HomeMy WebLinkAboutCIS Agenda - 2018-03-05Community &Infrastructure Services Committee
Agenda
Monday, March 5, 2018
3:30 p.m. - 5:30 p.m.
Office of the City Clerk
Council Chamber
Kitchener City Hall
nd
200 King St. W. - 2 Floor
This is an approximate start time, as this meeting will commence immediately following
Kitchener ON N2G 4G7
the Finance & Corporate Services Committee meeting.
Page 1 Chair - Councillor K. Galloway-Sealock Vice-Chair - Councillor S. Marsh
The following matters are considered not to require debate and should be approved by one motion in
accordance with the recommendation contained in each staff report. A majority vote is required to discuss any
report listed as under this section.
1. CSD-18-021 - 2018 Community Grants Tier 2
2. INS-18-005 - Summary Water Report - January - December 2017
-law, delegations are permitted to address the Committee for a maximum of
5 minutes.
Item 3 - Mike Flannery
3. INS-18-011 - On-Street Parking Regulations - Yellow Birch Drive (15 min)
4. INS-18-008 - Fallowfield Drive Traffic Calming Review (10 min)
5. INS-18-009 - Parkvale Drive Traffic Calming Review (10 min)
6. INS-18-010 - Sims Estate Drive Traffic Calming Review (10 min)
7. CSD-18-047 - Potential Facility Partnership with the Waterloo Region District School (30 min)
Board in the Huron South Area
INS-18-006 - DWQMS Management Review Summary Report 2017
Unfinished Business List
Dianna Saunderson
Committee Administrator
** Accessible formats and communication supports are available upon request. If you require assistance to
take part in a city meeting or event, please call 519-741-2345 or TTY 1-866-969-9994 **
REPORT TO: Community and Infrastructure Services Committee
DATE OF MEETING:March 5, 2018
SUBMITTED BY:Michael May, Deputy CAO, Community Services (519-741-2200,
ext. 7079)
PREPARED BY:Kathleen Woodcock, Manager, Service Coordination and
Improvement (519-741-2200, ext. 7597); Carrie Kozlowski,
Executive Assistant, Community Services (519-741-2200, ext.
7395)
WARD(S) INVOLVED:All
DATE OF REPORT:February 12, 2018
REPORT NO.:CSD-18-021
SUBJECT:2018 COMMUNITY GRANTS TIER 2
___________________________________________________________________
RECOMMENDATION:
That 2018 Community Grants Tier 2 in the amount of $179,134be approved as
outlined in Appendix A attached to Community Services Department report CSD-
18-021; and,
That the following organizations be approved to move to the Tier 1 grant process
effective the 2019 grant year:
1.Coalition of Muslim Women
2.KW Children’s Drama Workshop (actOUT)
3.Noteworthy Singers
4.Ray of Hope-Youth Addiction Services
5.Southwest Kitchener Optimist Club; and further
That the outstanding balance of $604 remain in the account and be posted as a
positive variance at the end of the year and then transferred into the tax
stabilization reserve.
BACKGROUND:
Community Grants Tier 2 are intended to provide assistance to organizations/groups
that provide not for profit services within the City of Kitchener for the common good of
residents. Organizations/groups providing municipal services in the areas of arts and
culture, special events, sports and recreation, and community support and development
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
1 - 1
will be considered for funding. Organizations/groups applying for funding to the City of
Kitchener for the first time or those who have received a Tier 2 grant in previous years
are eligible to apply. Tier 1 organizations are eligible to apply for Tier 2 funding only for
one time special projects or events.
A Peer and Staff Review Committee, comprised of three community representatives
and seven staff representing arts and culture, special events, sport development,
community development and neighbourhood development, reviews applications as per
a variety of assessment categories such as community need, organizational need and
capacity, partnership support and financial analysis. This committee allocates resources
within budget availability and makes recommendations to Council.
REPORT:
This report identifies organizations that have requested a 2018Tier 2 grant, outlines the
process used in assessing these requests and provides the Peer and Staff Review
Committee’srecommendations for grant allocations. The process for 2018 Tier 2 grants
included:
a public information session held on November 15, 2017
an application deadline of 5:00 pm on November 28, 2017
a review and assessment of applications by a Peer and StaffReview Committee
using the Grant Allocation Assessment Framework (Appendix B)
grant recommendations made by the Peer and Staff Review Committee to
allocate resources (Appendix A)
an appeal submission deadline of 12:00 pm on February 12, 2018
a meeting ofthe staff appeal panel on February 20, 2018 to review appeals (as
directed by City Council on August 28, 2017)
a notification to grant applicants of the Peer and Staff Review Committee’s
recommendations
Staff received 54 Tier 2 grant applications, for atotal request of $336,512in grant
funding for 2018. The total amount of Tier 2 funding available for 2018 is $179,738.
Members of the Peer and Staff Review Committee reviewed each grant application in
detail and, using the Grant Allocation AssessmentFramework, made decisions on grant
allocations within budget availability.
Committee members, both community volunteers and staff, spent considerable time and
effort reviewing and assessing each application. Each member spent approximately 20
to 25 hours reviewing the applications individually and the committee met three times
for a total of eight hours to make final recommendations. The diversity of knowledge
and expertise at the Peer and Staff Review Committee level, as well as the detailed
review of each application package, ensures that each application is considered in
context with all other applications when determining which grant requests should be
recommended for funding.
1 - 2
Appendix A outlines the grant applicants, the requested amountsand the final grant
recommendations.
This report also recommends the transfer of several organizations from the Tier 2 to the
Tier 1 grant process. The Council approved Community Investment Policy I-525 states
that organizations/groups receiving Tier 2 funding can be considered for Tier 1 funding
after having received support from the City of Kitchener for five years or more. To
receive Tier 1 funding, the organizations must also be incorporated, or agree to become
incorporated within a specific timeframe, as a not for profit corporation and must enter
into a legal agreement with the City, from one to five years in length. The agreements
outline the responsibilities of the City and the responsibilities of the grant recipient
including details of services/events for whichthe grant is provided, financial reporting
requirements, and insurance/indemnity requirements.
The chart below provides a summary of the organizations eligible to transfer to the Tier
1 grant process for the 2019 funding year. If approved, these groups will move with a
base grant amount equal to their 2018 Tier 2 grant. Note that as a result of this change,
there will be a corresponding reduction in the amount of funding available for Tier 2
grants in 2019.
Previous
2018Grant
OrganizationType of GrantYears
Recommendation
Funded
Coalition of Muslim Women of $7,000cash2013-2017
Kitchener Waterloo
KW Children’s Drama Workshop $2,000cash2013-2017
(actOUT)
Noteworthy Singers$2,000cash2013-2017
Ray of Hope –Youth Addiction $5,000 in kind2013-2017
Services
Southwest Kitchener Optimist $1,250in kind2013-2017
Club
TOTAL$17,250
ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN:
The recommendation of this report supports the achievement of the city’s strategic
vision through the delivery of core service.
FINANCIAL IMPLICATIONS:
The budget for 2018 Community Grants Tier 2 is $179,738. The Peer and Staff Review
Committee recommends a total allocation of $179,134 leaving a balance of $604
unallocated.
The Peer and Staff Review Committee made recommendations for 2018Tier 2 grants
based on the validity and completeness of applications received.For this grant cycle,
1 - 3
the financial information submitted by groups requesting amounts of $10,000 or greater
were reviewed by the Director of Revenue. This review provides additional subject
matter expertise for the financial analysis of grant requests of significant amounts.
There is no impact to the 2018 Tier 2 community grant budget as a result of the appeal
process.
The following chart provides a history of Tier 2 grant funding. Tier 2 grant budgets vary
annually as the amount allotted to this funding source is the balance remaining after
other grant sources (Tier 1, in kind facility and travel assistance grants) are approved
during the annual budget process.
Peer and Staff
Tier 2 #of Tier 2
Tier 2 Grants
Review Committee
YearGrant Applications Grant
Approved by Notes
Tier 2 Grant
BudgetReceivedRequestsCouncil
Recommendations
2018179,73854$336,512$179,134TBDTier 2 budget is
$179,738, leaving a
balance of $604
unallocated
2017$186,55459$362,784$157,236$161,736$24,818 transferred on
a one time basis to the
Special Events
Division to assist with
the City’s Canada 150
Celebration event
2016$156,50967$360,554$155,720$164,147Over expenditure due
to Council approval of
appeals ($7,638)
2015$192,86861$422,425$190,765$192,165Approved amount
higher than staff
recommendation due
to Council approval of
appeals and grant re-
allocations ($1,400)
2014$175,59567$579,057$173,566$181,766Over expenditure due
to Council approval of
appeals ($6,171)
2013$147,79046$326,206$147,526$158,908Over expenditure due
to Council approval of
appeals ($11,118)
Grant Appeals
As City Council directed through its August 28, 2017 motion, a change to the appeal
process was introduced for the 2018 community grants cycle. This year, a panel of staff
(CAO, DCAO for Community Services and the Executive Director to the CAO)
considered and made decisions on all Tier 1 and Tier 2 appeals.
In late January, staff notified all Tier 2 grant applicants of the Peer and Staff Review
Committee’s recommendations for Tier 2 grant allocations and advised them of their
1 - 4
opportunity to submit a written appeal. Staff received appeals from three organizations
as follows:
Organization2018 Grant Amount 2018 Grant Amount Appeal
RequestedRecommendedAmount
Najda Now$6,500 $0$6,500
($6,000 cash,
$500 in kind)
Summer Lights Festival$12,620 $7,000 (in kind)$5,620
($7,000 cash,
$5,620 in kind)
Summer Night Movies$3,800 (in kind)$0$3,800
Total Value of Appeals$15,920
The staff appeal panel considered the written appeal submissions, and upheld the Peer
and Staff Review Committee’s recommendation to deny all three appeals. Appellant groups
received correspondence indicating the appeal decision on February 23, 2018.
COMMUNITY ENGAGEMENT:
INFORM – The process for 2018 Community Grants Tier 2 grants was advertised on
the City’swebsite and in publications of Active Kitchener and Kitchener Life. Previous
Tier 2 grant recipients were also sent information regarding the 2018 grant process, as
were all Tier 1 grant recipients. These groups were also invited to attend a public
information session on November 15, 2017to obtain information regarding the
community grants Tier 2 process and meet sector staff.
All grant applicants were informed of the Peer and Staff Review Committee’s grant
recommendations and were invited to submit written appeals for consideration by the
staff appeal panel.
This report has been posted to the City’s website with the agenda in advance of the
council/committee meeting.
CONSULT – The Peer and Staff Review Committee provided invaluable expertise
throughout the assessment process.Their commitment and dedication are very much
appreciated.
A
CKNOWLEDGED BY: Michael May, Deputy CAO, Community Services
Appendix A: Community Grants Tier 2 - 2018Recommendations
Appendix B: Community Grants Tier 2 - Grant Allocation Assessment Framework
1 - 5
Report CSD-18-021- Community Grants Tier 2 - Appendix A
2018 Type of
2018 Final GrantGrant
Recommendation
Recommended
2018 Grant2018 Type of (after appeals(after appeals
Organization NameRequestGrant Requestprocess)process)
Age of Majority Singers$5,500in kind$5,500in kind
ArtsBuild Ontario$3,000$0
Belmont Village Bestival$15,339$11,593 cash; $5,200$4,000 cash,
$3,746$1,200 in kind
Big Brothers Big Sisters of Waterloo Region$5,313$5,000 cash; $5,313$5,000 cash;
$313 in kind$313 in kind
Button Factory Arts$5,000$0
Canadian Clay and Glass Gallery$5,000$3,000
Caribbean Dreams Concert Inc. $3,200$2,000 cash; $3,200$2,000 cash;
$1,200 in kind$1,200 in kind
Central Frederick Neighbourhood Association $3,000$3,000
-Hohner Avenue Porch Party
$2,650in kind$2,650in kind
Cherry Park Neighbourhood Association
(Cherry Festival)
CKMS - Radio Waterloo$4,000$2,000
Coalition of Muslim Women of Kitchener-$7,000$7,000
Waterloo
Community Coalition on Refugee and $3,500$2,500 cash; $3,500$2,500 cash;
Immigrant Concerns$1,000 in kind$1,000 in kind
Community Kitchen Co-operative Kitchener $15,000$0
Waterloo Inc.
Community Music School of Waterloo Region $10,000$8,000
(Lyrical Lines Education Network)
Cosmic Fishing Theatre$6,000$5,000 cash, $1,000in kind
$1,000 in kind
Country Hills Recreation Association (Cinema$1,936($715 cash; $1,936$715 cash;
Under the Stars)$1,221 in kind)$1,221 in kind
Crossroads Productions$1,600$1,000 cash; $1,600$1,000 cash;
$600 in kind$600 in kind
Cycle Waterloo Group$13,500in kind$10,000in kind
Extend-A-Family Waterloo Region$6,725$5,000 cash; $4,500$2,500 cash,
$1,725 in kind$2,000 in kind
FIRST Robotics Canada$5,000$3,000
For Hungarians in Canada Association (Euro $17,000$10,000 cash; $0
Sport Fest 2018 Multicultural Festival)$7,000 in kind
Global Youth Volunteer Network - $13,682$3,000$2,000 cash,
Wasahkotewinokwak$1,000 in kind
Grand River Voices$10,000$5,000 cash, $3,000$1,500 cash,
$5,000 in kind$1,500 in kind
Green Light Arts$10,000$9,000 cash; $8,000$7,000 cash,
$1,000 in kind$1,000 in kind
$3,000$0
India Canada Association of Waterloo Region
(Mela Festival)
Irish Real Life Festival$5,000$4,000
JM Drama Alumni/The Registry Theatre$10,000$10,000
1
1 - 6
Report CSD-18-021- Community Grants Tier 2 - Appendix A
2018 Type of
2018 Final GrantGrant
Recommendation
Recommended
2018 Grant2018 Type of (after appeals(after appeals
Organization NameRequestGrant Requestprocess)process)
KW Art Gallery$2,500$2,500
KW Children's Drama Workshop(actOUT)$4,000$2,000
p$5,275in kind$5,275in kind
KW Comicon Grou
KW Musical Productions$6,500$5,000 cash; $6,500$5,000 cash;
$1,500 in kind$1,500 in kind
KW Oktoberfest$10,000$10,000
KW Taiwanese Cultural Association$1,080in kind$1,080in kind
Movies in the Park$4,500$3,500 cash; $0
$1,000 in kind
Naja Now$6,500$6,000 cash; $0
$500 in kind
NoteWorthy Singers$2,000$2,000
NUMUS$5,000$4,000
Page 1 Entertainment (formerly Page 1 $6,000$1,500
Productions)
Project Uprooted (formerly Uprooted Media $9,500$7,615 cash; $2,885$1,000 cash,
Collective)$1,885 in kind$1,885 in kind
Rainbow Reels (Queer and Trans Film $1,800$1,200 cash; $1,800$1,200 cash;
Festival)$600 in kind$600 in kind
Ray of Hope - Youth Addiction Services$5,000in kind$5,000in kind
ple Senior Club$3,000$1,000
Red Ma
Royal Medieval Faire$3,000$2,000
Schneider Creek Porch Party$10,116$9,606 cash; $2,400$2,000 cash,
$510 in kind$400 in kind
ptimist Club$1,250in kind$1,250in kind
Southwest Kitchener O
SPECTRUM - Waterloo Region's Rainbow $5,000$3,500 cash; $5,000$3,500 cash;
Community Space$1,500 in kind$1,500 in kind
Spiritus Ensemble Inc.$4,500$3,500
Starlight Presents Festival for Youth$4,000$2,800$2,500 cash,
$300 in kind
Summer Lights Festival$12,620$7,000 cash; $7,000in kind
$5,620 in kind
ght Movies$3,800in kind$0
Summer Ni
The AIDS Committee of Cambridge, $10,200$9,650 cash; $1,245in kind
Kitchener, Waterloo and Area$550 in kind
The Healing of the Seven Generations$7,400$5,000
$4,650$2,000
The New Quarterly Literary Society (Wild
Writers Literary Festival)
$3,000
Young@rt c/o Arts4All$6,376($6,048 cash;
$328 in kind)
TOTALS$336,512$179,134
2
1 - 7
CSD-18-021 –Community Grants Tier 2 –Appendix B
City of KitchenerCommunity Grants Tier 2
Grant Allocation Assessment Framework
Community Grants Tier 2 are reviewed usinga three stageassessment process. All grant applications are reviewed by a Peer & Staff
Review Committee, composed of staff and community volunteers.Oncethereview committeemembers are satisfied that an
application meets the criteria, it willmake recommendationsto Council as to which grantsapplications should be approved.
1.Stage 1 Assessment –Primary Criteria
Applications arefirstreviewed using the primary criteria noted below. Applications will only proceed to the second stageonce
the review committeemembers are satisfied the following criteria are met.
1.The grant applicant must submit a fully completed application form, current financial statement, detailed budget(s), and
any other information relevant to the grant request.
2.Services provided by the organization/group for which funding is requested must be intended for the common good of the
residents of Kitchener and demonstrably meet Council’s strategic objectives as documented in the City of Kitchener
Strategic Plan and other policy documents.
3.Services provided by the organization/group for which fundingis requested must be considered a municipal responsibility
(arts and culture/special events, sports and recreation, community support and development) and not be the responsibility
of other levels of government; services such as health care, social services, training and education are not eligible.
4.Services provided by the organization/group for which funding is requested must not be precluded under the Municipal
Act, e.g. religious services.
5.Services provided by the organization/group for which funding is requested must not already be provided by the City or by
other groups funded by the City of Kitchener; requests from organizations/ groups that provide similar services as
provided by the municipality must be assessed as to whether there is a duplication of services; the municipality will not
issue grants for services that conflict with or are in direct competition with programs operated internally.
6.Services provided by the organization/group for which funding is requested must be provided directly to the citizens of
Kitchener, i.e. grants are for direct programs only. Grant applications from organizations that themselves distribute grants
to other organizations will not be considered, i.e. fundraising events are not eligible. Service clubs are eligibleto apply for
funding if the purpose of the event they are sponsoring is deemed to be a municipal responsibility and the event is city-
wide, targeted toward a broad cross-section of the community.
7.Grant applications submitted by individuals or ‘part groups’ of an organization/group will not be considered.
8.Volunteer organizations/groups planning an event to raise funds to support an organization/group that is receiving a City
of Kitchener grant will be not considered for Tier 2 funding.
9.Grant requests of a ‘capital’ nature are ineligible for funding. ‘Capital’ is defined as the acquisition of an infrastructure or
asset having a lifespan of three years or greater.
10.Any organization/group applying for funds will give regard to the inclusion and accommodation of persons with a disability.
11.Any organization/group applying for funds that is in arrears and/or in litigation with the City of Kitchener is ineligible.
1 - 8
2.Stage 2 Assessment – Secondary Criteria
Applications proceeding to the second stage assessment are reviewed using the criteria noted below. If the review committee
members aresatisfied that the application meets all of these criteria, the grant application moves to the third stage
assessment.
1.Community Need: Does the proposed project or service provided by the organization align with community priorities as
stated in the strategicplan or articulated by staff?
2.Organizational Capacity: Applicants must demonstrate an ability to initiate and follow through on projects, events and/or
operations, usually evidenced by having an organizational structure in place to lead and manage the activities. Does the
sponsoring group or organization have the capacity to deliver the proposed project or service?
3.Financial Analysis: Organizations/ groups do not need to be incorporated as not for profit corporations; however, budgets
and subsequent accounting must not show an excess of revenue over expenses. Applicants must demonstrate how they
will be accountablefor grant funds, usually evidenced by the existence of an executive committee or coordinating board.
Can the organization demonstrate that it (and the proposed project or service) operates according to sound management
principles and is financially sound? Can it demonstrate financial accountability and organizational sustainability?
4.Previous Tier 2 Funding (if applicable): Did the organization provide afinancial accounting and quantitative/qualitative
measures of successfor the most recentTier 2 grantreceived?
3. Stage 3 Assessment –Guiding Principlesfor Grant Allocations
Applications proceeding to the third stage assessment are reviewed by committee membersusing theguiding principles noted
below to recommend grant allocations.
1.Requests from organizations where other funding opportunities exist are generally deemed a lower priority (e.g. potential
of funding from other levels of government, private sponsorships/donors, other area municipalities if services provided are
available to residents of those municipalities, etc.).
2.Requests for the City of Kitchener to fund 100% of the program, project or event costs are generally deemed a lower
priority.
3.Requests from organizations demonstrating support from other funders, donors and/or partners are generally deemed a
higher priority (e.g. large volunteer base, in kind (non cash) contributions, private donations, other municipal funding,
etc.).
4.Requests for a significant amount of funding that cannot be accommodated within the existing Tier 2 budget allocation are
deemed a lower priority; partial funding may be considered if by doing so there is little or no impact on the program,
project or event.
5.Requests from organizations providing a service, project or event that fits with the demonstrated need of the organization
are generally deemed a higher priority.
6.Requests from organizations that demonstrate financial and organizational sustainability are generally deemed a higher
priority (e.g. organizing committee or board of directors is in place to ensure accountability).
7.Requests from organizations providing a service, project or event that ensures as much inclusive public participation and
access as possible are generally deemed a higher priority (e.g. minimum or no admission charge; fee assistance program
in place).
8.Requests that align with sector strategic plans and documents are generally deemed a higher priority.
October 2016
1 - 9
REPORT TO: Community & Infrastructure Services
DATE OF MEETING: March 5, 2018
SUBMITTED BY: Greg St. Louis, Director, Utilities 519-741-2600 X4538
PREPARED BY: Angela Mick, Utilities Water Engineer 519-741-2600 X4408
WARD(S) INVOLVED: All
DATE OF REPORT: February 12, 2018
REPORT NO.: INS-18-005
st
SUBJECT: Summary Water Report January 1 to December 31, 2017
___________________________________________________________________________
RECOMMENDATION: THAT the 2017 City of Kitchener Summary Drinking Water
Report be received for information as required by O.Reg. 170/03 Schedule 22 of
the Safe Drinking Water Act,
AND FURTHER THAT the City of Kitchener provide a copy of the Summary
Drinking Water report to the Township of Woolwich and the City of Waterloo as
required by Schedule 22 of O.Reg. 170/03.
EXECUTIVE SUMMARY:
During the 2017 reporting period, the Kitchener Distribution System met the
requirements of the Safe Drinking Water Act.
BACKGROUND:
As outlined in Schedule 22 of the Drinking Water Systems Regulation (O.Reg.170/03) of
the Safe Drinking Water Act, 2002, a summary report is to be prepared and given to the
members of the municipal council. The following information is required to be included
in this report:
that the system failed to meet at any time during the period covered by the report and
specify the duration of the failures; and
(b)for each failure referred to in (a), describe the measures that were taken to correct
the failure.
The report must also include:
1.A summary of the quantities and flow rates of the water supplied during the period
covered by the report.
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
2 - 1
REPORT:
The following matters are reported to Council in accordance with the requirements of
the Safe Drinking Water Act, for the period from January 1 to December 31, 2017:
The Kitchener Distribution System is part of an Integrated Urban System,
meaning the Regional Municipality of Waterloo is responsible for water treatment
and the development and operation of a trunk water network to distribute treated
water to Kitchener, Cambridge, Waterloo, Woolwich and Wilmot. The Region
provides annual summaries for each supply and the information is available on
their website with a link from the Kitchener Utilities website.
A portion of Kitchener (River Ridge area) is supplied by the City of Waterloo.
Kitchener supplies water to a small section of Waterloo (Ira Needles area) and
water travels through the Kitchener distribution system to Breslau. The City of
A Ministry of Environment and Climate Change (MOECC) inspection was
completed February 1-2, 2018 and covered January 1, 2017 to January 31,
2018.issued their
report; preliminary findings did not identify any issues of non-compliance while
the inspector reviewed documentation with the City on February 1-2.
There were 2,638 chlorine residual samples taken and 2,053 bacteriological
samples taken within the distribution system. Of these, there were 35 Adverse
Table 1).
o The number of low chlorine AWQIs (22) were at repeat locations and were
largely due to broken valves, large diameter watermains taken out of
service for construction, and other construction activities which created
temporary dead ends. These dead ends have now been resolved.
o The majority of the total coliform AWQIs (8 total) were on temporary
watermains and the resamples were clear.
Dead end watermain flushing is a proactive approach to increase the levels of
chlorine in the distribution system. The water is initially disinfected (primary
disinfection) at the treatment plant and sufficient chlorine is added to protect the
water from microbiological contamination as it travels through the pipes in the
distribution system (secondary disinfection). Low chlorine does not pose a threat
to human health; to have an impact to human health, there must be
microbiological contamination and no, or extremely low, chlorine.
Temporary watermains are particularly sensitive as they are above ground
systems influenced by the water heating up in warmer temperatures. This may
cause the potential for bacteriological growth. Due to the sensitive nature, all
temporary watermains are sampled on an increased schedule (every 2 weeks at
multiple locations). The additional challenge with temporary watermains is the
sample port is located outside and subject to unsanitary conditions. Although
efforts are made with the design of the ports to prevent contamination, sampling
is not completed under ideal sanitary circumstances. The general nature of
reconstruction
are more reflective of what is on the sampling tap, rather than what is in the
2 - 2
water. Every positive result is reportable and resampling must occur in
accordance with regulations. When the resamples are clear, it is an indication
that the issue was with the sampling port, not in the water.
The presence of total coliform on a test does not necessarily mean the water is
unsafe to drink. Coliform bacteria can be found in many different environments.
There are several different types of strains of coliform bacteria. Most are
-causing organisms, and their
detection would prompt further investigation and/or corrective action. It is
different than E.coli which is a bacteria only associated with human or animal
faecal matter.
When total coliform is found, aresample using a different technique, which
provides a number of total coliforms to analyze in consultation with Public Health
and the MOECC. Based on a risk assessment of a number of factors including:
the coliform count, chlorine residuals, upstream/downstream coliform counts, the
requirement for a boil water advisory is determined.
There were two precautionary self-imposed (2) Boil Water Advisories in 2017.
One was due to a contractor hitting a private water service during private side
sewer lateral work and potentially contaminating it with sewage. The second was
due to construction and dead ends in the area. The sample results showed no
contamination.
Lead testing sampling programs were completed in February/March and
September/ October 2017.There were 2 locations with lead exceedances in the
plumbing system and 2 hydrants in the distribution system (4 related AWQIs).
The hydrant with repeated high values was replaced and the follow-up sample
was free of lead. The City is not obligated to complete any additional corrective
actions other than reporting, unless directed by the Medical Officer of Health for
the residential plumbing exceedances.
A summary of the quantities of the water supplied by the Regional Municipality of
Waterloo during the period covered by the report is noted on the attached
Table 2.
Table 1 Adverse Water Quality Incident Summary
January 1 to December 31, 2017
NumberAdverse TypeAdverse AWQI #Site NameSite Location
Date
1Low chlorineJanuary 27132325Hydrant 8467Blair Creek Dr
2Low chlorineJanuary 301323411516 Glasgow St
3Total Coliform March 14132638Temporary Charles and
PresentmainPreston
4LeadMarch 20132701Hydrant 1276116 Conway
5Total Coliform May 12133061Temporary 290 Belmont
Presentmain
6Total Coliform May 23133137Temporary 290 Belmont
Presentwatermain
7Total coliform June 6133280Temporary 445 Karn
presentwatermain
8Self imposed June 14133383153 Simeon
2 - 3
Table 1 Adverse Water Quality Incident Summary
January 1 to December 31, 2017
NumberAdverse TypeAdverse AWQI #Site NameSite Location
Date
BWA June 14-
15 (water
service
damaged
during sewer
repair_
9Total Coliform June 21133514Temporary 37 Hugo
presentwatermain
10Low chlorineJune 30133715618 Bridge St E
11Low chlorineJuly 12134029KID14935 Frederick
12Low chlorineJuly 31134787KID551 Ardelt
13Low chlorineAug 11135209KID14935 Frederick
14Low chlorineAug 15135478KID551 Ardelt
15Low chlorineAug 17135591KID40501 Krug
16Total Coliform Aug 16135606226 Krug
present
Self imposed
BWA Aug 17-
196 units
construction
related
17Low chlorineAug 29136040KID551 Ardelt
18Low chlorineAug 31136213KID40501Krug
19Low chlorineSept 8136482KID854574 King St E
20Low chlorine Sept 11136597KID551 Ardelt
21LeadSept 22136819Hydrant 241148 Margaret
22LeadSept 28136844Hydrant 241148 Margaret
23Low chlorine Sept 25136845KID551 Ardelt
24LeadSept 27136896Hydrant 241 148 Margaret
hydrant was
removed and
replaced,
resample clear
25Total Coliform Sept 27136917Temporary 364 Krug
presentwatermain
26Low chlorineOct 5137060KID854574 King St E
27Low chlorineOct 5137075KID14935 Frederick
28Low chlorineOct 11137195Hydrant 109064 Monterey Rd
29Low chlorineOct 12137210Hydrant 253343 Crestview
30Low chlorineOct 13137252KID40501 Krug
31Total Coliform Oct 13137271Temporary 280 Lorne
presentmain
32Low chlorineOct 23137510KID551 Ardelt
33Low chlorineNov 2137767KID854574 King St E
34Low chlorineDec 5138244Hydrant 519632 Victoria St N
35Low chlorineDec 14138366KID854574 King St E
2 - 4
Table 2 -Kitchener Distribution System
Volume of Water Conveyed from the Region of Waterloo Supply System
Variance
2017 2017 from
Monthly Average 2016 Monthly Previous
MonthTotal (m3)Day (m3)Total (m3)Year
January1,726,23955,6461,770,033-2.5%
February1,526,75254,5271,636,370-6.7%
March1,674,66354,0211,689,724-0.9%
April1,643,02754,7681,688,358-2.7%
May1,766,21156,9751,891,735-6.6%
June1,859,95361,9982,050,493-9.3%
July1,863,53860,1142,092,658-10.9%
August1,802,44158,1431,933,457-6.8%
September1,818,40060,6131,810,0450.5%
October1,751,77556,5091,736,8680.9%
November1,656,74755,2251,600,0643.5%
December1,699,39354,8191,673,0131.6%
Total20,789,13921,572,818-3.6%
Notes:
Volume information taken from invoices submitted by
the RegionalMunicipality of Waterloo
ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN:
vision through the delivery of core service.
The Annual Summary Water Report relates to the Foundation Plan Efficient and
Effective Government Proactively communicate with
Kitchener residents in an effort to share information; educate and engage the public,
and promote enterprises, programs and services; to create a corporate culture where
FINANCIAL IMPLICATIONS:
None.
COMMUNITY ENGAGEMENT:
INFORM n
advance of the council / committee meeting.
The Ministry of the Environment and Climate Change and the Regional Municipality of
conditions within the system.
Under Schedule 22 of O.Reg. 170/03, the City of Kitchener is required to provide a copy
of their Summary Report to each Municipality to which it supplies water, namely the
Township of Woolwich and the City of Waterloo.
2 - 5
A similar report - The City of Kitchener Water Distribution Annual Report is provided
electronically on the Kitchener Utilities website, and hard copy is available at the
Kitchener Operations Facility (131 Goodrich Drive). Residents are informed via a
newspaper ad.
ACKNOWLEDGED BY: Cynthia Fletcher, Interim Executive Director, Infrastructure
Services Department
2 - 6
REPORT TO: Community and Infrastructure Services Committee
DATE OF MEETING: March 5, 2018
SUBMITTED BY: Ken Carmichael, Interim Director of Transportation Services,
519-741-2200, ext. 7372
PREPARED BY: Steven Ryder,Traffic Technologist, 519-741-2200, ext. 7152
WARD(S) INVOLVED: Ward 7
DATE OF REPORT: February 5, 2018
REPORT NO.: INS-18-011
SUBJECT: On-Street Parking Regulations Yellow Birch Drive
___________________________________________________________________________
RECOMMENDATIONS:
That parking be prohibited at any time on the east (odd numbered) side of yellow
Birch Drive from Ira Needles Boulevard to a point approximately 155 metres north
thereof; and further,
That the Uniform Traffic Bylaw be amended accordingly;
BACKGROUND:
Yellow Birch Drive is a minor neighbourhood collector roadway with primarily residential
land use and parkland.In response to concerns related to sightlines along the curvature
of Yellow Birch Drive, unsafe two-way operations and restricted access to residential
driveways, the existing on-street parking regulations were reviewed.
Currently, on-street parking is permitted on the both sides of Yellow Birch Drive from Ira
Needles Boulevard to Golden Meadow Drive for a maximum period of three consecutive
hoursas outlined in the City of Kitchener Uniform Traffic Bylaw No. 2007-038.
REPORT:
Residents of Yellow Birch Drive were surveyed regarding a proposal to remove on-
street parking along the east (odd-numbered) side of Yellow Birch Drivefrom Ira
Needles Boulevard to a point approximately 155 metres north thereof to address
concerns related to visibility, access and overall road user safety. A survey letter was
mailed out in December 2017. The results of the survey are as follows:
Prohibit parking at any time on the east (odd-7votes (64% of 11votes)
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
3 - 1
numbered) side of Yellow Birch DrivefromIra
Needles Boulevard to a point approximately 155
metres norththereof.
In favour of keeping the current regulations in 4votes(36% of 11votes)
place:
TOTAL: 11out of 17 responded (65% response rate)
Based on the results of this survey, Transportation Services is recommending that the
current on-street parking regulations on Yellow Birch Drive be amended to prohibit
parking on the east (odd-numbered) side of Yellow Birch Drive from Ira Needles
Boulevard to a point approximately 155 metres north thereof.
ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN:
The recommendation of this report supports the achievement of the c
vision through the delivery of core service.
FINANCIAL IMPLICATIONS:
The approximate cost for implementing Parking signage along Yellow Birch Drive is
$750 and will be taken from the existing sign maintenance budget.
COMMUNITY ENGAGEMENT:
INFORM The residents were made aware of this report via a letter through the mail.
This report has been posted to the ciadvance of the
council / committee meeting.
CONSULT Directly affected residents were surveyed regarding the proposed parking
regulation change in December 2017.
ACKNOWLEDGED BY: Justin Readman,Interim Executive Director
Infrastructure Services Department
Attached:
Appendix A Key Map Yellow Birch Drive Proposed On-Street Parking Regulations
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
3 - 2
Key Map
Yellow Birch Drive Proposed On-Street Parking Regulations
\[ĻŭĻƓķʹ
Existing Three (3) Hour Parking to Remain
Properties Notified
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
3 - 3
REPORT TO: Community and Infrastructure Services Committee
DATE OF MEETING: March 5, 2018
SUBMITTED BY: Ken Carmichael,Interim Director Transportation Services 519-
741-2200 x7372
PREPARED BY: Aaron McCrimmon-Jones,Transportation Planning Project
Manager, 519-741-2200 x7153
WARD(S) INVOLVED: Ward 3
DATE OF REPORT: February 9, 2018
REPORT NO.: INS-18-008
SUBJECT: Fallowfield Drive Traffic Calming Review
___________________________________________________________________________
RECOMMENDATIONS:
That an intersection narrowing be installed on Fallowfield Drive at Britton Place;
That an intersection narrowing be installed on Fallowfield Drive at Joshua Street;
That an intersection narrowing be installed on Fallowfield Drive at Brisbane Drive;
That a roadway narrowing be installed on Fallowfield Drive from Brisbane Drive
extending approximately 60 meters south thereof;
That a raised narrowing be installed on Fallowfield Drive approximately 40 meters south
of Brisbane Drive;
That an intersection narrowing be installed on Fallowfield Drive at Anastasia Place,
further;
That amedian island with pedestrian refuge be installed on Fallowfield Drive
approximately 127 meters south of Fallview Street;
BACKGROUND:
Traffic volume and speeding are significant safety related issues frequently raised by residents
of affected neighbourhoods in the City of Kitchener. In response to these issues, Council
reviewed, updated and subsequently Traffic Calming Policy in 2014 and
established an annual budget to address traffic management issues in residential
neighbourhoods. The traffic calming policy outlines a number of evaluation criteria that provide a
fair and consistent review of streets and communities, while defining and prioritizing the
individual streets and/or communities that are most in need of traffic calming from a traffic safety
perspective.
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
4 - 1
In March 2017,through report INS-17-015, Council approved Fallowfield Drive for a formal
traffic calming review.
REPORT:
InMarch 2017, Transportation Services initiated a formal traffic calming review for Fallowfield
Drive by means of an initiation survey, the results of which indicated sufficient resident support
to proceed. APublic Information Centre (PIC) was held in June 2017 to discuss the traffic
calming review process along with the current traffic conditions, potential traffic calming
measures and receive resident input.A subsequent PIC was held in November 2017 to review
resident feedback, alternative design options, including the advantages and disadvantages of
each alternative and present the preferred design alternative as determined by the traffic
calming steering committee.
In January 2018, Transportation Services staff mailed a final survey to all affected residents
along Fallowfield Drive and the surrounding neighbourhood. The intent of the survey was to
determine if there is sufficient support for the implementation of the recommended traffic
calming measures, which include: three intersection narrowings, oneroadway narrowing, one
raised narrowing and one median island with pedestrian refuge. As per the City of Kitchener
Traffic Calming policy, a minimum of 50% of directly affected residents must respond to the
survey and 60% of the respondents must support the recommended plan for staff to
recommend installation of the proposed measures.
There were a total of 1,004 addresses surveyed within the boundaries of the study area.This
includes 695 addresses located in the four apartment buildings at 101, 121, 141 and 161
Fallowfield Drive. The results of this survey are as follows:
Total SurveyedTotal ResponsesYesNo
Houses (detached & towns)309785820
Apartment building#101208372611
Apartment building#12116231256
Apartment building#141162322210
Apartment building#161163372710
TOTAL100421515857
Total Participation Summary
In favour of installing the proposed traffic calming measures:158(73%)
Opposed to installing the proposed traffic calming measures:57 (27%)
TOTAL responsesreceived,of 1004 surveyed:215(21%)
Based on the results above, the Fallowfield Drive traffic calming review met the required
minimum of support in that more than 60% of respondents indicated support of the
recommended plan. However, Fallowfield Drive did not meet the minimum 50% response rate
of affected residents. Because the survey distribution area included 1,004 addresses, achieving
response rate of 50%,would require a minimum 502 responses.
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
4 - 2
To account for the large survey distribution a separate analysis was done specifically for houses
with frontage on Fallowfield Drive. The following numbers are included in the overall results
provided above, but summarized below to demonstrate input received from residents more
directly impacted by traffic on Fallowfield Drive, given close proximity and direct access.
Fallowfield DriveParticipation Summary(Directly Affected Homes)
In favour of installing the proposed traffic calming measures:19(79%)
Opposed to installing the proposed traffic calming measures:5(21%)
TOTAL responsesreceived,of 79surveyedon Fallowfield Drive:24(29%)
Although the minimum participation rate was not achieved, there is strong support to implement
the proposed traffic calming measures amongst those who responded to the survey. Based on
the indicated support, Transportation Services recommends that the proposed traffic calming
plan be implemented. The recommended changes would ultimately create a safer environment
for all road users.
ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN:
Strategic Priority:3:Safe and Thriving Neighbourhoods.
Strategy:3:2Create safer streets in our neighbourhoods through new
traffic calming approaches.
Strategic Action:NB39 Traffic Calming
FINANCIAL IMPLICATIONS:
The total cost of implementing the traffic calming plan is approximately $80,000 and will be
taken from the traffic calming capital budget account.
COMMUNITY ENGAGEMENT:
INFORM Residents of Fallowfield Drive and the surrounding neighbourhood have received
ongoing information regarding this traffic calming review since March 2017.Notification of PIC
dates were provided via mail out letter and road signage. Information packages were distributed
at. The information packages highlighted key topics discussed and included
questionnaires for feedback. Presentation materials from both PICs, including the information
packages, were made
committee meeting.
CONSULT The Fallowfield Drive traffic calming review was initiated when an initiation survey
mailed out in March 2017. T were held in June 2017 and November 2017 to gain
input at key stages of the traffic calming review process, including feedback on the proposed
preferred solution. In January 2018, Transportation Services staff mailed out a final survey to all
affected residents along Fallowfield Drive and the surrounding neighbourhood to determine
support for the preferred plan.
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
4 - 3
ACKNOWLEDGED BY: Justin Readman, Interim Executive Director,
Infrastructure Services Department
Attached:
Appendix A Fallowfield Drive Recommended Traffic Calming Plan
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
4 - 4
Appendix A Fallowfield Drive Recommended Traffic Calming Plan
1)
2)
FALLOWFIELD PARK
3)
5)
4)
6)
7)
1)Intersection narrowing on Fallowfield Drive at Britton Place;
2)Intersection narrowing on Fallowfield Drive at Joshua Street;
3)Intersection narrowing on Fallowfield Drive at Brisbane Drive;
4)Roadway narrowing on Fallowfield Drivefrom Brisbane Drive extending approximately 60
meters south thereof;
5)Raised narrowing on Fallowfield Drive approximately 40 meters south of Brisbane Drive
(located at the Balzer Creek Trail);
6)Intersection narrowing at Anastasia Place and Fallowfield Drive;
7)Median island with pedestrian refuge on Fallowfield Drive approximately 127 meters south of
Fallview Street.
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
4 - 5
REPORT TO: Community and Infrastructure Services Committee
DATE OF MEETING: March 5, 2018
SUBMITTED BY: Ken Carmichael,Interim Director Transportation Services
(519)741-2200 x7372
PREPARED BY: Steven Ryder, Traffic Technologist,(519)741-2200 x7152
WARD(S) INVOLVED: Ward 5
DATE OF REPORT: February 8, 2018
REPORT NO.: INS-18-009
SUBJECT: Parkvale Drive Traffic Calming Review
___________________________________________________________________________
RECOMMENDATIONS:
That a raised, mid-block narrowing be installed in the location of the hydro corridor trail
crossing between Parkvale Court and Bianca Court;
That parking be prohibited in the immediate vicinity of the raised, mid-block narrowing;
That an intersection narrowing be installed at Parkvale Drive and Woodbine Avenue
(north intersection);
That a left turn lane be added to the existing lane configuration of Parkvale Drive at
Huron Road;
That stopping be prohibited during school times along the north/west side of Parkvale
Drive between Parkvale Court and the hydro corridor trail crossing; and further,
That the Uniform Traffic By-Law be amended accordingly.
BACKGROUND:
Traffic volume and speeding are significant safety related issues frequently raised by residents
of affected neighbourhoods in the City of Kitchener. In response to these issues, Council
reviewed, updated and subsequently Traffic Calming Policy in 2014 and
established an annual budget to address traffic management issues in residential
neighbourhoods. The traffic calming policy outlines a number of evaluation criteria that provide a
fair and consistent review of streets and communities, while defining and prioritizing the
individual streets and/or communities that are most in need of traffic calming from a traffic safety
perspective.
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
5 - 1
In June 2015, Council approved report INS-15-040Traffic Calming Priority - 2015in which
staff recommended that a traffic calming review be conducted for Parkvale Drive.
REPORT:
InSeptember 2015, Transportation Services initiated a traffic calming review for Parkvale Drive
through a survey mailed to directly affected residents. Staff also proceeded with an introductory
Public Information Centre (PIC) that was held in October 2016. The intent of this PIC was to
discuss the traffic calming review process, the current traffic conditions of the roadway, and
potential traffic calming measures. A subsequent PIC was held after receiving feedback from
residents through the first PIC. The intent of the second PIC was to review the summarized
resident feedback, provide alternative design options, including the advantages and
disadvantages of each alternative, and present the preferred design option as determined by
the traffic calming steering committee.
Grand River Transit was consulted regarding the proposed locations and type of traffic calming
measures, andconfirmed that generally they had no concerns, but asked that the raised
crosswalk be located so as not to impede the bus stop operation that is within the limits of the
proposed raised crossing. This has been accommodated through the traffic calming design.
Kitchener Fire was also consulted regarding the proposed traffic calming plans and stated that
they have no concerns.
In January 2018, Transportation Services staff mailed a final survey to all affected area
residents along Parkvale Drive. The intent of the survey was to determine if there is sufficient
support for the implementation of the recommended traffic calming measures. As per the City of
Kitchener Traffic Calming policy, a minimum of 50% of directly affected residents must respond
to the survey and 60% of the respondents must support the recommended plan for staff to
recommend installation of the proposed measures.
There were a total of 184 directly affected properties surveyed within the boundaries of the
study area. The results of this survey are as follows:
Residents in favour of the recommended plan: 41 (87% of 47 votes)
Residents opposed to the recommended plan: 6 (13% of 47 votes)
Total 47 responded out of 184(26%)
Although the minimum participation rate was not achieved, there is strong support to implement
the proposed traffic calming measures amongst those who responded to the survey. Based on
the indicated support, Transportation Services recommends that the proposed traffic calming
plan be implemented. The recommended changes would ultimately create a safer environment
for all road users, however will result in the loss of approximately 6-8 on-street parking spaces.
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
5 - 2
ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN:
Strategic Priority:3:Safe and Thriving Neighbourhoods.
Strategy:3:2Create safer streets in our neighbourhoods through new
traffic calming approaches.
Strategic Action:NB39 Traffic Calming
FINANCIAL IMPLICATIONS:
The total cost of implementing the traffic calming plan is approximately $40,000 and will be
taken from the Traffic Calming capital budget account.
COMMUNITY ENGAGEMENT:
INFORM Directly affected residents of the Parkvale Drive traffic calming review have received
information and communication regarding this review since September 2015. Notification of both
Public Information Centres was provided through mail and project signage. Information
packages were distributed at both PICs which highlighted key topics discussed and included
questionnaires for feedback. Presentation materials, including the information packages, were
also
CONSULT The Parkvale Drive traffic calming review began with an initiation survey in
September 2015. Two (2) Public Information Centres were held to gain input at key stages of
the traffic calming review process, including feedback on the preferred solution. In February
2018, Transportation Services staff mailed a final survey to all affected residents along Parkvale
Drive and the surrounding neighbourhood to determine support for the preferred plan.
ACKNOWLEDGED BY: Justin Readman, Interim Executive Director,
Infrastructure Services Department
Attached:
Appendix A Traffic Calming Plan
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
5 - 3
Appendix A: Traffic Calming Plan
Parkvale Drive Woodbine Avenue to Huron Road
3)
2) 3)
1)
5)
4)
3)
1) Stopping prohibitions during school times on north side of Parkvale
Drive between Parkvale Court and the hydro corridor trail crossing;
2) Raised, mid-block narrowing located at hydro corridor trail crossing;
3) New pavement markings along curves on Parkvale Drive;
4) Intersection narrowing at Parkvale Drive and Woodbine Avenue;
5) New left turn lane on Parkvale Drive to enter Huron Road.
- Study boundary
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
5 - 4
REPORT TO: Community and Infrastructure Services Committee
DATE OF MEETING: March 5, 2018
SUBMITTED BY: Ken Carmichael,Interim Director Transportation Services
(519)741-2200 x7372
PREPARED BY: Steven Ryder, Traffic Technologist,(519)741-2200 x7152
WARD(S) INVOLVED: Ward 2
DATE OF REPORT: February 8, 2018
REPORT NO.: INS-18-010
SUBJECT: Sims Estate Drive Traffic Calming Review
___________________________________________________________________________
RECOMMENDATIONS:
That a painted mid-block narrowing be implemented on Sims Estate Drive between #103
and #111 Sims Estate Drive;
That intersection narrowings be installed on Sims Estate Drive at Desmond Street,
Morrison Road and William Lewis Street;
That speed humps be installed on Sims Estate Drive at Waterbend Crescent and
Tremaine Drive;
That parking be prohibited on both sides along Sims Estate Drive in the immediate area
of all traffic calming measures; and further,
That the Uniform Traffic By-Law be amended accordingly.
BACKGROUND:
Traffic volume and speeding are significant safety related issues frequently raised by residents
of affected neighbourhoods in the City of Kitchener. In response to these issues, Council
reviewed, updated and subsequently Traffic Calming Policy in 2014 and
established an annual budget to address traffic management issues in residential
neighbourhoods. The traffic calming policy outlines a number of evaluation criteria that provide a
fair and consistent review of streets and communities, while defining and prioritizing the
individual streets and/or communities that are most in need of traffic calming from a traffic safety
perspective.
In March 2016, Council approved report INS-16-020Traffic Calming Priority - 2016in which
staff recommended that a traffic calming review be conducted for Sims Estate Drive.
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
6 - 1
REPORT:
In January 2017, Transportation Services initiated a traffic calming review for Sims Estate Drive
through a survey mailed to directly affected residents. The survey resulted in proceeding with a
Public Information Centre (PIC) that was held in May 2017. The intent of this PIC was to discuss
the traffic calming review process, the current traffic conditions of the roadway, and potential
traffic calming measures. A subsequent PIC was held in November 2017 after receiving
feedback from residents through the first PIC. The intent of the second PIC was to review the
summarized resident feedback, provide alternative design options, including the advantages
and disadvantages of each alternative, and present the preferred design option as determined
by the traffic calming steering committee.
Grand River Transit was consulted regarding the proposed traffic calming plan and stated that
while Sims Estate Drive is identified as a potential transit route, there are currently no plans for
a route to be implemented and thus they have no concerns.
Kitchener Fire was consulted regarding the proposed traffic calming plan and has no concerns.
In January 2018, Transportation Services staff mailed a final survey to all affected area
residents along Sims Estate Drive. The intent of the survey was to determine if there is sufficient
support for the implementation of the recommended traffic calming measures. As per the City of
Kitchener Traffic Calming policy, a minimum of 50% of directly affected residents must respond
to the survey and 60% of the respondents must support the recommended plan for staff to
recommend installation of the proposed measures.
There were a total of properties surveyed within the boundaries of the study area. The results
of this survey are as follows:
Residents in favour of the recommended plan: 27(82% of 33 votes)
Residents opposed to the recommended plan: 6(18% of 33 votes)
Total 33 responded out of 116 (28%)
Although the minimum participation rate was not achieved, there is strong support to implement
the proposed traffic calming measures amongst those who responded to the survey. Based on
the indicated support, Transportation Services recommends that the proposed traffic calming
plan be implemented. The recommended changes would ultimately create a safer environment
for all road users, however will result in the loss of approximately 10-12 on-street parking
spaces where the traffic calming measures are proposed.
ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN:
Strategic Priority:3:Safe and Thriving Neighbourhoods.
Strategy:3:2Create safer streets in our neighbourhoods through new
traffic calming approaches.
Strategic Action:NB39 Traffic Calming
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
6 - 2
FINANCIAL IMPLICATIONS:
The total cost of implementing the traffic calming plan is approximately $55,000 and will be
taken from Transportation Services Traffic Calming capital budget account.
COMMUNITY ENGAGEMENT:
INFORM Directly affected residents of the Sims Estate Drive traffic calming review have
received information regarding this review since January 2017. Notification of both Public
Information Centres was provided through mail out and road signage. Information packages
were distributed at both PICs which highlighted key topics discussed and included
questionnaires for feedback. Presentation materials, including the information packages, were
website after the conclusion of each PIC.
CONSULT The Sims Estate Drive traffic calming review began when an initiation survey was
mailed out in January 2017. Two (2) Public Information Centres were held to gain input at key
stages of the traffic calming review process, including feedback on the proposed preferred
solution. In February 2018, Transportation Services staff mailed out a final survey to all affected
residents along Sims Estate Drive and the surrounding neighbourhood to determine support for
the preferred plan.
ACKNOWLEDGED BY: Justin Readman, Interim Executive Director,
Infrastructure Services Department
Attached:
Appendix A Traffic Calming Plan
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
6 - 3
Appendix A: Traffic Calming Plan
Sims Estate Drive Fairway Road North to Tremaine Drive
6)
5)
4)
1)
2) 3)
1) Painted mid-block narrowing along curvature of Sims Estate Drive;
2) Intersection narrowing at Sims Estate Drive and Desmond Street;
3) Intersection narrowing at Sims Estate Drive and Morrison Road;
4) Speed hump at Sims Estate Drive and Waterbend Crescent;
5) Intersection narrowing at Sims Estate Drive and William Lewis Street;
6) Speed hump at Sims Estate Drive and Tremaine Drive.
- Study Boundary
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
6 - 4
REPORT TO: Community and Infrastructure Services Committee
DATE OF MEETING: March 5, 2018
SUBMITTED BY: Mark Hildebrand, Director Community Programs and Services,
519-741-2200 ext. 7687
PREPARED BY: Mark Hildebrand, Director Community Programs and Services,
519-741-2200 ext. 7687
WARD(S) INVOLVED: Ward 4 and 5
DATE OF REPORT: February 19, 2018
REPORT NO.: CSD-18-047
SUBJECT: Facility Partnership with the Waterloo Region District School
Board in the Huron - Brigadoon area
___________________________________________________________________
RECOMMENDATION:
for its future Tartan Avenue property to determine the feasibility of building a
joint school,community centre, child care and EarlyON family and child centre on
the property, and
That staff report back to a future meeting of the Community and Infrastructure
Services Committee with the results of the site fit study, including options for
funding community centre space, if results of the site fit show a community
centre can fit on the site.
EXECUTIVE SUMMARY:
As part of the Council approved business plan (2016), staff was directed to investigate
and report back on a potential partnership opportunity for a joint school and community
centre in the Huron - Brigadoon community. An opportunity exists with theWaterloo
Region District School Board (WRDSB) to investigate a joint facility that would provide
the City with approximately 8,000 square feet of community centre space, attached to a
school child care and EarlyON family and child centre.Benefits of building this
community space in partnership with WRDSB include: i) possible savings on
construction costs; ii) the ability to leverage additional space (double gymnasium) for
community use after school hours, and iii) having community space available in the
Huron - Brigadoon area (which will grow significantly in the coming years) as early as
2020. This also satisfies current Provincial Places to Grow legislation that expects
public service facilities and public services to be co-located in community hubs and
integrated to promote cost-effectiveness, and for municipalities to collaborate and
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
7 - 1
consult with service planning, funding and delivery sectors to facilitate the coordination
and planning of community hubs and other public service facilities.
The 2013 Leisure Facilities Master Plan Update did not consider building a community
centre in the Huron area and was therefore not recommended at that time. As a result,
this community space is not funded in the 10 year capital forecast and if pursued,
funding sources would have to be identified. Staff believes that a community centre in
the Huron - Brigadoon area will be identified as a need in the 2019 Leisure Facilities
Master Plan update.However, the WRDSB is interested in beginning detailed design at
this facility around April 2018 in order to meet their timelines for construction of a new
school in the area. As a result, if the City is interested in building a joint facility with
them, it cannot wait until the outcome of the next LFMP update, which will not come
before Council until early to mid 2019.
REPORT:
On February 13, 2017, the Community and Infrastructure Services Committee
considered CSD-17-013 and directed staff to investigate a potential partnership
opportunity with the Waterloo Region Catholic School Board (WCDSB) for a joint school
and community centre in the Huron-Brigadoon community. CSD-17-013 also indicated
that if 8,000 square feet could not be accommodated on the Catholic board site, staff
would make the same enquiry with the public school board,related to their property in
the area (further east).
WCDSB was contacted to investigate the possibility of adding approximately 8,000
square feet of space to their school at the Huron-Brigadoon site. Although the Board
was interested in a potential partnership, they determined that their site was too small to
accommodate the school, afamily and child centre, as well as a community center.
Staff also met with the Waterloo Regional District School Board (WRDSB) to investigate
the possibility of adding an 8,000 square foot community centre to the school at the
proposed Tartan Avenue site. WRDSB is proposing an elementary school, with classes
from Junior Kindergarten to Grade 8, with the capacity of 591 students.Only recently
(January 2018) has funding from the Province for this school been announced.
Like the initial request to the Catholic School Board, theCity specified an interest in the
following dedicated spaces at the facility including:
A Single Gymnasium
A Multipurpose Room
Mid-sized Program Room
Appropriate dedicated storage for each room
Appropriate office spaces for staff, neighbourhood association and possible
partners
Dedicated lobby area and amenities.
WRDSB has treated this interest from the City as a priority request for a partnership,
along with the child care and EarlyON family and child centre,proposed at this site.
7 - 2
Partnership Benefits
Staff believes that considering a partnership with WRDSB at this site has significant
benefits for the City and the surrounding neighbourhoods. The Board also recognizes
that cooperative and collaborative relationships between school boards and other
organizations are part of the foundation of a strong, vibrant and sustainable education
system. The two organizations recognize that facility partnerships can strengthen the
role of schools in communities, providing a place for programs and facilitating the
coordination of, and improving access to, services for the wider community.
The City already partners with both school boards in the joint use of facilities in our
community. For example, in the aquatics section, the City of Kitchener manages the
programs at Cameron Heights pool, which is part of the existing high school. Also,
Forest Heights Pool and the Kitchener Public Library are attached to Forest Heights
Collegiate Institute.Grand River Collegiate Institute similarly houses a Kitchener Public
Library that is in a long-term lease with the Board. A City arena shares the campus of
that school as well as oneat Kitchener-Waterloo Collegiate Institute. In the Community
Centre section, Stanley Park Community Centre shares a triple gymnasium with St.
Anthony Daniels School. Finally, the Downtown Community Centre shares a facility
with the Catholic District School Board administration offices.Entering into these types
of partnerships permits school access to community programming, cost sharing
opportunities for facility maintenance and capital projects, and access to additional
spaces that otherwise would not be available to each partner.
Entertaining this partnership would allow the City of Kitchener and WRDSB to share
construction costs in a cooperative build. Although final cost per square foot has to be
confirmed by the Ministry of Education, the estimated cost for 8,000 square feet of
program space to the City, considering the
requirements,would be approximately $2,900,000. The estimate includes construction
costs, architect fees, furniture fixtures and equipment, a 20% contingency (please note
, and
harmonized sales tax.
For the same amount of area, if theCity were to build a stand-alone facility without the
school board, it is estimated that it would cost approximately $4,125,000. The following
factors contribute to the difference between the construction costs:
There are inherent economies of scale on the larger construction associated with
building schools, compared to community centres,
The board often uses a cloned footprint model for schools, so essentially they are
building similar designs on different sites, whereas the City does custom designs
for each facility,
Finishes and fixtures (e.g. millwork) is different at Community Centres than at
schools,
Additional costs are incurred as City of Kitchener also include a percent for art
component, and
7 - 3
City of Kitchener looks to build to LEED specifications which can add 5-10% to
the cost of a project
In addition to sharing construction costs in a cooperative build, the benefits associated
with this partnership include the following:
1) Although the City would pay for 8,000 square feet of dedicated space, as a
partner in the school, we would likely be able to leverage our partnership to
ensure the community would also have access to additional space outside of
school operating hours, most significantly a double gymnasium.In essence,
during hours after school, the community could have access to 3 gymnasiums
(the size of Stanley Park).
It should be noted that any joint use of space would have to be negotiated
between the School Board, the EarlyON centre and City of Kitchener, and that
the site fit study does not guarantee commitment by either party until these items
have been resolved.
2) Creating community space on this site would allow the City to provide dedicated
space to the surrounding neighbourhoods and residents much sooner than we
would otherwise be able to.
The Rosenberg Secondary Plan for this area has already identified a community
centre for the mixed use area south of Huron Road and east of Fischer Hallman
Road (around this area). Also, the attached map (Appendix A) also shows a gap
in service / community centre coverage in this area (shown by the blue circle).
The proposed facility would service a population of approximately 10,900 people
currently;12,300 people in 10 years and growing to approximately 37,375 people
when the community is completely built out. This facility would be similar in size
to Centreville Chicopee Community Centre.
Partnering with the WRDSB could see this space opened and serving the
community by 2020. It typically takes around 18 months to 2 years to have a
school designed, tendered and constructed. As such, if the City of Kitchener is
interested in partnering at this site, WRDSB will require a firm commitment by
April 2018.
Site Fit Study
As indicated above, this site is also funded for a child care and EarlyON family and child
centre and therefore the school board is recommending that a site fit study be
completed prior to April to validate the ability to proceed with the program and space
requirements suggested for the site. Specifically, a site fit study looks at site constraints
such as topography, site plan requirements (e.g. setbacks, parking), andtests several
building footprints, including parking, accesses, and field layouts to determine best fit. In
this case, where there is the possibility of other partners, the Board will ask that possible
separation of uses in the building also be considered. The building footprint and its size
7 - 4
will be dictated by the minimum number of uses requiring ground floor access. This
traditionally includes childcare, gym, administration and kindergarten spaces, and also
libraries. It could include other uses however, considering the needs of the partners.
Timing with LFMP
The usual process that would be followed to make a decision regarding the construction
of a community facility of this type includes:
completing the Leisure Facilities Master Plan Update, which identifies and
prioritizes future indoor and outdoor recreation facilities across the City.
Incorporating the results of that prioritization for future investment in recreation
facilities
(scheduled for completion in the second quarter of 2019).
(which would include this facility) as part of the 2020 budget process (which
would be completed in early 2020).
This means that the usual process would not be completed until well past the WRDS
deadline for us to make a decision on this potential shared facility.
Despite not having the benefit of this usual process, staff is recommending the City
pursue this joint facility at this time in order to take advantage of the partnership
opportunity. Staff is confident that given growth projections and community need in the
area, additional community space in this area would be a recommendation of the next
LFMP.
ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN:
Strategic Priority: Safe and Thriving Neighbourhoods
Strategy: 3.6 Provide opportunities and support for citizens to lead the way
in
health, happiness and well-being by capitalizing on local community
assets such as community centres, pools, arenas, libraries, parks,
trails and other public spaces.
Strategic Action: # NB14 Huron Woods Community Centre Partnership
Explore the potential for a partnership with the school board for the
development of a community centre in the Huron Woods
Neighbourhood.
7 - 5
FINANCIAL IMPLICATIONS:
Considering its current needs,the cost for 8,000 square feet of program space for The
City of Kitchener, if built in conjunction with the school, would be approximately
$2,900,000.
The WRDSB has asked the City to contribute 50 percent of the costs associated with
the site fit study, which are not expected to exceed $10,000.
Staff are recommending to report back to the April 30, 2018 Community and
Infrastructure Services meeting with funding options if the results of the site fit study
show that acommunity centre can fit with the school, child care and EarlyONfamily and
child centre on the site.
COMMUNITY ENGAGEMENT:
INFORM
advance of the council / committee meeting.
ACKNOWLEDGED BY: Michael May, Deputy CAO Community Services
7 - 6
Appendix A
7 - 7
REPORT TO: Community & Infrastructure Services
DATE OF MEETING: March 5, 2018
SUBMITTED BY: Greg St. Louis, Director, Utilities 519-741-2600 X4538
PREPARED BY: Angela Mick, Utilities Water Engineer, 519-741-2600 X4408
WARD(S) INVOLVED: All
DATE OF REPORT: February 12, 2018
REPORT NO.: INS-18-006
SUBJECT: Drinking Water Quality Management Standard (DWQMS)
Management Review Summary for 2017
___________________________________________________________________________
RECOMMENDATION: For Information.
EXECUTIVE SUMMARY:
The purpose of this report is to inform Council, as the decision-making authority, about
the status of the drinking water system on an annual basis. The Kitchener Water
Distribution System meets the requirements under the Safe Drinking Water Act. There
are specific areas that must be reported on per regulatory requirements which include,
but are not limited to: consumer feedback, results of infrastructure review, results of
audits and summary of maintenance. The attached report provides details of the
Kitchener Drinking Water System 2017.
BACKGROUND:
The Safe Drinking Water Act, 2002 and Regulation 188/07, requires the City of
Some of the licensing requirements include the development and management of a
Quality Management System (QMS) and Operational Plan as well as communication to
the Owner. The City of Kitchener became licensed in August, 2009 with a Financial
Plan submitted in July, 2010. A renewal to the licence was made in February 2014, with
a revised Financial Plan.
Section 19 of the Safe Drinking Water Act imposes a statutory standard of care on
behalf of the municipality, oversees the accredited operating authority of the system or
exercises decision-making au
Council since they have decision-making authority. Part of the standard of care includes
requiring system owners to undertake financial planning and implement the Drinking
Water Quality Management System (DWQMS).
*** This information is available in accessible formats upon request. ***
Please call 519-741-2345 or TTY 1-866-969-9994 for assistance.
IF1 - 1
REPORT:
This report represents the Annual Management Review Summary for 2017 prepared in
results of the management review, the identified deficiencies, decisions and action
A detailed DWQMS Management Review for 2017 is attached.
AManagement Review was completed by Greg St. Louis, Director, Utilities along with
Angela Mick, Utilities Water Engineer and Ras Sonthisay, Quality Management System
Specialist onFebruary 5, 2018 in accordance with the Standard.
Top Management is a person, persons or group of people at the highest
management level within an Operating Authority that makes decisions respecting the
QMS and recommendations to the Owner respecting the subject system or subjects
The Owner of the water utility is the Corporation of the City of Kitchener,
represented by City Council.
ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN:
vision through the delivery of core service.
FINANCIAL IMPLICATIONS:
N/A.
COMMUNITY ENGAGEMENT:
INFORM in
advance of the council / committee meeting.Drinking Water Quality Management Policy
is available on Kitchener Utilities Website.
ACKNOWLEDGED BY: Cynthia Fletcher, Interim Executive Director, Infrastructure
Services Department
IF1 - 2
Kitchener Utilities
City of Kitchener Drinking Water Distribution
System
Drinking Water Quality Management
Standard
Management Review 2017
The contents of this document are the intellectual property of Kitchener Utilities and cannot be reproduced
and/or distributed to any individual or organisation without the written authorization of Kitchener Utilities.
IF1 - 3
City of Kitchener Water Distribution
DWQMS Management Review
TABLE OF CONTENTS
Part A - Introduction .............................................................................................................................. 3
Purpose............................................................................................................................................... 3
Executive Summary ............................................................................................................................. 3
Background ......................................................................................................................................... 4
Other Related Water Quality Reports ................................................................................................. 5
Quality Management System Policy .................................................................................................... 5
Part B Management Review ................................................................................................................ 6
System Description .............................................................................................................................. 6
Water Infrastructure Program .............................................................................................................. 7
Incidents of Regulatory Non Compliance ............................................................................................ 7
Incidences of Adverse Drinking Water ................................................................................................. 8
Deviations from Critical Control Points Limits and Response ............................................................... 9
Effectiveness of the Risk Assessment Process ........................................................................................ 11
Results of Internal and External Audits ............................................................................................... 12
Operational Performance ................................................................................................................... 13
Raw Water Supply and Drinking Water Quality Trends ...................................................................... 13
Follow-up on Action Items from Previous Management Reviews ....................................................... 14
Status of Management Action Items Identified Between Reviews ........................................................ 14
Changes that could Affect the Quality Management System ............................................................... 14
Consumer Feedback ........................................................................................................................... 15
Resources Needed to Maintain the Quality Management System ....................................................... 15
Results of the Infrastructure Review ................................................................................................... 15
Summary of Maintenance .................................................................................................................. 16
Effectiveness of Maintenance .............................................................................................................. 17
Operational Plan Currency, Content and Updates .............................................................................. 18
Staff Suggestions ................................................................................................................................. 18
Other ................................................................................................................................................. 18
Appendix ............................................................................................................................................. 22
IF1 - 4
City of Kitchener Water Distribution
DWQMS Management Review
PART A - INTRODUCTION
Purpose
The purpose of this report is to inform the decision-making authority about the status of the
drinking water system. The Drinking Water Quality Management Standard (DWQMS) under
the Ministry of Environment and Climate Change (MOECC) requires management to review
and evaluate the continuing suitability, adequacy and effectiveness of the Quality Management
System at least once a year and that the results of the management review, identified
deficiencies, decisions and action items are provided to the Owner.
Executive Summary
Highlights of the report are:
The Water Infrastructure Program (WIP) was initiated in spring 2017 which included a
high level review of water maintenance programs and identified gaps including the
resourcing of the maintenance programs
th
160km of watermains cleaned (approx. 1/6 of the City), 1300 valve operated resulted
in 96 fewer discoloured water calls (47) as compared to 2016 (143).
64 valves were replaced under KU direction to address the majority of known broken
valves.
Approximately 1450 valves were proactively operated (20%); the majority were within
the cleaning area and the 2017 reconstruction areas. Although this is below the 30%
target, valve operating numbers have greatly increased since 2016 (4%).
There were 79 watermain breaks in 2017, which is less than the 5-year average of 110.
Completed annual chamber pump outs for those higher risk chambers containing air
reliefs
Electronic access to standard operating procedure and emergency information in the field
via migration to Laserfiche and laptops
Replaced approximately 5,000 aging water meters
Unaccounted for water was 8.9% (under the 10% target)
From 2009 to 2017, experienced an increase in the number of yearly locate requests
from 9,076 to 17,541, with the trend anticipated to continue
Areas of improvement for 2018 are:
Continue to move from reactive to more proactive distribution system maintenance as
per WIP recommendations:
th
o watermain cleaning another 1/6 of the City is scheduled with planning activities
underway
o proactive valve turning and repair within watermain cleaning area
o additional valve chamber inspections and repair
IF1 - 5
City of Kitchener Water Distribution
DWQMS Management Review
Accelerate the backflow prevention program to increase the number of properties
protected:
o migration from existing standalone program to AMANDA in 2018 will allow for
up to date customer information, pull down menus for increased customer
service, decreased administrative burden and greater consistency
Continue with valve replacement program for broken/damaged valves. As more valves
are operated, more valves are found to require replacement.
Continue with meter replacement program (current backlog is approximately 16,000
meters target replacement is 15 years old)
Watermain connections/cut and caps - new requirements for witnessing/reporting was
rolled out January 1, 2018 and will create additional workload
Development of maintenance procedures/agreements with ION/Keolis (for water related
works (planned and emergency response) around the track area
Develop mobile solutions in conjunction with the CityWorks team for field inspections to
minimize data entry and free up resources
Continue development of a mobile solution for reporting watermain breaks to improve
customer communication
Provide an agreement for Council approval for Kitchener to act as the Overall
Responsible Operator (ORO) for dual ownership watermains (watermains that are
jointly owned with the Region). Although the system currently operates this way, an
agreement is required by the MOECC to formalize the arrangement
Background
wners of municipal water
also recommended that the Owners and Operating Authorities of these systems implement a
quality management approach to operations and management. As a result of these
recommendations a Drinking Water Quality Management Standard (DWQMS) under the
was released in October 2006.
Theand , requires the City of Kitchener to be
requirements include the development and management of a Quality Management System
(QMS) and Operational Plan as well as communication to the Owner. The City of Kitchener
became licensed in August, 2009 with a Financial Plan submitted in July, 2010.
Section 19 of the imposes a statutory standard of care on persons who
ho, on behalf of the
municipality, oversees the accredited operating authority of the system or exercises decision-
IF1 - 6
City of Kitchener Water Distribution
DWQMS Management Review
decision-making authority. Part of the standard of care includes requiring system owners to
undertake financial planning and implement a QMS.
Other Related Water Quality Reports
The City of Kitchener Summary Water Report January 1st to December 31st 2017 (INS 18-005)
is a regulatory report provided to Council, which provides a summary of drinking water
including adverse water quality incidences and water volume.
The Kitchener Distribution System prepares an annual summary of the number of tests taken
within the distribution system as well as the range of the results. A copy of this report is
provided on the Kitchener Utilities website.
The Kitchener Distribution System is part of an Integrated Urban System, meaning the Regional
Municipality of Waterloo is responsible for water treatment and the development, operation of
a trunk water network to distribute treated water to Kitchener, Cambridge, Waterloo,
Woolwich and Wilmot. There are a variety of wells (80%), treatment facilities as well as a
Grand River (20%) source. rastructure system is complex,
consisting of numerous supply sources, pressure zones, reservoirs and pumping stations. Ensuring
sufficient pressure and quantities to meet current and planned growth requires a long-term, co-
ordinated strategy. The Region provides annual summaries for each supply and the information
is available on their website with a link from the Kitchener Utilities website.
A portion of Kitchener (River Ridge area) is supplied by the City of Waterloo. Kitchener
supplies water to a small section of Waterloo (Ira Needles area) and water travels through the
Kitchener distribution system to Breslau (Woolwich)
report is available on their website.
Quality Management System Policy
Kitchener Utilities ow
Distribution System. At Kitchener Utilities, we are committed to supplying the City with safe
drinking water. We work together as the City of Kitchener and the Region of Waterloo to keep
water matters top of mind. We are committed to these principles:
1. Quality
Kitchener water is safely treated and regularly tested according to government legislation and
regulations for the consistent delivery of safe, quality drinking water. We are committed to
maintaining and continually improving the Quality Management System, and complying with
applicable legislation.
IF1 - 7
City of Kitchener Water Distribution
DWQMS Management Review
2. Trust
Trust us to look after your water needs by delivering quality water and reliable service.
3. Value
Tap water is the most economical choice.
4. Communication
We will communicate openly with the public concerning matters of drinking water quality.
PART B MANAGEMENT REVIEW
System Description
The scope of the waterworks begins at the point where treated water enters the watermain
from the treatment facilities, and ends at the property lines of the consumers. There is no
storage, chlorine boosting, secondary disinfection or pressure boosting within the control of the
waterworks.
As of the end of 2017, the waterworks consists of approximately:
890.5 km of distribution watermain 760 km Kitchener owned, 25 km Dual owned
(joint ownership between Kitchener and Region) and 105 km Regional owned (22 km is
untreated)
66,110 water meters in service
4,374 hydrants (not including private hydrants)
7,503 valves (not including service valves or hydrant valves) 6,970 Kitchener owned,
137 Dual and 395 Regional
(See Appendix 1 map at end of this document)
The waterworks system has the following permits and licences:
Municipal Drinking Water Licence
Drinking Water Works Permit
Financial Plan
Operational Plan
IF1 - 8
City of Kitchener Water Distribution
DWQMS Management Review
Water Infrastructure Program
The Water Infrastructure Program (WIP) was initiated in spring 2017 to evaluate variables that
influence the water, sanitary sewer and stormwater rates with the intent of providing rate
options for Council consideration and to support the 2018 budget process (INS-17-070). As
related to the DWQMS, the report included a detailed review of the capital program including
analysis of current pipe condition data and estimated life of pipe; detailed review of the
maintenance program including a gap analysis and phase-in strategy to address the gap; and
development of a communication plan.
Key findings as related to DWQMS included:
Estimated pipe life was dependent on material, which influences the replacement
schedule (previous practice was 80 years):
o Cast iron 50 years
o Ductile iron 80 years
o Plastic pipe 100 years
o Other pipe 80 years
Water maintenance program identified a $1.3M annual maintenance gap which included
the following areas:
o Watermain cleaning program
o Valve maintenance and replacement programs
o Cross connection control program
o Hydrant operation and maintenance (minor gap)
o Underground utility locates
Identified the relationship between preventative maintenance and prolonging the life of
assets.
Council supported Option 2, the highlights of Option 2 included:
Address the capital needs gap by 2037
Incorporates maintenance program funding needs over five years (water phase in is
$260,000/year)
2018 combined rate increase of 7%
Action: rates were determined through the budget process
Incidents of Regulatory Non Compliance
A Ministry of Environment and Climate Change (MOECC) inspection was completed February
1-2, 2018 and covered January 1, 2017 to
preparation, the MOECC had not issued their report; preliminary findings did not identify any
issues of non-compliance while the inspector reviewed documentation with the City on
February 1-2.
IF1 - 9
City of Kitchener Water Distribution
DWQMS Management Review
Action: No further action required for information only
Incidences of Adverse Drinking Water
There were 35 Adverse Water Quality Incidences (AWQI) during the year, two of which
resulted in self-imposed Boil Water Advisories (BWA).
The number of low chlorine AWQIs (22) were at repeat locations and were largely due
to broken valves, large diameter watermains (portions of Ottawa St N and Victoria St N)
taken out of service for construction, and other construction which created temporary
dead ends.
The majority of the total coliform AWQIs (8 total) were on temporary watermains and
the resamples were clear
There were 2 locations with lead exceedances in the plumbing system and 2 hydrants in
the distribution system (4 related AWQIs). The hydrant with repeat high values was
replaced and follow-up sample was free of lead. Since less than 10% of samples had lead
exceedances, we can continue to complete a reduced lead sampling program in 2018.
The Summary Water Report January 1st to December 31, 2017 report (INS 18-005)
discusses water quality compliance further
IF1 - 10
City of Kitchener Water Distribution
DWQMS Management Review
Action: No further action required for information only
Deviations from Critical Control Points Limits and Response
There were 79 watermain breaks in 2017, which is less than the 5-year average of 110.
Watermain breaks are weather dependent due to the frost movement with colder
winters resulting in more breaks. Incident debriefs are completed for watermain breaks.
This information helps to determine priorities for replacement due to condition.
IF1 - 11
City of Kitchener Water Distribution
DWQMS Management Review
Water loss for 2017 was 8.9%; the MOECC target is 10%. Water loss includes water
used for construction watermain commissioning (e.g. new mains and replacement mains),
water for temporary main supply during reconstruction, and water use for reactive
flushing (e.g. discoloured water).
IF1 - 12
City of Kitchener Water Distribution
DWQMS Management Review
Action: No further action required for information only
Effectiveness of the Risk Assessment Process
A risk assessment was completed on July 26, 2017. The purpose of the risk assessment
was to brainstorm potential risks and identify counter measures, where appropriate. The
following is a summary:
o Reviewed additional mandatory risks associated with climate change including:
long term impacts of climate change, water supply shortfall, extreme weather
events and sustained extreme temperatures.
o There were new critical control points added, however various work
instructions/capital improvements (e.g. additional pumps for watermain breaks,
additional protected bulk filling station) were made.
Summary of Cross Connection Program (includes the Bulk Water Fill) as of end of the
year: 2,100 services are protected by Backflow Prevention (BFP). More premises require
isolation than those that are protected (2,678 are not protected). Additional resources
were requested and approved under WIP for 2018.
IF1 - 13
City of Kitchener Water Distribution
DWQMS Management Review
Action: Proceed with plan to address backlog in 2018
Results of Internal and External Audits
An external audit was completed by a contractor (SAI Global) on June 8, 2017. No non-
conformances were found; however, the auditor recommended re-endorsement by
council after elections.
There have not been any non-conformances to date for the 2017/2018 (Sept-Sept) audits;
however, opportunities for improvement have been identified.
Action: Follow-up is required on various minor opportunities for improvement
Results of the Emergency Response Training/Testing
Emergency training for management staff was completed May 24 and November 29,
2017
IF1 - 14
City of Kitchener Water Distribution
DWQMS Management Review
Staff emergency training occurred in several sessions between February and June, 2017.
In addition, debriefs are also completed for selected events. For example, debriefs after
Boil Water and Drinking Water Advisories are completed to improve our processes.
Action: No further action required for information only
Operational Performance
Ongoing work with the Region for the Zone 2 and 4 Optimization this will improve
water pressures and supply in the south-eastern end of the city. The majority of the work
is Regional however; the City responsibilities include installation of PRVs, watermain
installation and operational valve closures. This work is dependent on timing of
development in the areas and as development proceeds, additional sections of the main
are installed.
watermain from the Mannheim Water Treatment plant across the southern portion of
the City. Work commenced in 2017 and will be ongoing.
Future upgrades to Strange St Pumping station (anticipated in 2019-2020) will include
additional treatment for manganese which will decrease discoloured water issues in the
surrounding area.
Action: No further action required for information only
Raw Water Supply and Drinking Water Quality Trends
There are known seasonal issues with the water supply:
Fall - Grand River temperature changes may cause odour challenges in the source water,
which may increase flushing requirements
Winter temperature extremes may cause more watermain breaks in the system
Two large diameter watermains were out of service (different times) on Ottawa St and Victoria
St due to construction activities. This combined with broken valves and watermains cut off for
reconstruction resulted in a concentrated area of low chlorine residuals in the area east of the
expressway and south of Victoria St. Additional flushing occurred to bring fresh water into this
area. The issues were resolved by turning on the mains (after construction) and replacing some
broken valves in late 2017.
Action: No further action required for information only
IF1 - 15
City of Kitchener Water Distribution
DWQMS Management Review
Follow-up on Action Items from Previous Management Reviews
Mobile project with direct data entry initial pilot project complete (gas valves), water
valve scheduled for spring 2018
Quarterly Joint Supervisor/Top Management Meetings
Action: Schedule quarterly meetings and follow-up water valve meeting
Status of Management Action Items Identified Between Reviews
There were no items identified between the management reviews. There have been changes in
Top Management in 2017.
Action: No further action required for information only
Changes that could Affect the Quality Management System
A revised DWQMS document was released in February 2017 (version 2.0). This version
includes mandatory review of potential climate change impacts as part of risk
assessment and additional guidance surrounding continual improvement.
An Overall Responsible Operator Agreement is required between the City and the
Region. The agreement formalizes the operating relationship between the two
municipalities with respect to dual (shared ownership) watermains. The agreement will
be brought forward to council once complete.
MOECC has a draft guidance document regarding the roles and responsibilities of the
ORO and OIC (Operator in Charge). Impacts are not yet known.
Changes have
been incorporated as part of watermain break procedures, however additional changes
regarding cut and caps and new watermain connections were implemented January 1,
2018. The additional requirements will result in increased coordination and workload for
supervisors and staff.
O.Reg 170/03 Drinking Water Systems and O.Reg. 169/03 Ontario Drinking Water
Quality Standards were updated with new sampling requirements for haloacetic acids
(HAAs) a disinfection by-product
Ministry of Environment and Climate Change Excess Soil Reuse Regulation
o Impacts how soil from excavations (e.g. watermain breaks) is sampled and
disposed of. This may have an impact on the overall cost of watermain breaks
Action: No further action required for information only
IF1 - 16
City of Kitchener Water Distribution
DWQMS Management Review
Consumer Feedback
The number of discoloured water calls has decreased largely due to proactive watermain
cleaning from 143 in 2016 to 47 in 2017. The large diameter watermains which were out
of service during the ION project are back in service.
Action: Continue with proposed watermain cleaning area in 2018 (see Appendix II map at end
of this document for approximate circled area).
Resources Needed to Maintain the Quality Management System
A mobile solution for inspection data entry would decrease administrative burden
working towards a second pilot project.
Proper completion of paperwork is an on-going struggle (e.g. valve replacements)
A dedicated QMS Specialist for the water. The role is currently split between gas and
water and there is a sufficient volume of work for two QMS positions.
Action: No further action required for information only
Results of the Infrastructure Review
WIP report identified long term asset planning and condition based assessment rather
than age based
Individual project selection is based on a number of factors including condition
(watermain break history), material, criticality, watermain size, presence of lead services,
shallow mains, and other infrastructure needs (storm, sanitary, road)
2017 reconstruction projects were completed as per the 2017 Road & Utility Capital
Forecast
2018 projects were finalized
Meetings were held with Asset Management and Engineering staff at both the City and
the Region to determine future project needs
Issue papers are brought forward as part of the budget process, additional funding
requests related to maintenance and water-only capital projects. The majority of water-
only projects are included as part of Regional road work to minimize disruptions to
citizens and be cost effective.
Action: No further action required for information only
IF1 - 17
City of Kitchener Water Distribution
DWQMS Management Review
Summary of Maintenance
Watermain cleaning - The 2017 watermain cleaning area generally bounded by Victoria
St N, the expressway, the Grand River and Fairway Rd N see below in light green. The
purpose of watermain cleaning is to remove naturally occurring iron and manganese
build up in the watermains. The iron and manganese cause discolouration in the water.
Although iron and manganese are not health related, discoloured water causes a public
perception of issues with the drinking water.
Watermain cleaning consists of two components: preparation of valves to ensure
isolation (infrastructure) and the cleaning of the water inside the mains (water quality).
The preparation component requires significant time to determine appropriate flushing
runs to obtain a clean water supply and move it through the system in a methodical
process by opening and closing valves and flushing. The watermain must be isolated via
valves for each run. Prior to cleaning the mains, all valves within the area must be
exercised, repaired and replaced, if required, so that isolation may be achieved.
Approximately 160 km of watermains were cleaned, 1300 valves operated, 75 valves in
the area were replaced prior to cleaning (2016-2017), 45 valves initially considered
inoperable were brought back into operational condition with new equipment
IF1 - 18
City of Kitchener Water Distribution
DWQMS Management Review
A valve turning/exercising program was completed the majority of valves were
operated in the watermain cleaning area with additional valve operation in areas of
reconstruction
Hydrant maintenance - spring and fall for all hydrants was completed - a contractor was
hired to assist. Follow-up work is ongoing.
Dead end main flushing to maintain chlorine residuals was completed in spring and fall
New development areas are flushed until the subdivision is built-up
Hydrant painting was not completed in 2017
The backlog of broken water valves was addressed in 2017 (64 valves were replaced)
Leak detection survey 1/3 of city completed each year. Follow-up is completed on
potential leaks. In 2017, approximately 300km of mains were surveyed resulting in the
identification of possible service leaks: 1 service leak (customer side) and 10 hydrant leaks.
Follow-up work for the hydrant leaks was complete.
A pilot satellite leak detection survey was completed in conjunction with the surrounding
municipalities; however the results were not as beneficial as anticipated.
Anodes are installed on existing watermains whenever they are exposed (e.g. watermain
breaks, valve repairs, hydrant repairs)
PRV maintenance was not completed in 2017. A number of replacement parts were
ordered and maintenance will be completed when the parts arrive and are installed.
Work is scheduled for early 2018.
Chamber inspections continued, chambers containing air relief valves were pumped out.
A data cleansing occurred to confirm which valves are in chambers, some follow-up
work is required. Where valves within chambers require replacement, they will be
replaced with direct bury valves, eliminating the chamber. There are over 700 chambers
within the system. Chambers are generally corrosive environments for water
infrastructure and can become road hazards if not maintained. Current standards are to
direct bury valves without chambers for the majority of installations.
Action: No further action required for information only
Effectiveness of Maintenance
The effectiveness of the maintenance program is determined by the following factors:
Number of Adverse Water Quality Incidents
Water loss/unaccounted for water
Water quality complaints
Number of watermain breaks
The number of AWQIs increased due to problem sites as a result of construction
IF1 - 19
City of Kitchener Water Distribution
DWQMS Management Review
Water loss/unaccounted for water decreased to 8.9%. The decrease is due to a
combination of events fewer watermain breaks, overall less consumption due to a wet
st
summer, changes in billing system (1 full year of SAP) and water meter replacements.
The number of quality complaints decreased in 2017 due to proactive watermain
cleaning and completion of the ION work in 2016
There were 79 watermain breaks in 2017, which is lower than the 5 year average of 110
breaks/year. This is largely due to the warmer winter
Action: No further action required for information only
Operational Plan Currency, Content and Updates
There was one significant change to the Operational Plan clarification that the City of
Kitchener will act as Overall Responsible Operator for the Dual (jointly owned between
Kitchener and Region) watermains. Past practice has been for the City to act as ORO for
dual watermains but an agreement must be signed to formalize responsibilities
Action: Bring Agreement forward to Council
Staff Suggestions
Although many documents/maps are updated and created throughout the year for continual
improvement, the following changes were made as a result of staff suggestions:
rd
Staff suggested a simplified process for 3 party inspection controlled reusable booklets
were created and new CityWorks templates.
Staff suggested a simplified form/templated for water adverse/flushing.
Demolition process was documented.
Action: No further action required for information only
Other
Water Meter Replacement - 5069 aging water meters were replaced. There are 66,100
meters in the system with a backlog of approximately 16,000 meters to be replaced
(replacement is targeted at 15 years). Meter replacements have been accelerated to
address the backlog since additional funding was received in 2015.
IF1 - 20
City of Kitchener Water Distribution
DWQMS Management Review
Water Consumption Trends water consumption continues to decline. Benefits are that
decreased consumption means that new sources of water are not needed (Great Lakes
Supply was moved out beyond 2051). The downside is decreased consumption means
decreased revenue while many costs are the same (fixed). For example, water sampling
costs are the same regardless of how much water is used. The decline in consumption is
attributed to a number of factors: water conservation and water efficiency efforts,
intensification and economic factors. The trend is projected to continue downwards
until 2018 (based on 2014 forecasting reports), when the population demand will
outpace water conservation measures.
It should be noted that the sanitary fees are based on the water consumption data so
when consumption declines, it impacts both the water and sanitary budgets.
IF1 - 21
City of Kitchener Water Distribution
DWQMS Management Review
Locates - Kitchener Utilities and their Locate Service Provider physically locate gas and
water infrastructure for contractors prior to construction and excavation work. When
infrastructure is not properly located, the contractor may damage the infrastructure. Gas
escapes may result in high risk/high impact incidents as well as claims and lawsuits.
Watermain damages may result in contamination of the drinking water supply and the
resulting pressure change may also damage connected mains and appurtenances. It is
essential that experienced personnel (with accurate drawings and proper locating
equipment) be responsible for locating infrastructure.
Increased number of locate requests; due to an increase in locate awareness (via the
Ministry of Labor and the Technical Standards and Safety Authority) and increased
construction activity within the City. From 2009 to 2017, there has been an increase in
the number of yearly locate requests from 9076 to 17541.
IF1 - 22
City of Kitchener Water Distribution
DWQMS Management Review
Benchmarking was completed for 2016 data, highlights include:
o Although the annual volume of watermain breaks has decreased (due to the mild
weather), the number of watermain breaks occurring are still higher than the
national mean;
o The preventative maintenance programs of watermain flushing and valve
exercising are significantly below the national median although efforts are being
made in these areas.
Action: No further action required for information only
IF1 - 23
City of Kitchener Water Distribution
DWQMS Management Review
Appendix 1
Water Distribution System Map
IF1 - 24
City of Kitchener Water Distribution
DWQMS Management Review
Appendix 11
Discoloured Water Locations and Proposed 2018 Cleaning Area Map
IF1 - 25
COMMUNITY & INFRASTRUCTURE SERVICES COMMITTEE
Page 1 UNFINISHED BUSINESS2018-03-05
DATE TARGET
SUBJECT (INITIATOR)INITIALLYDATE/STAFF
CONSIDEREDSTATUSASSIGNED
David Bergey Drive Bike Lane Implementation deferred
K.
May 1, 2017
2019Carmichael
Street South Reconstruction project scheduled for Report INS-17-033
2018/2019
IF2 - 1