Loading...
HomeMy WebLinkAboutFCS-17-123 - T17-001 Balzer Creek Stream Restoration REPORT TO:Committee of the Whole DATE OF MEETING:2017-06-26 SUBMITTED BY:Michelle Palmer, Director of Supply Services 519-741-2200 ext. 7214 P REPARED BY:Adam Buchholtz, Buyer,519-741-2200 ext. 7217 WARD(S) INVOLVED:Wards 3 & 6 DATE OF REPORT:2017-06-09 REPORT NO.:FCS-17-123 SUBJECT:T17-001 Balzer Creek Stream Restoration (Old Country Drive. to Schneider Creek) ___________________________________________________________________________ RECOMMENDATION: That Tender T17-001 Balzer Creek Stream Restoration (Old Country Dr. to Schneider Creek), be awarded to 560789 Ontario Limited o/a R & M Construction, Acton, Ontario, at their tendered price of $924,638.97, including provisional items of $5,325.,plus H.S.T. of $120,203.07, for a total of $1,044,842.04. BACKGROUND: Balzer Creek, a tributary of Schneider Creek, drains a watershed area of 259 hectares and is situated entirely within the City of Kitchener. The remaining ‘open channel’ portion of Balzer Creek (that has not been buried and piped) has a length of 1.7 km and requires reconstruction as it has experienced significant erosion over the past thirty years. A large impetus for this project was to realign a portion of Balzer Creek where it has migrated overtop of a sanitary sewer, placing the City at risk for early replacement of this infrastructure. In 2015, the City retained Ecosystem Recovery Inc. to complete the Balzer Creek Schedule ‘B’ Class Environmental Assessment (EA).The EA evaluated a variety of alternatives and presented preferred alternatives for creek restoration works and for the construction of a type 2 multi-use trail per the Multi-Use Pathways & Trails Master Plan (2012). The proposed type 2 multi-use trail will double as a maintenance access road for the sanitary sewer in the location adjacentto the rear property line of residents living on Brisbane Court and Brisbane Drive. *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. 1.iii. - 1 In 2017, the City retained Matrix Solutions Inc. to complete engineering design drawings for the preferred concepts presented in the EA. All design work has been completed andreviewed by the public at the open house held on December 14, 2016. It is worth noting that this Balzer Creek restoration project is a candidate for fish habitat banking pending approval by the Department of Fisheries and Oceans Canada. If approved, for a fish habit bank any positive enhancements and/or creation of fish habitat during this project can translate into credits that can be used on future municipal projects involving DFO.Construction is anticipated to begin inJuly 2017 and be completed byOctober 2017. REPORT: Tenderswere advertised publicly on the City of Kitchener website and the internet through the Ontario Public Buyers Electronic Tendering Information System. Documents were downloaded sixteen (16) interested parties and by the closing date of Thursday June 1, 2017,two (2) tenders had been received. The tenders were reviewed by M. Wilson, Design & Construction Project Managerand N. Gollan, Manager of Stormwater Utility,who concur with the above recommendation. The following tenders were received: Bid Price 560789 Ontario Limited o/a R&M ConstructionActonON $1,044,842.04* Seawaves Development Services Inc. HamiltonON $1,493,341.21 ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: The recommendation of this report supports the achievement of the city’s strategic vision through the delivery of core service. FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this tender, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time/Permitting/Material testing", and will be itemized when they exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in-house staff will include costs for inspection during construction and contract administration. 1.iii. - 2 The net cost for this tender (A), is fair and reasonable for a purchase of this scope and the upset limit is within the budget allowance (B) provided within the budget. Funding for this purchase is included within the approved capital budget. The estimated surplus (E) will be returned to the Watercourse Improvement general account, and will be used to fund other Watercourse Improvement projects. Tender Number T17-001 Balzer Creek Restoration -Construction The total budget for all phases of this project is 1,968,630.00 Estimated Cost for this Phase of Work Tender T17-001, including H.S.T. 1,044,842.04 less: HST rebate on tender(103,929.37) Net Cost Being Awarded940,912.67 A Costs Incurred to Date Projected Costs: Staff Time 50,000.00 Projected Costs: Contingency100,000.00 Total Estimated Cost for this Phase of Work$1,090,912.67 C Budget for this Phase of Work Storm Water Utility867,000.00 Contribution from Parks -trail work505,130.00 Total Budget for this Phase of Work$1,372,130.00 B Estimated Surplusfor this Phase of Work (B -C)281,217.33 D Balance in account, net of encumbrances(85,327.51) Total Estimated Surplus $195,889.82 E COMMUNITY ENGAGEMENT: INFORM – This report has been posted to the City’s website with the agenda in advance of the council / committee meeting. PREVIOUS CONSIDERATION OF THIS MATTER: Not applicable ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services 1.iii. - 3