HomeMy WebLinkAboutFCS-17-036 - E17-019 Consultant Services - Construction Inspection for Abeerdeen Road Reconstruction REPORT TO: Committee of the Whole DATE OF MEETING: 2017-02-27 SUBMITTED BY: Michelle Palmer, Director of Supply Services 519-741-2200 ext. 7214 PREPARED BY: Adam Buchholtz, Buyer, phone 519-741-2200 ext. 7217 WARD(S) INVOLVED: Ward 8 DATE OF REPORT: 2017-02-10 REPORT NO.: FCS-17-036 SUBJECT: E17-019 Consultant Services – Construction Inspection for Aberdeen Road Reconstruction ___________________________________________________________________________ RECOMMENDATION: That Expression of Interest E17-019 Consultant Services - Construction Inspection for Aberdeen Road Reconstruction, be awarded to Meritech Engineering, Cambridge, Ontario, at their estimated fee of $51,983.58, including contingencies of $4,725.78, plus H.S.T. of $6,757.87, for a total of $58,741.45, based on a satisfactory contract being negotiated and an upset fee being established. BACKGROUND: The Aberdeen Road (Glasgow Street to Claremont Avenue) reconstruction project (approximately 170 metres) has been initiated to address the infrastructure issues that currently exist. The infrastructure along Aberdeen Road has reached the end of its useful life and requires full replacement. The project includes the reconstruction of all underground services (sanitary sewer, storm sewer and watermain) as well as sanitary and water service connections to the property line. The asphalt roadway will be reconstructed as well as sidewalks and curbs. Aberdeen Road is part of a larger project that was tendered in 2016 that included Duchess Avenue and Marina Road. The Aberdeen phase was deferred until 2017 due to project timing, which was the result of not starting the initial project phases until July 2016. *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. 1. vi. - 1 The consultant services are required to complete the construction inspection for Aberdeen. Construction is expected to be completed in 2017. The project is an in-house project that initially had city staff completing the construction inspection but due to the deferral of the Aberdeen phase City Staff are already committed to other 2017 projects. Project Management and Contract Administration will still be completed by City Staff. REPORT: In accordance with Chapter 170 of the Municipal Code pertaining to the Selection of Professional Services/Consultants, a Consultant’s Review Committee was established consisting of C. Spere, Manager Construction Engineering, J. Stevenson, Engineering Construction Project Manager, B. Garcia, Engineering Construction Project Manager, and L. Stecho, Supervisor of Purchasing. Expressions of interest were advertised publicly on the City of Kitchener website and on the internet through the Ontario Public Buyers Association Electronic Tendering Information System relative to this project. Documents were downloaded by eighteen (18) interested parties and by the closing date of Monday January 30, 2017, ten (10) responses had been received. The review committee met on Monday February 6, 2017, to review the submissions and a shortlist of three (3) candidates* was selected to provide detailed pricing information. The Committee met on Friday February 10, 2017 to review the shortlisted candidates pricing submissions. The Committee recommends awarding the project to Meritech Engineering, Cambridge, Ontario. The Committee rated consultants on the following criteria: Experience of Proposed Project Manager Experience of Construction Inspector Project Assignment Understanding Past Performance of Construction Inspector (References) Amount of City Work Completed in the Past Cost A listing of the responding parties follows for your reference: Associated Engineering Kitchener ON * CIMA Kitchener ON * Exp Services Inc. Brampton ON GHD Limited Waterloo ON GSS Engineering Consultants Ltd. Owen Sound ON KIHL Construction Management Ltd. Georgetown ON 1. vi. - 2 Meritech Engineering Cambridge ON * MTE Consultants Inc. Waterloo ON Noveen Engineering Inc. Richmond Hill ON WSP/MMM Group Limited Kitchener ON *Shortlisted candidates ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: The recommendation of this report supports the achievement of the city’s strategic vision through the delivery of core service. FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this expression of interest, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time/Permitting/Material testing", and will be itemized when they exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in-house staff will include costs for inspection during construction and contract administration. The net cost for this tender (A), is fair and reasonable for a purchase of this scope but the upset limit exceeds the budget allowance (B) provided within the budget. The deficit (E) will be funded from the Accelerated Infrastructure Replacement Program general account. There are sufficient funds in the account to fund the deficit. Expression of Interest E17-019 Aberdeen Reconstruction The total budget for all phases of this project is 1,827,575.09 Estimated Cost for this Phase of Work Expression of Interest E17-019 costs, including HST 58,741.45 less: HST rebate on Expression of Interest (5,842.95) Net Cost Being Awarded 52,898.50 A Projected Costs: Staff Time/Material Testing 11,950.00 Total Estimated Cost for this Phase of Work $64,848.50 C Budget for this Phase of Work Total Budget for this Phase of Work - B Estimated (Deficit) for this Phase of Work (B - C) (64,848.50) D Estimated (Deficit) from previous phases (19,244.72) Total Estimated (Deficit) $(84,093.22) E 1. vi. - 3 COMMUNITY ENGAGEMENT: INFORM – This report has been posted to the City’s website with the agenda in advance of the council / committee meeting. PREVIOUS CONSIDERATION OF THIS MATTER: Not applicable ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services 1. vi. - 4