Loading...
HomeMy WebLinkAboutFCS-18-023 - T18-014 Road Improvements, Road Surface Construction, Miscellaneous Asphalt and Concrete WorkREPORT TO: Committee of the Whole DATE OF MEETING: 2018-03-19 SUBMITTED BY: Michelle Palmer, Director of Supply Services 519-741-2200 ext. 7214 PREPARED BY: Adam Buchholtz, Buyer,519-741-2200 ext. 7217 WARD(S) INVOLVED: All DATE OF REPORT: 2018-03-08 REPORT NO.: FCS-18-023 SUBJECT: T18-014 Road Improvements, Road Surface Construction, Miscellaneous Asphalt and Concrete Work ___________________________________________________________________________ RECOMMENDATION: ThatTender T18-014 Road Improvements, Road Surface Construction, Miscellaneous Asphalt and Concrete Work, be awarded to Ekum-Sekum Incorporated o/a Brantco Construction, Cambridge, Ontario, at their tendered price of $4,600,000., including contingencies of $250,000., plus H.S.T. of $598,000., for a total of $5,198,000. BACKGROUND: The works in this tender include road rehabilitation, road surface paving of streets which were fully reconstructed (under Accelerated Infrastructural Renewal Program (AIRP)) within the last two (2) years, laneway rehabilitation, and miscellaneous asphalt, and concrete type work funded by other departments. Please refer to Appendix Afor a complete list of projects to be completed under this tender. REPORT: Tenders were advertised on the City of Kitchener website. Documents were downloaded by twenty-one (21) interested parties and by the closing date of Thursday March 8, 2018,five (5) tenders had been received. The tenders were reviewed by R. Trussler,Engineering Construction Project Manager, W.Kinnaird, Engineering Construction Inspector and A. Buchholtz, Buyer who concur with the above recommendation. *** This information is available in accessible formats upon request. *** Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. 1.i - 1 The following tenders were received: Bid Price Ekum-Sekum Incorporated o/a Brantco Construction Cambridge ON $5,198,000.00* E & E Seegmiller Limited Kitchener ON $5,388,421.41 Steed and Evans Limited St. Jacobs ON $5,417,220.01 Coco Paving Inc. Petersburg ON $5,488,410.00 Capital Paving Inc. Guelph ON $6,211,148.01 ALIGNMENT WITH CITY OF KITCHENER STRATEGIC PLAN: vision through the delivery of core service. FINANCIAL IMPLICATIONS: In addition to the costs anticipated in this tender, the design and implementationof these types of projects typically involves city staff and resources from across the corporation. These costs are included in the line item "Projected Costs: Staff Time/Permitting/Material testing", and will be itemized when they exceed $125,000. Included in this line item are staff time and expenses for all city staff in support of the project such as Engineering, Kitchener Utilities, and Transportation Planning. The line item also includes all regulatory permitting, geotechnical and material testing, detouring and traffic control, alternate access and parking requirements and any other miscellaneous costs. Projects utilizing in-house staff will include costs for inspection during construction and contract administration. The net cost for this tender (A), is fair and reasonable for a purchase of this scope and the upset limit is within the budget allowance (B) provided within the budget. Funding for this purchase is included within the approved capital budget. The estimated surplus (E)will remain within the project to be used towards the 2019 road resurfacing program. 1.i - 2 Tender T18-014 Road Improvement, Road Surface Construction, Misc. Asphalt and Concrete Work The total budget for this project is $5,908,318.00 Estimated Cost for this Phase of Work Tender T18-014 costs, including HST5,198,000.00 less: HST rebate on tender(517,039.77) Net Cost Being Awarded4,680,960.23 A Costs Incurred to Date - Projected Costs: Staff Time218,106.20 Projected Costs: Geotechnical90,000.00 Total Estimated Cost for this Phase of Work$4,989,066.43 C Budget for this Phaseof Work WIP -Road Reconstruction -Sanitary Utility573,497.00 WIP -Road Reconstruction -Stormwater Utility286,748.00 WIP -Road Reconstruction -Water Utility386,487.00 Sanitary Utility 34,430.00 Stormwater Utility 88,697.00 Water Utility 83,335.00 Gas Utility 40,673.00 Federal Gas Tax3,878,653.00 Capital out of Current506,414.00 WIP Road Reconstruction General Account 29,384.00 Total Budget for this Work$5,908,318.00 B Estimated Surplus/(Deficit) for this Phase of Work (B -C)919,251.57 D Balance in account, net of encumbrances(510,614.41) Total Estimated Surplus/(Deficit) $408,637.16 E COMMUNITY ENGAGEMENT: INFORM advance of the council / committee meeting. PREVIOUS CONSIDERATION OF THIS MATTER: Not applicable ACKNOWLEDGED BY: Lesley MacDonald, Acting Deputy CAO, Finance and Corporate Services 1.i - 3 Appendix A T18-014 Road Improvements, Road Surface Construction, Miscellaneous Asphalt and Concrete Work Tender Street Listing 2018 Road Rehabilitation List A.Full Depth Milling + Asphalt Road Replacement STREETFROM_STREETTO_STREETWARD 1EASTWOOD DRPENROSE AVEDALEWOOD DR2 2GRAND RIVER MORRISON RDTINITAWA CRT2 BLVD 3OLD CARRIAGE PIONEER DRHOMER WATSON 4 DRBLVD 4PINEDALEDR WILKINS STWILLIAMSBURG 6 RD 5PIONEER DRDOON VILLAGE UPPER CANADA 4 RDDR 6RIVER RD E VICTORIA STMANCHESTER ST1 7ST. GEORGE STBENTON STQUEEN ST. S.9 8SUNSET PL UNION STEND10 9YELLOW BIRCH IRA NEEDLES DRIFTWOOD DR7 DRBLVD B.Pulverize and Overlay STREETFROM_STREETTO_STREETWARD 1HAHN PLHEARTH CRQUEENS BLVD8 2HEARTH CRES HAHN PLHAHN PL8 3RAYLENE DRHEARTH CRESEND8 4BUTLER LANEHIGHLAND RDHEARTH CRES8 5HURON RD TRUSSLER RDFISCHER 5 HALLMAN BLVD 6SPRINGDALE DRLANG CRESEND1 1.i - 4 C.Laneways Rehabilitation STREETFROM_STREETTO_STREETWARD 1LANEWAY 50162BETWEEN #38 END10 AND #46 AHRENS ST W 2LANEWAY 50034BETWEEN #82AND MARGARET AVE10 #84 AHRENS ST W D.Surface Asphalt STREETFROM_STREETTO_STREETWARD 1DELISLE AVEMOORE AVEDECAY ST10 2PELTZ AVEMOORE AVEWATERLOO ST10 3PALMER AVECOURTLAND AVE HURST AVE9 E 4KENNEDY AVE KENT AVEPALMER AVE9 5STAHL AVE DUKE ST WEND10 6WILHELM STDUKE STWEBER ST W10 7DONELY ST HOFFMAN STEND9 8KELVIN AVEDONELY STEND9 9MEINZINGER AVE BORDEN PKWYHOFFMAN ST9 10UNION ST LANCASTER ST WSERADA RD10 11MAPLE AVEUNION STARNOLD ST10 12SIEBERT AVE CLARK AVETRAYNOR AVE3 13DANE ST KING STBORDEN AVE N10 1.i - 5 14CRESCENT STDANE STONWARD AVE10 15DUCHESSAVE DUNBAR RDMARINA RD8 16MARINA RD BRANDON AVESOUTH END8 17ABERDEEN RDCLAREMONT AVEGLASGOW ST8 18WOODLAND AVERUSSELL STMILL ST9 19RUSSEL ST SPADINA RD ESTIRLING AVE S9 20BREITHAUPT STST. LEGER STLANCASTER ST10 21MAJOR ST WELLINGTON STBREITHAUPT ST10 22GLENDALE RD MERNER AVEMELROASE AVE10 23PANDORA AVEEAST AVEMELROSE AVE10 24VISTA CR LAKESIDE DRLAKESIDE DR8 25LAKESIDE DRVISTACRBLUERIDGE AVE8 27BRANT CRGLEN RDGLEN RD9 28ST. CLAIR AVE GLEN RD60 meters9 30GLEN RDHIGHLAND RD WPLEASANT AVE9 31DUMFRIES KRUG STSTIRLING AVE10 32FAIRFIELD AVE RIDGEWOOD AVEEDWIN ST10 33GUELPH ST ELLIS AVEMARGARET AVE10 34BRUNSWICK AVEGUELPH STBLUCHER ST10 1.i - 6 35WILHELM STAHRENS STMARGARET AVE10 36CHERRY ST WEST ENDSTRANGE ST9 E.Miscellaneous Asphalt / Concrete work STREETFROM_STREETTO_STREETWARD 1Random Utility TBDTBD Cuts / 5-Location 2Drainage TBDTBD Improvements 3Kiwanis Parking 1 Lot 4Laurentian Trail #1Laurentian RDWestmount Rd E6 5Laurentian Trail #2Westmount Rd EWilliamsburg Rd6 6Victoria Park Mill StQueen St9 Access Trail 5Breithaupt ParkUnion BlvdUnion Blvd10 F.Provisional Streets STREETFROM_STREETTO_STREETWARD 1CORAL PLEASANT WEST END9 CRESCENTAVENUE 2DOON VILLAGE BECHTEL DRIVEPIONEER DRIVE4 ROAD 3PLEASANT STIRLING AVENUEGLEN ROAD9 AVENUE 4STIRLING BRIDGE BRIDGE 9 AVENUE APPROACHE APPROACH COURTLAND TO COURTLAND TO MILLMILL 1.i - 7