Loading...
HomeMy WebLinkAboutFCS-17-158 - P17-114 Playground Design Supply and InstallationStaff ReportiTC I N R finance and Como "ate Services Department www.kitchen er ca REPORT TO: Committee of the Whole DATE OF MEETING: 2017-08-28 SUBMITTED BY: Michelle Palmer, Director of Supply Services 519-741-2200 ext. 7214 PREPARED BY: Adam Buchholtz, Buyer, 519-741-2200 ext. 7217 WARD(S) INVOLVED: Ward(s) 3, 4, 7 DATE OF REPORT: 2017-08-17 REPORT NO.: FCS -17-158 SUBJECT: P17-114 Playground Design, Supply and Installation RECOMMENDATION: That Proposal P17-114 Playground Design, Supply and Installation - Resurrection Park Playground be awarded to New World Park Solutions Inc., Brantford, Ontario, at their proposed price of $59,201.88, plus HST of $7,696.24 for a total of $66,898.12; and, That Proposal P17-114 Playground Design, Supply and Installation - Upper Canada Neighbourhood Park Playground be awarded to Openspace Solutions Inc., Wellesley, Ontario, at their proposed price of $58,206.70, plus HST of $7,566.87 for a total of $65,773.57; and, That Proposal P17-114 Playground Design, Supply and Installation - Traynor Park Playground be awarded to Henderson Recreation Equipment Limited, Simcoe, Ontario, at their proposed price of $44,993.37, plus HST of $5,849.14 for a total of $50,842.51. BACKGROUND: On August 28th Council will be asked to consider two contracts regarding the preparation, design, and installation of new park and playground amenities related to Resurrection Park, Upper Canada Neighbourhood Park, and Traynor Park. This tender relates to the design, supply and installation of the new playground equipment, while the other tender (T17-113) relates to the site preparation required prior to playground installation, and construction of connecting trails and accessible access ramps. It has *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. been found to be more efficient and cost effective to separate out park works in this manner. Resurrection Park is located at 71 Resurrection Drive within Ward 7, and is directly adjacent to the property of Resurrection Catholic Secondary School. The park which encompasses 0.41 ha is also adjacent to a SWM Pond facility along Resurrection Drive. The existing playground equipment within Resurrection Park is scheduled to be replaced in 2017 as part of the annual playground replacement budget, as it has also come to the end of its 20 year life expectancy. In addition, due to AODA Accessibility requirements an accessible pathway is required to be installed from the existing maintenance access for the SWM Pond facility to the playground. Upper Canada Neighbourhood Park is located at 216 Farrier Drive within Ward 4. The park which encompasses 0.65 ha is accessible from an existing walkway block between residential addresses 9 Farrier PI. and 19 Farrier PI. The existing playground equipment within Upper Canada Neighbourhood Park is scheduled to be replaced in 2017 as part of the annual playground replacement budget, as it has come to the end of its 20 year life expectancy. In addition, due to AODA Accessibility requirements an accessible pathway is required to be installed from the existing walkway block to the playground. Please note that Upper Canada Neighbourhood Park is located on the west side of Schneider Creek and is not associated with the Southwest Optimist Sports Field work that is currently being undertaken. Traynor Park is located at 345 Traynor Ave., within Ward 3 and encompasses only 0.15 ha. Following recent Ion LRT construction, the playground that was previously located within Traynor Park was removed, as it existed on KW Hydro Lands. The City of Kitchener is replacing the playground in the most suitable revised location within park property. In addition, due to AODA Accessibility requirements an accessible pathway will be installed from the existing adjacent pedestrian trail to the playground. REPORT: This Proposal was advertised publicly on the City of Kitchener website and the Internet through the Ontario Public Buyers Electronic Tendering Information System. Proposal documents were downloaded by twelve (12) interested parties and by the closing date of Tuesday August 15, 2017, six (6) proposals had been received. The proposals were reviewed by K. Leasa, Associate Landscape Architect, D. Dychuck, Supervisor Operations (Technical), P. Hawthorne, Parks Maintainer (Services) and A. Buchholtz, Buyer, who concur with the above recommendation. The following proposals were received- A.B.C. Recreation Ltd. Paris ON Henderson Recreation Equipment Ltd. Simcoe ON New World Park Solutions Inc. Brantford ON Openspace Solutions Inc. Park N Play Design Playpower LT Canada Inc. Wellesley ON Rocky View County, AB Paris ON The proposals were rated on the following criteria: • Quality of Play • Quantity of Play • Variety of Play • Creativity • Circulation Patterns • Visual Appeal • Maintenance • Required Play Items • Service • Duration and Coverage • Cost ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: The recommendation of this report supports the achievement of the city's strategic vision through the delivery of core service. FINANCIAL IMPLICATIONS: The net cost for this proposal (A), is fair and reasonable for a project of this scope and the upset limit is within the funding available (B) for this project. Funding for this project is included within the approved capital budget. The estimated surplus (D) will be used to fund future playground work. P17-114 Playground Design, Supply and Installation Estimated Cost for this Phase of Work Proposal P17-114 costs, including HST less: HST rebate Net Cost Being Awarded Projected Costs Total Estimated Cost for this Phase of Work Budget for this Phase of Work Resurrection Upper Traynor Total Park Canada Park Playground Park Playground Playground 66,898.12 65,773.57 50,842.51 183,514.20 (6,654.29) (6,542.43) (5,057.25) (18,253.97) 60,243.83 59,231.14 45,785.26 165,260.23 A $60,243.83 $59,231.14 $45,785.26 $165,260.23 C Playground AODA Requirements 57,800.00 Playground General Provision Capital Account 112,200.00 Total Budget for this Phase of Work $170,000.00 B Estimated Surplus/(Deficit) for this Phase of Work (B - C) 4,739.77 D Total Estimated Surplus/(Deficit) $4,739.77 E COMMUNITY ENGAGEMENT: INFORM — This report has been posted to the City's website with the agenda in advance of the council / committee meeting. PREVIOUS CONSIDERATION OF THIS MATTER: Not applicable ACKNOWLEDGED BY: Dan Chapman, Deputy CAO & City Treasurer, Finance and Corporate Services