HomeMy WebLinkAboutFCS-17-156 - T17-106 Grenville Avenue -Watermain Replacement ContractStaff Report Finance and Corporate Services Department www:kirrhenerca REPORT TO: Committee of the Whole DATE OF MEETING: 2017-08-28 SUBMITTED BY: Michelle Palmer, Director of Supply Services 519-741-2200 ext. 7214 PREPARED BY: Adam Buchholtz, Buyer, 519-741-2200 ext. 7217 WARD(S) INVOLVED: Ward 9 DATE OF REPORT: 2017-08-16 REPORT NO.: FCS -17-156 SUBJECT: T17-106 Grenville Avenue (West End to Courtland Avenue) Watermain Replacement Contract RECOMMENDATION: That Tender T17-106 Grenville Ave Watermain Replacement Contract, be Cambridge, Ontario, at their tendered items and contingencies of $44,800., $477,531.22. BACKGROUND: iue (West End to Courtland Avenue) awarded to G. Melo Excavating Limited, price of $422,594., including provisional plus H.S.T. of $54,937.22, for a total of The City is proceeding with the replacement of the watermain on Grenville Avenue. The existing watermain on Grenville Avenue between Courtland Avenue and the west end is proposed to be replaced to correct a number of issues. This watermain was originally laid in the 1940s and is reaching the end of its life cycle. Its original placement at sub- standard depth has resulted in frozen services. Additionally, there are some lead services that will be replaced with plastic. As is standard practice, homeowners will be notified if they have lead services to give them an opportunity to replace the private side. The current watermain is sub -standard size (100mm). This will be replaced with a 150mm diameter watermain which will improve domestic and fire flow. Construction is anticipated to start in early September and will take approximately 6 weeks to complete. The administration, design and tendering of this project has been completed by IBI Group, who will also be providing construction administration and inspection of this project. *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. REPORT: Tenders were advertised publicly on the City of Kitchener website and the internet through the Ontario Public Buyers Electronic Tendering Information System. Documents were downloaded ten (10) interested parties and by the closing date of Friday August 11, 2017, two (2) tenders had been received. The tenders were reviewed by S. Allen, Manager of Engineering Design and Approvals, and K. Cobbe, IBI Group, the City's Consultant for the project, who concur with the above recommendation. The following tenders were received: Bid Price G. Melo Excavating Limited Cambridge ON $477,531.22* Steed and Evans Limited St. Jacobs ON $573,000.00 ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: The recommendation of this report supports the achievement of the city's strategic vision through the delivery of core service. FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this tender, the design and implementation of these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time/Permitting/Material testing", and will be itemized when they exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in-house staff will include costs for inspection during construction and contract administration. The net cost for this tender (A), is fair and reasonable for a purchase of this scope but the upset limit exceeds the budget allowance (B) provided within the budget. The deficit (E) will be funded from the water utility's Distribution System Upgrades account (the purpose of which is to fund the replacement of water services/valves/hydrants). There are sufficient funds in the account to fund the deficit. Tender T17-106 Grenville Watermain Replacement Estimated Cost for this Phase of Work Tender T17-106 less: HST rebate on tender Net Cost Being Awarded Projected Costs: Staff Time Total Estimated Cost for this Phase of Work Budget for this Phase of Work Water Utility Total Budget for this Phase of Work Estimated Surplus/(Deficit) for this Phase of Work (B - C) Estimated Surplus/(Deficit) from previous phases Total Estimated Surplus/(Deficit) COMMUNITY ENGAGEMENT: 477,531.22 (47,499.54) 430,031.68 A 7,072.00 $437,103.68 C 245,140.00 $245,140.00 B (191,963.68) D $(191,963.68) E INFORM — This report has been posted to the City's website with the agenda in advance of the council / committee meeting. PREVIOUS CONSIDERATION OF THIS MATTER: Not applicable ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services