Loading...
HomeMy WebLinkAboutINS-18-001 - South Kitchener District Park - 1664 Huron Road Heritage HouseREPORT TO: Community & Infrastructure Services Committee DATE OF MEETING: February 5, 2018 SUBMITTED BY: Denise McGoldrick, Director Operations, Environmental Services (519-741-2600 x 4657) PREPARED BY: Trevor Jacobs,Park Development Project Manager (x4239) WARD(S) INVOLVED: Ward 5 DATE OF REPORT: January 22, 2018 REPORT NO.: INS-18-001 SUBJECT: South Kitchener District Park 1664 Huron Road Heritage House ___________________________________________________________________________ RECOMMENDATION: That council receive the information in INS-18-001 regarding 1664 Huron Road heritage house and associated estimated costing and further, That council direct staff to proceed with Alternative 2 Move Intact of the heritage home for re-use at the South Kitchener District Park BACKGROUND: The South Kitchener District Park (SKDP) Master Plan identified an amenity facility for the park to serve as a secondary building for washrooms,change rooms, and food vending machines, and identified the existing heritage structure as an opportunity to provide these services. A Heritage Impact Assessment (HIA) was prepared and confirmed that the farm house is a significant heritage resource and meets the criteria for designation under the Ontario Heritage Act. The preferred alternative of the HIA looked to demolish only the south addition of the farm house (which is in poor condition), and to remove (dismantle), rebuild and reuse the stone farmhouse as an amenity building elsewhere within the Park. The HIA was approved by the Director of Planning and is to be used to guide the further processing of the Site Plan application. Additional engineering analysis was undertaken and together with a professional house moving company, confirmed that lifting and moving *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. 4 - 1 the farm house intact to a new location is a viable alternative. This relocation method is recommended by the heritage consultant because it retains the physical structure and involves less intrusive intervention than the dismantling approach. The SKDP design includes plans to move the farm house to be in proximity to the proposed splash pad, playground, and basketball courts in keeping with the original park master plan objectives. In the second phase of the park, the farm house is planned to be rehabilitated to provide washrooms,change rooms and a custodial storage room to function as the park amenity building. On September 25, 2017, Council considered recommendations from CSD-17-074, discussed at the Heritage Kitchener meeting of September 5, 2017, and dealt with a Notice of Intention to Demolish received by the City, in order to proceed with the recommended conservation alternative of removing and relocating the farm house. Council deferred the recommendation to the October 16, 2017 Council meeting to allow staff to provide additional information.The October 16, 2017 INS-17-080provided additional information on risk management related to moving the farmhouse structure, cost breakdown of the alternatives considered, and information on past heritage related projects. The report noted a higher level of uncertainty in risk and cost since the site design had not been finalized as of that date and that more accurate costing would be available through additional study. Additional heritage consulting work approved on September 25, 2017 was intended to provide further analysis and costing related to the heritage farm house. The following amended recommendation was approved by Council: That in accordance with Section 27 (3) of the Ontario Heritage Act, the written Notice of Intention to Demolish dated August 15, 2017 to demolish the south addition and to remove and relocate the original farm house located on the property municipally addressed as 1664 Huron Road, as outlined in Community Services Department report CSD-17-074be received for information and that the notice period run its course; and further, that staff be directed to report back prior to the end of January 2018 with additional information once the in-depth study hasbeen completed, providing additional financial implications between Alternatives 1 and 2, as outlined in Report INS-17- REPORT: In order to provide more detailed information regarding the relocation of the heritage building, an Adaptive Reuse Plan (ARP) was developed. The ARP is guided by the information and recommendations available within the Heritage Impact Assessment prepared by Stantec (March 2017) and the draft Conservation Plan prepared by Stantec (Aug. 2017). The ARP provides a schematic floor plan for the redevelopment of the heritage house into a washroom and change room facility that will support park functions. The floor plan was developed in consultation with City staff and was informed by a structural review conducted by Tacoma Engineers Inc. (Dec 2017). The ARP identifies key tasks associated with the relocation, preservation, and redevelopment of the building including associated timing and costs. 4 - 2 This report is intended to provide additional information requested by Council during the October 16, 2017 Council meeting. The additional information includes: Adaptive Reuse Plan conclusions; Heritage house implementation schedule; Cost breakdown of alternatives; Adaptive Reuse Plan Conclusions In general, the existing farm house building was found to be in good condition and is a good candidate for the proposed adaptive reuse plan. Most of the deterioration was observed in the main floor wood framing and the current plan will have the main floor framing removed and a new concrete slab on grade poured inside the frost walls. Some reinforcement will be required to meet the modern live and snow loads, including new roof framing and interior posts to support the existing second floor framing however the internal inspection identified that the building requires significantly less effort than was originally anticipated to relocate and renovate the farm house. Heritage House Implementation Schedule The adaptive reuse of the existing farm house will require multiple tasks that will be completed commencing winter 2018 with the renovation project completed in Phase 2 of the park works estimated in 2022. Task One Preparation of Building (Winter 2018) - Removal of rear addition, interior finishes, and vegetation surrounding the house; - Installation of venting in doorways and windows, as well as tarping the roof. Task Two Relocation of Building (Phase 1 Construction 2018-2019) - Stabilizing and bracing to facilitate the move, and soffit and fascia repair; - Installation of a haul road, construction of a frost foundation and slab. Task Three Medium term conservation and Monitoring (2019-2022) - Because the amenity building is included in phase two of the park development, the building is to be preserved until Phase 2 of the park development; - Monitoring of the structure for pests and vandalism, ensure conservation measures are in good repair. Task Four Building Renovation (2022) - Replacement of the existing roof framing and shingles; - Internal renovations to meet proposed floor plan. 4 - 3 Cost Breakdown of Alternatives The ARP provides cost analysis for the following alternatives: Alternative 1 New Build Construction of a new concrete block construction three season facility with interior finishes. To compare the new build respectively to the existing farm house, the size (1,408 sq. ft.) and layout has been made similar to that of the farm house.The costing for alternative 1 utilizes a cost estimate of $450/sq. ft. for a total construction cost of $633,600. In addition, the demolition of the existing structure is estimated to be approximately $40,000. This estimate is considered to be accurate within 20% to 30%. Therefore the estimated total cost of alternative 1 including 20% contingency is $808,320. Alternative 2 Move Intact The heritage house will be relocated to a different area of the property and renovated using up-to-date interior fixtures and building materials to serve the park as a public washroom and change room facility. The opinion of probable cost to relocate and renovate the heritage house is $608,350. This estimate is accurate to within 15% to 20%. Therefore the estimated total cost of alternative 2 including 20% contingency is $730,800. The breakdown of costs for alternative 2, based on the tasks identified above, is provided in table 1. Table 1: Summary of Estimated Costs for Alternative 2 TasksEstimatedCosts Task 1: Preparation of Building $70,000 Task 2: Relocation of Building$266,000 Task 3: Conservation and Monitoring$4,000 Task 4: Building Renovation$269,000 Subtotal$609,000 1 Contingency (20%)$121,800 Range of total costs$730,800 Summary The South Kitchener District Park site design requires the removal/relocation of the existing stone residence on the property to fulfill the site and amenity requirements. Relocating the heritage home within the property was determined to be the preferred option to address site plan requirements as it not only fulfils a number of amenities of 4 - 4 the SKDP Master Plan, it also retains the heritage attributes associated with the original farm house. Relocation and re-use of the heritage home supports heritage best practices (or findings of the HIA) by maintaining the physical and design attributes of the house and keeps the residence connected to the original property. It also supports the recommendation to not only conserve the heritage attributes but find an appropriate way to re-use the structure in the delivery of park amenities in this case as a washroom/change room facility. ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: The development of the South Kitchener District Park aligns with the community vision, ve, caring and vibrant Kitchener with safe and and FINANCIAL IMPLICATIONS: The cost to relocate and rehabilitate the stone farmhouse as an amenity building can be accommodated within the existing capital budget for the SKDP. COMMUNITY ENGAGEMENT: INFORM: advance of the council / committee meeting. th CONSULT: A Public Information Centre (PIC) was held September 14, 2017, including a posting on EngageKitchener requesting resident and user feedback on the proposed Splash Pad and Playground concept design, and Phase Two amenities. PREVIOUS CONSIDERATION OF THIS MATTER: INS-13-043 South Kitchener District Park Master Plan INS-17-071 South Kitchener District Park, Phase 1 Consultant Fee Increase FCS-17-163 T17-034 South Kitchener District Park (SKDP) Phase 1 Area Grading CSD-17-074 Notice of Intention to Demolish INS-17-080 South Kitchener District Park Heritage House Additional Information ACKNOWLEDGED BY: Cynthia Fletcher, Interim Executive Director, Infrastructure Services 4 - 5