Loading...
HomeMy WebLinkAboutFCS-17-042 - T17-023 Gas Pipeline Construction REPORT TO: Committee of the Whole DATE OF MEETING: 2017-02-27 SUBMITTED BY: Michelle Palmer, Director of Supply Services 519-741-2200 ext. 7214 PREPARED BY: Steve Rudak, Buyer 519-741-2200 ext. 7213 WARD(S) INVOLVED: All DATE OF REPORT: 2017-02-17 REPORT NO.: FCS-17-042 SUBJECT: T17-023 Gas Pipeline Construction ___________________________________________________________________________ RECOMMENDATION: That Tender T17-023 Gas Pipeline Construction be awarded to NPL Canada Limited, Vaughan, Ontario, at their corrected tendered price of $6,914,087.32, including planned work of $5,675,574.72, provisional work of $53,581.36, labour contingency of $131,411.34, equipment contingency of $108,093.93, and subcontractor contingency of $150,000., plus H.S.T of $795,425.97, for a total of $6,914,087.32, for the first year of a three (3) year contract, with the option to renew for two (2) additional one (1) year periods. BACKGROUND: The Gas Pipeline Construction Contract addresses the need to replace existing piping in locations that conflict with underground infrastructure proposed by others, and to replace aging and failing existing piping. In addition, this contract addresses the need to install underground gas mains and services to service new customers, to the extent that internal resources are insufficient to meet the required workload. This work is needed to ensure City homeowners and business owners all have equal and safe access to natural gas, if they require it. It is the intention of Utilities for the Contractor to maintain the roles and responsibilities as the Constructor for the various gas pipeline installation projects for the life of this contract. *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. 1. xi. - 1 REPORT: Tenders were advertised publicly in the Daily Commercial News, on the City of Kitchener website and the internet through the Ontario Public Buyers Electronic Tendering Information System. Documents were picked up by seven (7) interested parties and by the closing date of Thursday February 2, 2017, four (4) tenders had been received. The tenders were reviewed by S. Eastman, Utilities Engineer, M. Palmer, Director of Supply Services, and S. Rudak, Buyer, who concur with the above recommendation. The following tenders were received: Bid Price Adjusted Price NPL Canada Ltd. Vaughan ON $6,946,409.36 $6,914,087.32 * Clearway Utilities Inc. Concord ON $6,872,802.86 $6,872,798.87 Aecon Utilities Toronto ON $7,671,257.72 $7,671,256.39 Powerline Plus Ltd. Scarborough ON $7,986,082.63 $8,003,925.28 Tender prices were verified for mathematical accuracy and adjusted accordingly. The price for gas pipeline construction has decreased 1.4% from the 2016 contract. The prices shown reflect the anticipated spend for year one (1), of the initial three (3) year contract. Anticipated spend in following years is dependent upon the construction schedule developed by Utilities. Annual unit price adjustments shall be automatic, based on the annual inflation figure of the Ontario Consumer Price Index from the preceding year and renewal subject to mutual agreement. The low bid received from Clearway Utilities Inc., is disqualified due to not demonstrating required experience with the majority of the scope of work related to gas pipeline installation and after meter pipeline work, steel pipe welding and plastic pipe fusing. In addition, a list of qualified, licensed natural gas fitters \[as designated under O.Reg. 215/01,s.20 (1)\] was not provided in their submission. ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: The recommendation of this report supports the achievement of the city’s strategic vision through the delivery of core service. 1. xi. - 2 The net cost for this tender (A), is fair and reasonable for a project of this scope and the upset limit is within the funding available (B) for this project. Funding for this project is included within the approved capital budget. The estimated surplus (D) will remain in the account to fund similar work conducted by the City. Yearly budgeting for this program is static; however the work performed fluctuates depending upon growth and redevelopment projects that are outside of City control. T17-023 Gas Pipelines as at February 15, 2017 Estimated Cost Tender T17-023 costs, including HST 6,914,087.32 less: HST rebate (795,425.97) Net Cost Being Awarded 6,118,661.35 A Projected Costs: (3years) Staff Time 431,000.00 Excavating 1,069,000.00 Welding 120,000.00 Total Estimated Cost for this Phase of Work $ 7,738,661.35 C Funding Available Existing Balance 3,988,798.37 Budget 2017 5,706,000.00 Total Budget for this Phase of Work $ 9,694,798.37 B Estimated Surplus for this Phase of Work (B - C) 1,956,137.02 D Estimated Surplus from previous phases - Total Estimated Surplus $ 1,956,137.02 E COMMUNITY ENGAGEMENT: INFORM – This report has been posted to the City’s website with the agenda in advance of the council / committee meeting. PREVIOUS CONSIDERATION OF THIS MATTER: Not applicable ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services. 1. xi. - 3