: Newdevelopment, Redevelopment,reurbanizationandresidentialintensification,and Linearprojects(roadways,trailsandtransitinfrastructureetc.). AllsiteswithintheCityofKitchenerwillberequiredto: Continuetocontroloffsiterunofffor floodcontrolanderosion pertheapproved watershed,subwatershed,masterdrainageplans,EnvironmentalImpactStatement(EIS), ProvincialPolicyandGuidelinesorotherareaspecificstudies.SpecialPolicyAreaswhich addressknownorfloodproneareaswillremainineffect. Continuetoachieve infiltrationtargets tomaintaintheexistingwaterbalancepercurrent approvedandfuturesubwatershedplans.Currentsubwatershedplansinclude:BlairCreek, DoonSouth,IdlewoodCreek,StrasburgandUpperStrasburgCreeks. Controlfor waterquality(pollutantloadings)inaccordancewithcurrentMOECCguidelines toͷ9ƓŷğƓĭĻķLevelЊ͸protectionasdefinedinthe2003StormwaterManagementPlanning &DesignManual. Retain aminimumof12.5mmofrunofffromtheallsurfacesontheentiresiteandenrollin theCityofKitchenerStormwaterUtilityCreditprogram.Retentioncanbeacombinationof infiltration,evapotranspirationorrainwaterreuse(alsoknownasrainwaterharvesting). Allvolumeretainedonsitewillbecountedtowardsachievingthefloodanderosioncontrol, waterqualitycontrolaswellastowardsexistinginfiltrationtargets. Inallcases,thetargetsspecifiedinthiscomponentshallbesupersededbymorestringent targetsasdevelopedbytheMOECCorthroughfutureWatershedStudies,Subwatershed Studies,MasterDrainagePlans,EnvironmentalImpactStatement(EIS)and/orotherarea specificstudiessuchasGRCAWetlandPolicy. MinimumVolumeRetentionTargetRationale Aminimumvolumeretentiontargetisthecentralalterationtohowstormwaterismanaged withintheCityofKitchener.ThiscomponentwasdevelopedtoalignwiththependingMOECC LIDStormwaterManagementGuidanceManualwhichisanticipatedofreleasein2017.The MOECCpendingdocumentwilllikelycontainminimumvolumetargetswhichwillexceedthe /źƷǤ͸ƭminimumtargetof12.5mmandisexpectedtomandatetheuseofLIDapproachesfor newdevelopment,infillandredevelopmentaswellaslinearprojects. MinimumVolumeRetentionTargetΑApplication Thiscomponenthasbuiltinflexibility,outliningtheapproachforsiteswithrestrictions (constraints)whichmaypreventthemfromachievingtheminimumvolumetargetssuchas siteswithshallowbedrock,highgroundwater,contaminatedsoils,aswellashighrisksitesand 6 of 18 2 - 6 otherlimitationspertheStormwaterInfiltrationintheContextofSourceProtectionPlanning (October2016).Insuchcases,asconfirmedbycityDevelopmentEngineeringstaff,thesites shallberequiredtoachievetheMaximumExtentPossibleorMEP.Inthisway,thecityisasking onlywhatcanbetechnicallyandreasonablyachievedgiventheidentifiedconstraints. OnsiteswheretheproponentcannotimplementtherequiredvolumecontroltotheMaximum ExtentPossibleorMEPasconfirmedbytheCityofKitchenerDevelopmentEngineeringsection, thesitewillberequiredtocontributetotheStormwaterManagementFee(formerlyCashin lieu)atthecurrentperhectarerateasdefinedbytheCityofKitchenerasamendedfromtime totime. C.StormwaterManagementFee AStormwaterManagementFee(formerlyCashinlieu)hasbeenestablishedsuchthata developmentproponentshallprovideadesignatedfinancialcontributionatthecurrentper hectarerateasdefinedbytheCityofKitchener,asamendedfromtimetotimewherethe requirementsofthe StormwaterInfiltrationintheContextofSourceProtectionPlanningand theStormwaterTargetsandVolumeCriteriaare notbefullyachieved.Thisfeewillbeapplied towardsoffsitestormwatermanagementelsewhereinthecity,inconformancewiththe endedapproachesoftheIntegratedStormwaterManagementMasterPlan(ISWM recomm MP). FundswillbecollectedbytheCityofKitchenerSWMUtilityuntilsuchtimeasasuitableproject orprogramisidentifiedforpartialorfullfunding. MONITORING PLAN: InordertoensurethegoalsandobjectivesoftheISWMMPareaccomplishedovertime,a refocusedstormwatermonitoringprogramhasalsobeenestablishedaspartofthe ImplementationPlan.Thestormwatermonitoringprogramincludespreviousmonitoring obligationsaspartofconstructionpermittingprocessessuchastherequiredmonitoringof FilsingerCreekpertheDepartmentofFisheriesandOceans(DFO)requirements. Thestormwatermonitoringprogramhastwo(2)distinctphases: 1.ContinuationofarefinedSWMAuditmonitoring(20172018)Αtoestablishbaseline monitoringresults(existingconditions)forpreviouslyestablishedhistoricalmonitoring locationsthroughouttheCity. 2.UpdatedWaterQualityandFlowMonitoring(2019ongoing)Αrefinedmonitoring locationsandprotocolstoalignwiththeimplementationapproachofprioritizingworks basedonthewatershedsinthemostneedandwherethereareopportunitiestoimprove conditions.AnAdaptiveManagementApproachwillbetakentoensureprojectsand programsaredeliveringthegreatestvaluefordollarfortheresidentsofKitchener. 7 of 18 2 - 7 ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: StrategicPriority:SustainableEnvironmentandInfrastructure Strategy:SE2StormwaterMasterPlan StrategicAction:4.2Developmeasurestomanagestormwaterandimprovewaterqualityin theĭźƷǤ͸ƭwatersheds. FINANCIAL IMPLICATIONS: Theimplementationscheduleandassociatedbudgetshavebeenprioritizedoverthe14year implementationperiodinordertobestmanagestaffandequipmentrequirements,build municipalcapacity,alignwithothermunicipalprojectsandprogramsandensurethatprojects canbeeffectivelydeliveredwithinexistingfundingforecasts.Assuch,theImplementationPlan hasbeendevelopedbasedontheexisting9.2%projectedannualstormwaterrateincreaseover thenext10yearsanddoesnotaddtothatprojectedincrease.Theimplementationschedule andbudgetforecastinFigure1addresseshowstormwaterrevenueisallocatedoutsideof othercorporatepriorities.Table1belowillustrateshowthe2017StormwaterUtilityrevenueis allocated. Table1 StormwaterUtilityBudgetProjection(000's)2017 Revenue StormwaterCharge16,000 OtherRevenue594 16,594 Expenses Administration1,772 StormSewerMaintenance2,761 StormwaterCreditProgram462 GrantstoCharities/PlacesofWorship406 TransfertoCapital(AIRP)6,349 TransfertoCapital(OtherΑper2017Budget)(3,837) Consistingof: TransfertoCapital(SWMImplementationPlan)2,572 TransfertoCapital(CorporateInitiatives,i.e.SAP)1,265 15,587 NetRevenue(Expense)1,007 8 of 18 2 - 8 TheͻƩğƓƭŅĻƩtoCapital(SWMImplementationtƌğƓΜͼissignificantlylessthanthe2017 ImplementationPlanbudgetduetothefactthatexistingbalancesandcapitalcloseoutsare beingusedtofundtheremainingbalanceintheImplementationPlan.Thenetrevenueisbeing usedtomovethestabilizationreservefundoutofadeficitpositionin2017. COMMUNITY ENGAGEMENT: AConsultationPlanwasdevelopedincooperationwithCityandREEPGreenSolutionsstaffas partoftheISWMMPprocess.BeyondthemandatoryrequirementsforPublicConsultation undertheMunicipalClassEAprocess,PublicAdvisoryCommitteemeetingswereheldwhich includedagency,stakeholdersandindustryrepresentatives.Feedbackwassolicitedand receivedaspartofthedevelopmentofthekeypolicyoftheImplementationPlan. CONSULT Stakeholder,agencyandindustryconsultationwascompletedaspartof: •PublicAdvisoryCommitteeCyberNewsletterswithresponseformscirculatedtoalllocal stakeholder,municipalities,andagencies,ProvincialandFederalMinistriesandFirst Nations. o NewsletterNo.1ΑJanuary16,2015 o NewsletterNo.2ΑJune9,2015 o NewsletterNo.3ΑOctober9,2015 o NewsletterNo.4&CommentResponsetodateΑApril1,2016 •PublicAdvisoryCommitteeWorkshopΑApril21,2015 •WaterlooRegionHomebuilderAssociation(WRHBA)ΑMarch18,2016 •RegionofWaterlooconsultation(asamemberoftheprojectteam)andviatargetedSource WaterProtectiondiscussionscontinuedfromOctober31,2014 •WorkshopwithconsultingengineeringfirmswithintheRegiononNovember1,2016 COLLABORATE TheImplementationPlanhasbeendevelopedthroughacollaborativeapproachamongvarious anddivisionsincludingbutnotlimitedto:Engineering,FacilitiesManagement, Citystaff OperationsΑRoadsandTraffic,OperationsΑEnvironmentalServices,TransportationServices, Building,PlanningandEconomicDevelopment. INFORM TheImplementationPlanreporthasbeenpostedtothe/źƷǤ͸ƭwebsitewiththeagendain advanceofthecouncil/committeemeeting. PREVIOUSCONSIDERATIONOFTHISMATTER: INS 16047StormwaterManagementMasterPlanFinalReport o CouncilapprovedtheSWMMPClassEAReportpreparedbyAquaforBeechLtd.and datedMay19,2016togetherwiththerecommendedstrategy; o StaffweredirectedtofilethereportwiththeMinistryoftheEnvironmentandClimate Changeforthe30daypublicreviewperiodasrequiredbytheEnvironmental AssessmentAct; 9 of 18 2 - 9 o StaffweredirectedtodevelopanImplementationPlan,withanoperationaland maintenancestrategy,resourcerequirements,andsupportingpoliciesandbylawsa setoutinINS16047. INS15076StormwaterManagementMasterPlanStatusUpdate o StaffprovidedaprogressupdatetoCouncilonthedevelopmentofthePlan. INS14037StormwaterPolicyReviewandProposedMasterPlan o StaffweredirectedtoproceedwiththedevelopmentofanIntegratedStormwater ManagementMasterPlantoreplaceStormwaterManagementPolicy#I1135. ACKNOWLEDGEDBY:JustinReadman,InterimExecutiveDirector,InfrastructureServices Attachments:AΑProgramandProjectDescriptions BΑPolicyI####StormwaterManagement 10 of 18 2 - 10 AttachmentAΑProgramandProjectDescriptions 11 of 18 2 - 11 Program:Withintheproposedstormwaterbudgetforecast,aprogramrequiresperpetualor longtermannualfundingtosustainanacceptablelevelofservice.Programsmayhavedefined startdatesandprojectedprogramperiods;howeveritisexpectedthattheseprogramswill continueuntilprogramcomponentsareintegratedintonewprogramsorreplacedbymore efficientstrategies. Project:Withintheproposedstormwaterbudgetforecast,aprojectrequiresashortterm capitalexpendituretypicallyforconstruction.Agoalofthestormwaterbudgetforecastisto allocatestartandcompletiondatesfortheseprojectsthattakeintoconsiderationbudget opportunitiesandconstraintsaswellaswatershedprioritization. Therearetwelve(12)programsthatwillbeimplementedasidentifiedintheISWMMP.These programsare: 1)LowImpactDevelopmentAcceleratedInfrastructureReplacementProgram(LIDAIRP): Thisprogramisbeingdevelopedfortheconveyancecontrolprojectswithinthe municipalROW.ThisprogramincludesthedevelopmentofLIDroadsstandardsandthe constructionofpilotprojectsfrom2017through2019,followedbyimplementationof conveyancecontrolsaspartoftheupdatedroadsprogramthrough2030. 2)SedimentManagementProgram(SedimentRemoval):Thisprogramisbeing implementedinordertofacilitatesedimentremovalfromSWMfacilitiesandOGSunits. ItshouldbenotedthatthesearelegislativerequirementsasnotedinMOECCissued ECAsandthesearemandatorymunicipalresponsibilitiesthatmustbeplannedforin sustainablelevelofservicemodels. 3)DrainageImprovementsProgram:ThisprogramcoverstheintegrationofLIDpractices ncements),theintegrationofLIDpracticesintothe intomunicipaltrails(LIDtrailenha /źƷǤ͸ƭPlanningAroundRapidTransitStations(PARTS)project,andtheretrofitof municipallanewayswithLIDpractices. 4)MarketIncentiveProgram:Thisprogramincludesallprojectsthatareintendedto increasetheuptakeofLIDsourcecontrolsonprivateproperty.Projectswithinthis programincludetheRAINReadyNeighbourhoodActionPlan,theproposedMarket BasedStrategy,andthecontinuedfundingofstormwatercreditsandstormwater grants. 5)StormwaterManagementInfrastructureMaintenanceProgram:Thisprogramfocuses ontheremovalofsedimentfromcatchbasinsinuncontrolledcatchmentsonaregular basis. 6)StormwaterInfrastructureImplementation:Thisprogramincludestasksassociated withenhancedurbanfloodmodelling.Thisprogramalsoincludestheprojectworks associatedwiththeSWMPond61outlet. 12 of 18 2 - 12 7)DrainageRiskEvaluationProgram:Thisprogramisbeingcreatedtostudyand implementsolutionstoprioritycatchmentareasthathavebeenflaggedforimpervious areaorcatchmentareaincreasesbeyondthedesignlimitsoftheirendofpipefacilities. 8)StormwaterManagementMonitoringProgram:ThisprogramincludesallSWM monitoringandoutlinesthetransitionfromtheexistingSWMAuditprogramtothe UpdatedWaterQuality(EMC)andFlowMonitoringProtocolforTargetSubwatersheds. TheFilsingerDFOMonitoringprojectisalsoincludedunderthisprogram. 9)CreditTradingStudy:Thisprogramisbeingestablishedtostudythebenefitsand requirementsassociatedwithimplementingaSWMcredittradingsystemwithinthe existingSWMmarketplace. 10)WatercourseImprovementProgram:Thisprogramcoversfour(4)restorationreach projectsandtwelve(12)creekimprovementprojectsthataretobecompletedbetween 2017andtheendof2026. 11)StormwaterManagementFacilityRetrofitsProgram:Thisprogramconsistsoften(10) stormwatermanagementfacilityretrofitsthataretobeundertakenfrom2017through 2022inordertoimprovewaterqualityconditionsindownstreamreceivers. 12)ParkStormwaterManagementEnhancementsProgram:Thisprogramconsistsofthe detaileddesignandconstructionoftwelve(12)newSWMfacilitiesinexistingparksand corridors.NewSWMfacilitiesincludesubsurfaceandsurfacefacilities. 13 of 18 2 - 13 AttachmentBΑPolicyI####StormwaterManagement 14 of 18 2 - 14 Policy No: Click here to enter text. POLICY Approval Date: Click here to enter a date. Policy Title: Stormwater Management Policy Type: COUNCIL Reviewed Date: Click here to enter text. Next Review Date: Click here to enter text. Category:Municipal Services Reviewed Date: Click here to enter text. Sub-Category:Utility & Service Amended: Click here to enter a date. Author: Manager, Stormwater Utility Replaces: I-1135, I-1140, I-1145 Dept/Div: Engineering Services/ Repealed:Click here to enter a date. Infrastructure Services Replaced by: Click here to enter text. Related Policies, Procedures and/or Guidelines: Please use LINKS to related documents when appropriate www.kitchener.ca/stormwatermasterplan 1. POLICY PURPOSE: Concise, easy-to-understand statement, which explains the objective or philosophy underpinning the policy. This policy serves as a decision support tool as well as a methodology for the prioritization of works outlined in the Integrated Stormwater Management Master Plan (ISWM-MP). 2. DEFINITIONS: Unusual or specialized language, acronym, jargon or unique application of words. “Stormwater” - refers to rainwater and melted snow that flows over roads, parking lots, lawn and other sites in rural and urban areas. “Stormwater Management” - refers to practices which help to minimize the impact of polluted runoff flowing into watercourses, control the rate at which, or prevent, flooding from occurring and reduces the strain that stormwater places on municipal infrastructure. “Low Impact Development” - is an innovative stormwater management approach with a basic principle that is modeled after nature: manage rainfall at the source using uniformly distributed decentralized micro-scale controls. 3. SCOPE: Statement as to whom the policy applies, as well as exceptions and the ramifications of non-compliance, if any and deemed appropriate to include. 15 of 18 2 - 15 POLICY APPLIES TO THE FOLLOWING: All Employees This policy applies to all staff involved in any form of decision making related to any form of construction on municipal and private land. This includes but is not limited to: Engineering Facilities Management Operations – Roads and Traffic Operations – Environmental Services Transportation Services Building Planning Economic Development 4. POLICY CONTENT: Policy details, including specific roles and responsibilities relating to the policy. A.Stormwater Infiltration in the Context of Source Protection Planning This component defines where and how infiltration based stormwater management controls, commonly referred to as Low Impact Development (LID) controls, can safely be planned and constructed in the context of the approved source protection planning policy under the Clean Water Act. Developed in consultation with the Region of Waterloo staff and the Ministry Of Environment and Climate Change, this component of the policy acknowledges that the use of infiltration practices to reduce runoff and restore natural hydrologic processes is crucial to maintaining and improving the City of Kitchener’s natural water systems, maintaining the viability of local stormwater infrastructure, and contributing to climate change adaptation & mitigation strategies. As the implementation of infiltration practices becomes more prevalent, the City of Kitchener has a duty to protect local groundwater resources by implementing a land use-based stormwater infiltration framework which is developed based on a sound understanding of identified and future risks. Sites with high risk activities are generally discouraged from incorporating LID techniques that utilize infiltration as its primary function for sensitive drainage areas and require the proponent to prepare a Pollution Prevention Plan and/or Risk Management Plans as part of SWM Reporting requirements. Spill prevention and management are a central focus of such plans. Also identified within the Implementation Plan are the infiltration opportunities and constraints and lists of acceptable practices within various land-uses ranging from Residential, Mixed Use, Commercial, Industrial Employment, Institutional and Open Space and Natural Heritage Conservation as well as local, minor and major roadways within the City of Kitchener. B.Stormwater Volume Criteria and Targets This component outlines the minimum stormwater volume criteria as well as outlines the application of general stormwater management targets as part of: 16 of 18 2 - 16 New development, Redevelopment, reurbanization and residential intensification, and Linear projects (roadways, trails and transit infrastructure etc.). As part of this component, all sites within the City of Kitchener are required to: Continue to control off-site runoff for flood control and erosion per the approved watershed, subwatershed, master drainage plans, Environmental Impact Statement (EIS), Provincial Policy and Guidelines or other area specific studies. Special Policy Areas which address known or flood prone areas would remain in effect. Continue to achieve infiltration targets to maintain the existing water balance per current approved and future subwatershed plans. The Development Engineering section will identify relevant subwatershed plans and policies. Control for water quality (pollutant loadings) in accordance with current MOECC guidelines to ‘Enhanced-Level 1’ protection as defined in the 2003 Stormwater Management Planning & Design Manual. Retain a minimum of 12.5mm of runoff from the all surfaces on the entire site and to enroll in the City of Kitchener Stormwater Utility Credit program. Retention can be a combination of infiltration, evapotranspiration or rain water re-use (also known as rainwater harvesting). All volume retained on-site will be counted towards achieving flood and erosion control, water quality control as well as credits toward existing infiltration targets. In all cases, the targets as specified in this component shall be superseded by more stringent targets as developed by the MOECC or through future Watershed Studies, Subwatershed Studies, Master Drainage Plans, Environmental Impact Statement (EIS) and/or other area specific studies such as GRCA Wetland Policy. C.Stormwater Management Fee A Stormwater Management Fee (formerly Cash-in-lieu) has been established such that a development proponent shall provide a designated financial contribution at the current per hectare rate as defined by the City of Kitchener, as amended from time to time where the requirements of the Stormwater Infiltration in the Context of Source Protection Planning and the Stormwater Targets and Volume Criteria are not be fully achieved. This fee will be applied towards off-site stormwater management elsewhere in the city, in conformance with the recommended approaches of the Integrated Stormwater Management Master Plan (ISWM-MP). Funds will be collected by the City of Kitchener SWM Utility until such time as a suitable project or program is identified for partial or full funding. Sites with Restrictions For all sites regardless of perceived constraints, the proponent shall be required to fully comply with the appropriate volume control targets described above. Should pre-consultation with City of Kitchener engineering staff and/or pre-design investigation by the proponent and reviewed by the City Engineer identify that volume targets are not achievable; the proponent must consider and present the merits of relocating project elements to address varying soil conditions and other 17 of 18 2 - 17 constraints. Site constraints which may result in the City permitting alternatives to the above prescribed volume targets are based on: i.Shallow bedrock, ii.High groundwater, iii.Contaminated soils (i.e. Brownfields) iv.High Risk Site Activities v.Prohibitions: Issue Contributing Areas (ICA) and or WHPAs with a vulnerability score equal to or greater than 8 vi.Restrictions: including WHPAs with a vulnerability score of 2 to 6 inclusive On sites where the proponent cannot implement the required volume control to the Maximum Extent Possible or MEP as confirmed by the City of Kitchener Development Engineering, the site is required to contribute to the Stormwater Management Fee at the current per hectare rate as amended from time to time. 5. HISTORY OF POLICY CHANGES There are two types of policy updates. 1) “Administrative Updates” are done to reflect the current corporate structure and job titling and do not need Council or CLT approval. 2) “Formal Amendments” are major changes to the intent and purpose of the policy and require Council or Corporate Leadership Team (CLT) approval. Administrative Updates The date (yyyy-mm-dd) and a short annotation on the nature of the change to reflect the current corporate structure i.e. Departmental re-organization / Titling changes / Standing Committee restructuring. Formal Amendments The date of the resolution passed by Council or CLT, for example, “2020-01-20 - As per Council/CLT resolution” Click here to enter text. 18 of 18 2 - 18 Policy No: MUN-UTI-2003 POLICY Approval Date: November 21, 2016 Policy Title: STORMWATER MANAGEMENT Next Review Date: November 2021 Policy Type: COUNCIL Reviewed Date: Click here to enter text. Category:Municipal Services Amended: Click here to enter a date. Sub-Category: Utility & Service Replaces: I-1135, I-1140, I-1145 Author: Manager, Stormwater Utility Repealed: Click here to enter a date. Dept/Div: Infrastructure Services, Replaced by: Click here to enter text. Engineering Division Related Policies, Procedures and/or Guidelines: Please use LINKS to related documents when appropriate www.kitchener.ca/stormwatermasterplan 1. POLICY PURPOSE: Concise, easy-to-understand statement, which explains the objective or philosophy underpinning the policy. This policy serves as a decision support tool as well as a methodology for the prioritization of works outlined in the Integrated Stormwater Management Master Plan (ISWM-MP). 2. DEFINITIONS: Unusual or specialized language, acronym, jargon or unique application of words. “Stormwater” - refers to rainwater and melted snow that flows over roads, parking lots, lawn and other sites in rural and urban areas. “Stormwater Management” - refers to practices which help to minimize the impact of polluted runoff flowing into watercourses, control the rate at which, or prevent, flooding from occurring and reduces the strain that stormwater places on municipal infrastructure. “Low Impact Development” - is an innovative stormwater management approach with a basic principle that is modeled after nature: manage rainfall at the source using uniformly distributed decentralized micro-scale controls. 3. SCOPE: Statement as to whom the policy applies, as well as exceptions and the ramifications of non-compliance, if any and deemed appropriate to include. 1 of 5 2 - 19 Policy No: MUN-UTI-2003 Policy Title: STORMWATER MANAGEMENT POLICY APPLIES TO THE FOLLOWING: All Employees Management Permanent Full-Time Employees Permanent Full-Time Non Union Permanent Full-Time C.U.P.E. 791 Temporary Part-Time Non-Union Student Permanent Full-Time Union Continuous Part-Time Employees Part-Time Employees Continuous Part-Time Non-Union Continuous Part-Time Union Specified Positions only: Other: Council Local Boards & Advisory Committees This policy applies to all staff involved in any form of decision making related to any form of construction on municipal and private land. This includes but is not limited to: Engineering Facilities Management Operations – Roads and Traffic Operations – Environmental Services Transportation Services Building Planning Economic Development 4. POLICY CONTENT: Policy details, including specific roles and responsibilities relating to the policy. A. Stormwater Infiltration in the Context of Source Protection Planning This component defines where and how infiltration based stormwater management controls, commonly referred to as Low Impact Development (LID) controls, can safely be planned and constructed in the context of the approved source protection planning policy under the Clean Water Act. Developed in consultation with the Region of Waterloo staff and the Ministry Of Environment and Climate Change, this component of the policy acknowledges that the use of infiltration practices to reduce runoff and restore natural hydrologic processes is crucial to maintaining and improving the City of Kitchener’s natural water systems, maintaining the viability of local stormwater infrastructure, and contributing to climate change adaptation & mitigation strategies. As the implementation of infiltration practices becomes more prevalent, the City of Kitchener has a duty to protect local groundwater resources by implementing a land use-based stormwater infiltration 2 of 5 2 - 20 Policy No: MUN-UTI-2003 Policy Title: STORMWATER MANAGEMENT framework which is developed based on a sound understanding of identified and future risks. Sites with high risk activities are generally discouraged from incorporating LID techniques that utilize infiltration as its primary function for sensitive drainage areas and require the proponent to prepare a Pollution Prevention Plan and/or Risk Management Plans as part of SWM Reporting requirements. Spill prevention and management are a central focus of such plans. Also identified within the Implementation Plan are the infiltration opportunities and constraints and lists of acceptable practices within various land-uses ranging from Residential, Mixed Use, Commercial, Industrial Employment, Institutional and Open Space and Natural Heritage Conservation as well as local, minor and major roadways within the City of Kitchener. B. Stormwater Volume Criteria and Targets This component outlines the minimum stormwater volume criteria as well as outlines the application of general stormwater management targets as part of: New development, Redevelopment, reurbanization and residential intensification, and Linear projects (roadways, trails and transit infrastructure etc.). As part of this component, all sites within the City of Kitchener are required to: Continue to control off-site runoff for flood control and erosion per the approved watershed, subwatershed, master drainage plans, Environmental Impact Statement (EIS), Provincial Policy and Guidelines or other area specific studies. Special Policy Areas which address known or flood prone areas would remain in effect. Continue to achieve infiltration targets to maintain the existing water balance per current approved and future subwatershed plans. The Development Engineering section will identify relevant subwatershed plans and policies. Control for water quality (pollutant loadings) in accordance with current MOECC guidelines to ‘Enhanced-Level 1’ protection as defined in the 2003 Stormwater Management Planning & Design Manual. Retain a minimum of 12.5mm of runoff from the all surfaces on the entire site and to enroll in the City of Kitchener Stormwater Utility Credit 3 of 5 2 - 21 Policy No: MUN-UTI-2003 Policy Title: STORMWATER MANAGEMENT program. Retention can be a combination of infiltration, evapotranspiration or rain water re-use (also known as rainwater harvesting). All volume retained on-site will be counted towards achieving flood and erosion control, water quality control as well as credits toward existing infiltration targets. In all cases, the targets as specified in this component shall be superseded by more stringent targets as developed by the MOECC or through future Watershed Studies, Subwatershed Studies, Master Drainage Plans, Environmental Impact Statement (EIS) and/or other area specific studies such as GRCA Wetland Policy. C. Stormwater Management Fee A Stormwater Management Fee (formerly Cash-in-lieu) has been established such that a development proponent shall provide a designated financial contribution at the current per hectare rate as defined by the City of Kitchener, as amended from time to time where the requirements of the Stormwater Infiltration in the Context of Source Protection Planning and the Stormwater Targets and Volume Criteria are not be fully achieved. This fee will be applied towards off-site stormwater management elsewhere in the city, in conformance with the recommended approaches of the Integrated Stormwater Management Master Plan (ISWM-MP). Funds will be collected by the City of Kitchener SWM Utility until such time as a suitable project or program is identified for partial or full funding. Sites with Restrictions For all sites regardless of perceived constraints, the proponent shall be required to fully comply with the appropriate volume control targets described above. Should pre-consultation with City of Kitchener engineering staff and/or pre-design investigation by the proponent and reviewed by the City Engineer identify that volume targets are not achievable; the proponent must consider and present the merits of relocating project elements to address varying soil conditions and other constraints. Site constraints which may result in the City permitting alternatives to the above prescribed volume targets are based on: i. Shallow bedrock; ii. High groundwater; iii. Contaminated soils (i.e. Brownfields); iv. High Risk Site Activities; v. Prohibitions: Issue Contributing Areas (ICA) and or WHPAs with a vulnerability score equal to or greater than 8; and, 4 of 5 2 - 22 Policy No: MUN-UTI-2003 Policy Title: STORMWATER MANAGEMENT vi. Restrictions: including WHPAs with a vulnerability score of 2 to 6 inclusive On sites where the proponent cannot implement the required volume control to the Maximum Extent Possible or MEP as confirmed by the City of Kitchener Development Engineering, the site is required to contribute to the Stormwater Management Fee at the current per hectare rate as amended from time to time. 5. HISTORY OF POLICY CHANGES There are two types of policy updates. 1) “Administrative Updates” are done to reflect the current corporate structure and job titling and do not need Council or CLT approval. 2) “Formal Amendments” are major changes to the intent and purpose of the policy and require Council or Corporate Leadership Team (CLT) approval. Administrative Updates The date (yyyy-mm-dd) and a short annotation on the nature of the change to reflect the current corporate structure i.e. Departmental re-organization / Titling changes / Standing Committee restructuring. Click here to enter text. Formal Amendments The date of the resolution passed by Council or CLT, for example, “2020-01-20 - As per Council/CLT resolution” 2016-11-21 - Policies I-1135, I-1140 & I-1145 were repealed and replaced with MUN-UTI-2003. See report number INS-16-080 dated October 27, 2016. 5 of 5 2 - 23