Loading...
HomeMy WebLinkAboutFCS-17-124 - T17-062 Old Huron Road Reconstruction REPORT TO:Committee of the Whole DATE OF MEETING:2017-06-26 SUBMITTED BY:Michelle Palmer, Director of Supply Services 519-741-2200 ext. 7214 P REPARED BY:Adam Buchholtz, Buyer,519-741-2200 ext. 7217 WARD(S) INVOLVED:Ward 4 DATE OF REPORT:2017-06-09 REPORT NO.:FCS-17-124 SUBJECT:T17-062Old Huron Road (Battler Road to Maxwell Drive) Road Reconstruction ___________________________________________________________________________ RECOMMENDATION: That Tender T17-062 Old Huron Road (Battler Road to Maxwell Drive) Road Reconstruction, be awarded to Network Sewer and Watermain Ltd., Cambridge, Ontario, at their tenderedprice of $1,616,743.78, including provisional items and contingencies of $151,630., plus H.S.T. of $210,176.69, for a total of $1,826,920.47. BACKGROUND: Engineering Services is proceeding with the reconstruction of Old Huron Road (Battler Road to Maxwell Drive). The work includes the complete installation of new pavement, curb and gutter, new storm sewer, sidewalk, driveway ramps and boulevards as well as the replacement of the culvert crossing and restoration of Strasburg Creek approximately 100m downstream of the culvert crossing. The work also includes replacement of the watermain and sanitary sewer. The services were originally constructed in the 1980’s and are in need of replacement and the culvert requires upsizing. Although the sanitary and water are in presently good condition, to upsize the storm culvert to account for the 100 year storm event and install new storm along the street to bring the street up to a current City cross-section, a section of the sanitary and a section of the water had to be relocated. This was due to spatial separation once storm sewers are installed. The administration, design and tendering portion of this project has been completed by MTE Consultants Inc., staff. The construction administration and inspection of this *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. 1.iv. - 1 project will be completedby MTE Consultants Inc., staff as well. The project is scheduled to begin July 2017. REPORT: Tenderswere advertised publiclyon the City of Kitchener website and the internet through the Ontario Public Buyers Electronic Tendering Information System. Documents were downloaded by twenty-three (23) interested partiesand by the closing date of Tuesday June 6, 2017,three (3) tendershad been received. The tenders werereviewedby D.Roga, MTE Consultants Inc., the City’s Consultant for the projectand K. Pietrzak, Project Manager Development Engineer, who concurwith the above recommendation. The following tenders werereceived: Corrected Bid PriceBid Price Network Sewer and Watermain Ltd.Cambridge ON$1,826,920.47 * Steed and Evans Limited St. Jacobs ON$1,956,750.38$1,959,021.68 Sierra Infrastructure Inc.Woodstock ON$2,038,453.39 Tenders werechecked for mathematical errors and correctedaccordingly. ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: The recommendation of this report supports the achievement of the city’s strategic vision through the delivery of core service. FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this tender, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time/Permitting/Material testing", and will be itemized when they exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in-house staff will include costs for inspection during construction and contract administration. The net cost for this tender (A), is fair and reasonable for a purchase of this scope and the upset limit is within the budget allowance (B) provided within the budget. Funding for this purchase is included within the approved capital budget. The estimated surplus (E) will be returned to the City Share of Subdivisions account to fund further work. 1.iv. - 2 Tender T17-062 Old Huron Rd (Battler to Maxwell) The total budget for this project is 2,114,000.00 Estimated Cost for this Phase of Work Tender T17-062 costs, including HST1,826,920.47 less: HST rebate on tender(181,721.92) Net Cost Being Awarded1,645,198.55 A Projected Costs: Staff Time/Material Testing45,685.00 Total Estimated Cost for this Phase of Work$1,690,883.55 C Budget for this Phase of Work Development Charges -City Share of Subdivisions1,638,200.00 Sanitary Utility111,800.00 Total Budget for this Phase of Work$1,750,000.00 B Estimated Surplus/(Deficit) for this Phase of Work (B -C)59,116.45 D Estimated Surplus/(Deficit) from previous phases79,611.16 Total Estimated Surplus/(Deficit)$138,727.61 E COMMUNITY ENGAGEMENT: INFORM – This report has been posted to the City’s website with the agenda in advance of the council / committee meeting. PREVIOUS CONSIDERATION OF THIS MATTER: Not applicable ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services 1.iv. - 3