Loading...
HomeMy WebLinkAboutFCS-17-129 - T17-091 & T17-053 - Pond Retrofit -Zeller Drive & SWM Facility Retrofit - SWM66 REPORT TO:Committee of the Whole DATE OF MEETING:2017-06-26 SUBMITTED BY:Michelle Palmer, Director of Supply Services 519-741-2200 ext. 7214 P REPARED BY:Adam Buchholtz, Buyer,519-741-2200 ext. 7217 WARD(S) INVOLVED:Wards 2 & 5 DATE OF REPORT:2017-06-14 REPORT NO.:FCS-17-129 SUBJECT:T17-091 Wet Pond Retrofit of SWM Facility 10 (SWMF 10) - Zeller Driveand; T17-053 SWM Facility Retrofit of SWM Facility 66 (SWMF66) ___________________________________________________________________________ RECOMMENDATION: That Tender T17-091 Wet Pond Retrofit of SWM Facility 10 (SWMF 10) - Zeller Drive, be awarded to Seawaves Development Services Inc., Hamilton, Ontario, at their tendered price of $1,278,200., including provisional items and contingencies of $180,000., plus H.S.T. of $166,166., for a total of $1,444,366.00and; That Tender T17-053SWM Facility Retrofit of SWM Facility 66 (SWMF66), be awarded to 560789 Ontario Limited o/a R & M Construction, Acton, Ontario, at their tendered price of $904,719.15, including provisional items and contingencies of $186,705., plus H.S.T. of $117,613.49, for a total of $1,022,332.64. BACKGROUND: In 2016, the City completed the Integrated Stormwater Management Master Plan (ISWM – MP), which prioritized pond retrofits based on facility control type, level of quality protection, available sediment storage and required repairs. The two tenders for award begin addressing the identified priorities. *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. 1.viii. - 1 T17-053 SWM Facility Retrofit of SWM Facility 66 (SWMF66) Stormwater Management Facility (SWMF) 66 is located near Strasburg Road and Trillium Drive. The facility is part of the Huron Business Park and the Strasburg Creek Provincially Significant Wetland (PSW) Complex. SWMF 66 was identified as a high priority retrofit project (Section 6.4, ISWM – MP Implementation Plan) due to the need for major repairs on the facility’s outlet, high sediment volume andlack of water quality. T17-091 - Wet Pond Retrofit of SWM Facility 10 (SWMF 10) - Zeller Drive Stormwater Management Facility (SWMF) 10 is located near Lackner Boulevard (Regional Road 54) and Zeller Drive. It is located adjacent to the IdlewoodCreek Provincially Significant Wetland (PSW) Complex and forms part of, and drains through the North Branch of Idlewood Creek. SWMF 10 was identified as a high priority retrofit project (Section 6.4, ISWM – MP Implementation Plan) due to the need for major reconfiguration on the facility’s outlet, and insufficient storage volume to provide water quality control. REPORT: T17-091 - Wet Pond Retrofit of SWM Facility 10 (SWMF 10) - Zeller Drive Tenderswere advertised publicly on the City of Kitchener website and the internet through the Ontario Public Buyers Electronic Tendering Information System. Documents were downloaded seventeen (17) interested parties and by the closing date of Friday June 9, 2017, five (5)tenders had been received. The tenders were reviewed by C. Denich, Aquafor Beech Limited,the City’s Consultant for the projectand L. Walter, Design & Construction Project Managerwho concurswith the above recommendation. The following tenders were received: Corrected Bid Price Bid Price Seawaves Development Services Inc.Hamilton ON$1,444,366.00*- Network Sewer and Watermain Ltd.Cambridge ON$1,536,783.62$1,536,749.72 560789 Ontario Limited o/a R & M ConstructionActon ON$1,628,825.34- 2220742 Ontario Ltd o/a Bronte ConstructionMilton ON$1,646,010.55- Ground Force Environmental Inc. Kitchener ON $3,618,027.23$3,617,919.73 Tenders were checked for mathematical errors and corrected accordingly. 1.viii. - 2 T17-053 SWMF66 (near the intersection of Trillium Drive and Strasburg Road) Tenders were advertised publicly on the City of Kitchener website and the internet through the Ontario Public Buyers Electronic Tendering Information System. Documents were downloaded twenty (20) interested parties and by the closing date of Friday June 16, 2017, two(2) tenders had been received. The tenders were reviewed by C. Denich, Aquafor Beech Limited,the City’s Consultant for the projectand S. Brickman, Engineer Technologist (Stormwater)who concurwith the above recommendation. The following tenders were received:Corrected Bid Price Bid Price 560789 Ontario Limited o/a R&M Construction ActonON $1,022,332.64* - Ground Force Environmental Inc. KitchenerON $1,463,877.91 $1,463,886.61 Tenders were checked for mathematical errors and corrected accordingly. ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: The recommendation of this report supports the achievement of the city’s strategic vision through the delivery of core service. FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this tender, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time/Permitting/Material testing", and will be itemized when they exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in-house staff will include costs for inspection during construction and contract administration. The net cost of these tenders (A), are fair and reasonable and the upset limit is within the available funding (B) for the projects. The estimated surplus (D) will remain within the account to help fund future projects within the SWM Pond Retrofit Program. 1.viii. - 3 Tender T17-091Retrofit of SWM Facility 10 -Zeller Driveand; Tender T17-053Retrofit of SWM Facility 66 -Trillium Drive Estimated Cost for this Phase of Work Tender T17-091 costs, including HST1,444,366.00 Tender T17-053 costs, including HST1,022,332.64 less: HST rebate on tender(245,360.00) Net Cost Being Awarded2,221,338.64 A Costs Incurred to Date - Projected Costs: Staff Time/Permitting/Material Testing 50,000.00 Total Estimated Cost for this Phase of Work$2,271,338.64 C Budget for this Phase of Work Funding available, net of encumbrances2,275,644.00 Total Budget for this Phase of Work$2,275,644.00 B Estimated Surplusor this Phase of Work (B -C) 4,305.36 D COMMUNITY ENGAGEMENT: INFORM – This report has been posted to the City’s website with the agenda in advance of the council / committee meeting. PREVIOUS CONSIDERATION OF THIS MATTER: Not applicable ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services 1.viii. - 4